expand icon
book Contemporary Engineering Economics 6th Edition by Chan Park cover

Contemporary Engineering Economics 6th Edition by Chan Park

النسخة 6الرقم المعياري الدولي: 978-0134105598
book Contemporary Engineering Economics 6th Edition by Chan Park cover

Contemporary Engineering Economics 6th Edition by Chan Park

النسخة 6الرقم المعياري الدولي: 978-0134105598
تمرين 34
Consider the two mutually exclusive projects in Table.
Salvage values represent the net proceeds (after tax) from disposal of the assets if they are sold at the end of each year. Both projects Bl and B2 will be available (or can be repeated) with the same costs and salvage values for an indefinite period.
(a) Assuming an infinite planning horizon, which project is a better choice at MARR = 12%
(b) With a 10-year planning horizon, which project is a better choice at MARR = 12%
TABLE 49
Consider the two mutually exclusive projects in Table. Salvage values represent the net proceeds (after tax) from disposal of the assets if they are sold at the end of each year. Both projects Bl and B2 will be available (or can be repeated) with the same costs and salvage values for an indefinite period. (a) Assuming an infinite planning horizon, which project is a better choice at MARR = 12%  (b) With a 10-year planning horizon, which project is a better choice at MARR = 12%  TABLE 49
التوضيح
موثّق
like image
like image

There are two investment projects which ...

close menu
Contemporary Engineering Economics 6th Edition by Chan Park
cross icon