expand icon
book Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender cover

Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender

النسخة 2الرقم المعياري الدولي: 978-0072328882
book Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender cover

Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender

النسخة 2الرقم المعياري الدولي: 978-0072328882
تمرين 6
Prepare a lost estimate for the construction of a small, high quality, office building that contains 18,525 square feet of floor area. Use the data in Table 5-1 to prepare the estimate. Assume the cost of design for the project is 7% of construction, and a site-work cost of $180,000. What range or percentage of this cost would you recommend to define the level of accuracy
التوضيح
موثّق
like image
like image

Since a high quality office bu...

close menu
Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender
cross icon