
Contemporary Engineering Economics 6th Edition by Chan Park
النسخة 6الرقم المعياري الدولي: 978-0134105598
Contemporary Engineering Economics 6th Edition by Chan Park
النسخة 6الرقم المعياري الدولي: 978-0134105598 تمرين 3
A city government is considering two types of town-dump sanitary systems. Design A requires an initial outlay of $400,000 with annual operating and maintenance costs of $50,000 for the next 15 years; design B calls for an investment of $300,000 with annual operating and maintenance costs of $80,000 per year for the next 15 years. Fee collections from the residents would again be $85,000 per year. The interest rate is 8%, and no salvage value is associated with either system.
(a) Using the benefit-cost ratio BC( i ) which system should be selected
(b) If a new design (design C), which requires an initial outlay of $350,000 and annual operating and maintenance costs of $65,000, is proposed, would your answer in part (a) change
(a) Using the benefit-cost ratio BC( i ) which system should be selected
(b) If a new design (design C), which requires an initial outlay of $350,000 and annual operating and maintenance costs of $65,000, is proposed, would your answer in part (a) change
التوضيح
The sixteenth chapter that is in the tex...
Contemporary Engineering Economics 6th Edition by Chan Park
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

