expand icon
book Matching Supply with Demand 3rd Edition by Gerard Cachon,Christian Terwiesch cover

Matching Supply with Demand 3rd Edition by Gerard Cachon,Christian Terwiesch

النسخة 3الرقم المعياري الدولي: 978-0073525204
book Matching Supply with Demand 3rd Edition by Gerard Cachon,Christian Terwiesch cover

Matching Supply with Demand 3rd Edition by Gerard Cachon,Christian Terwiesch

النسخة 3الرقم المعياري الدولي: 978-0073525204
تمرين 2
(Process Analysis with Multiple Flow Units) Consider a process consisting of five resources that are operated eight hours per day. The process works on three different products, A, B, and C:
(Process Analysis with Multiple Flow Units) Consider a process consisting of five resources that are operated eight hours per day. The process works on three different products, A, B, and C:    Demand for the three different products is as follows: product A, 40 units per day; product B, 50 units per day; and product C, 60 units per day. What is the bottleneck What is the flow rate for each flow unit assuming that demand must be served in the mix described above (i.e., for every four units of A, there are five units of B and six units of C) Demand for the three different products is as follows: product A, 40 units per day; product B, 50 units per day; and product C, 60 units per day.
What is the bottleneck What is the flow rate for each flow unit assuming that demand must be served in the mix described above (i.e., for every four units of A, there are five units of B and six units of C)
التوضيح
موثّق
like image
like image

The output rate or the capacity of a pro...

close menu
Matching Supply with Demand 3rd Edition by Gerard Cachon,Christian Terwiesch
cross icon