
Basics of Engineering Economy 1st Edition by Leland Blank,Anthony Tarquin
النسخة 1الرقم المعياري الدولي: 9780073401294
Basics of Engineering Economy 1st Edition by Leland Blank,Anthony Tarquin
النسخة 1الرقم المعياري الدولي: 9780073401294 تمرين 9
A consulting engineering firm is preparing a preliminary cost estimate for a design/construct project of a brackish groundwater desalting plant.The firm, which completed a similar project in 2001 with a construction cost of $0 million, wants to use the ENR construction cost index to update the cost.Estimate the cost of construction for a similar- size plant in mid-2006 when the index value was 7700.
التوضيح
Cost index is the ratio of cost of some ...
Basics of Engineering Economy 1st Edition by Leland Blank,Anthony Tarquin
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

