تمرين 26
Consider the two mutually exclusive service projects in Table 1.
Table 1
Consider the two mutually exclusive service projects in Table 1. Table 1    Assuming that you need service of either machine for an indefinite period, which project would be selected at i = 16% Assume that both types of machine are available with the same costs and benefits during the planning horizon. Assuming that you need service of either machine for an indefinite period, which project would be selected at i = 16% Assume that both types of machine are available with the same costs and benefits during the planning horizon.
التوضيح
موثّق
like image
like image

Discounted Cash Flow Technique (DCF's): ...