expand icon
book Contemporary Engineering Economics 6th Edition by Chan Park cover

Contemporary Engineering Economics 6th Edition by Chan Park

النسخة 6الرقم المعياري الدولي: 978-0134105598
book Contemporary Engineering Economics 6th Edition by Chan Park cover

Contemporary Engineering Economics 6th Edition by Chan Park

النسخة 6الرقم المعياري الدولي: 978-0134105598
تمرين 32
Mike Lazenby, an industrial engineer at Energy Conservation Service, has found that the anticipated profitability of a newly developed water-heater temperature-control device can be measured by
present worth with the formula
NPW = 4.028 V (2 X $11) 77,860
where V is the number of units produced and sold and X is the sales price per unit. Mike also has found that the value of the parameter V could occur anywhere over the range from 1,000 to 6,000 units and that of the parameter X anywhere between $20 and. $45 per unit. Develop a sensitivity graph as a function of the number of units produced and the sales price per unit.
التوضيح
موثّق
like image
like image
close menu
Contemporary Engineering Economics 6th Edition by Chan Park
cross icon