
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
النسخة 7الرقم المعياري الدولي: 978-0073376301
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
النسخة 7الرقم المعياري الدولي: 978-0073376301 تمرين 51
The Department of Defense uses area cost factors (ACFs) to adjust for differences in construction costs in different parts of the country (and world). The area cost factor for Andros Island in the Bahamas is 1.70 while the ACF for Rapid City, South Dakota, is 0.93. If a cold storage processing warehouse costs $1,350,000 in Rapid City, estimate the cost for Andros Island.
التوضيح
The formula to calculate cost ...
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

