expand icon
book Contemporary Engineering Economics 6th Edition by Chan Park cover

Contemporary Engineering Economics 6th Edition by Chan Park

النسخة 6الرقم المعياري الدولي: 978-0134105598
book Contemporary Engineering Economics 6th Edition by Chan Park cover

Contemporary Engineering Economics 6th Edition by Chan Park

النسخة 6الرقم المعياري الدولي: 978-0134105598
تمرين 3
A city government is considering two types of town-dump sanitary systems. Design A requires an initial outlay of $400,000 with annual operating and maintenance costs of $50,000 for the next 15 years; design B calls for an investment of $300,000 with annual operating and maintenance costs of $80,000 per year for the next 15 years. Fee collections from the residents would again be $85,000 per year. The interest rate is 8%, and no salvage value is associated with either system.
(a) Using the benefit-cost ratio BC( i ) which system should be selected
(b) If a new design (design C), which requires an initial outlay of $350,000 and annual operating and maintenance costs of $65,000, is proposed, would your answer in part (a) change
التوضيح
موثّق
like image
like image

The sixteenth chapter that is in the tex...

close menu
Contemporary Engineering Economics 6th Edition by Chan Park
cross icon