Four independent projects (1, 2, 3, and 4) are proposed for investment by Perfect Manufacturing, Inc. List all the acceptable mutually exclusive bundles based on the following selection restrictions developed by the department of engineering production:
Project 2 can be selected only if project 3 is selected. Projects 1 and 4 should not both be selected;
they are essentially duplicates.
Project 2 can be selected only if project 3 is selected. Projects 1 and 4 should not both be selected;
they are essentially duplicates.