
Cornerstones of Managerial Accounting 4th Edition by Maryanne Mowen, Don Hansen, Dan Heitger
النسخة 4الرقم المعياري الدولي: 978-0324380767
Cornerstones of Managerial Accounting 4th Edition by Maryanne Mowen, Don Hansen, Dan Heitger
النسخة 4الرقم المعياري الدولي: 978-0324380767 تمرين 46
Using High-Low to Calculate Predicted Total Variable Cost and Total Cost for a Time Period that Differs from the Data Period
Pizza Vesuvio makes specialty pizzas. Data for the past eight months were collected:
Refer to the information for Pizza Vesuvio on the previous page. Assume that this information was used to construct the following formula for monthly labor cost.
Required:
Assume that 4,000 employee hours are budgeted for the coming year. Use the total labor cost formula to make the following calculations:
1. Calculate total variable labor cost for the year.
2. Calculate total fixed labor cost for the year.
3. Calculate total labor cost for the coming year.
Pizza Vesuvio makes specialty pizzas. Data for the past eight months were collected:
Refer to the information for Pizza Vesuvio on the previous page. Assume that this information was used to construct the following formula for monthly labor cost.
Required:
Assume that 4,000 employee hours are budgeted for the coming year. Use the total labor cost formula to make the following calculations:
1. Calculate total variable labor cost for the year.
2. Calculate total fixed labor cost for the year.
3. Calculate total labor cost for the coming year.
التوضيح
High-low method:
Under this method, the...
Cornerstones of Managerial Accounting 4th Edition by Maryanne Mowen, Don Hansen, Dan Heitger
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

