
Basics of Engineering Economy 2nd Edition by Anthony Tarquin,Leland Blank
النسخة 2الرقم المعياري الدولي: 978-0073376356
Basics of Engineering Economy 2nd Edition by Anthony Tarquin,Leland Blank
النسخة 2الرقم المعياري الدولي: 978-0073376356 تمرين 9
Estimate the approximate beforetax rate of return (ROR) r a project that has a first cost of $750,000 and a salvage value of 25% of the first cost after three years. The project's NOI is $260,000. Assume an effective tax rate of 37%.
التوضيح
The first cost of the project is $750,00...
Basics of Engineering Economy 2nd Edition by Anthony Tarquin,Leland Blank
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

