
Accounting 26th Edition by Carl Warren ,Jim Reeve ,Jonathan Duchac
النسخة 26الرقم المعياري الدولي: 978-1337498159
Accounting 26th Edition by Carl Warren ,Jim Reeve ,Jonathan Duchac
النسخة 26الرقم المعياري الدولي: 978-1337498159 تمرين 36
Factory overhead cost variances
The following data relate to factory overhead cost for the production of 10,000 computers:
If productive capacity of 100% was 15,000 hours and total factory overhead cost budgeted at the level of 14,000 standard hours was $356,000, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $6.00 per hour.
The following data relate to factory overhead cost for the production of 10,000 computers:
If productive capacity of 100% was 15,000 hours and total factory overhead cost budgeted at the level of 14,000 standard hours was $356,000, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $6.00 per hour.
التوضيح
Variance analysis:
The analysis of the ...
Accounting 26th Edition by Carl Warren ,Jim Reeve ,Jonathan Duchac
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

