expand icon
book Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender cover

Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender

النسخة 2الرقم المعياري الدولي: 978-0072328882
book Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender cover

Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender

النسخة 2الرقم المعياري الدولي: 978-0072328882
تمرين 3
Perform a cost analysis based on an earl start and late start schedule for the project in Question #2. Plot the S-curve for the early and late start costs. Show costs on the left-hand ordinate and percent cost on the right-hand. Along the abscissa, show the time in working days and %-duration.
التوضيح
like image
like image
no-answer
هذا السؤال ليس له إجابة موثقة من أحد الخبراء بعد، دع الذكاء الاصطناعي Copilot في كويز بلس يساعدك في إيجاد الحل.
close menu
Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender
cross icon