
Managerial Economics & Organizational Architecture 5th Edition by James Brickley, Jerold Zimmerman, Clifford Smith
النسخة 5الرقم المعياري الدولي: 978-0073375823
Managerial Economics & Organizational Architecture 5th Edition by James Brickley, Jerold Zimmerman, Clifford Smith
النسخة 5الرقم المعياري الدولي: 978-0073375823 تمرين 3
You are a manager of a division of a company that is responsible for the final assembly of two computer products, modems and keyboards. You manage two employees, Julio and Chenyu, who each work 8 hours per day. Currently you have assigned both Julio and Chenyu to spend the first 7 hours of the day assembling keyboards and the last hour assembling modems. Julio can assemble 2 modems per hour and 14 keyboards per hour. Chenyu is more highly skilled in both activities. She averages 3 modems per hour and 15 keyboards per hour.
What are potential reasons why you might not want to change the work assignments (assume that more assembly of either or both products is desirable)
What are potential reasons why you might not want to change the work assignments (assume that more assembly of either or both products is desirable)
التوضيح
Workers have different ability to produc...
Managerial Economics & Organizational Architecture 5th Edition by James Brickley, Jerold Zimmerman, Clifford Smith
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

