expand icon
book Introduction to Management Science 12th Edition by Bernard Taylor cover

Introduction to Management Science 12th Edition by Bernard Taylor

النسخة 12الرقم المعياري الدولي: 978-0133778847
book Introduction to Management Science 12th Edition by Bernard Taylor cover

Introduction to Management Science 12th Edition by Bernard Taylor

النسخة 12الرقم المعياري الدولي: 978-0133778847
تمرين 39
A plant has four operators to be assigned to four machines. The time (minutes) required by each worker to produce a product on each machine is shown in the following table:
A plant has four operators to be assigned to four machines. The time (minutes) required by each worker to produce a product on each machine is shown in the following table:    Determine the optimal assignment and compute total minimum time. Determine the optimal assignment and compute total minimum time.
التوضيح
موثّق
like image
like image

First, put together the linear programmi...

close menu
Introduction to Management Science 12th Edition by Bernard Taylor
cross icon