expand icon
book Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender cover

Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender

النسخة 2الرقم المعياري الدولي: 978-0072328882
book Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender cover

Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender

النسخة 2الرقم المعياري الدولي: 978-0072328882
تمرين 4
The design team for a project has met and determined the grouping of tasks required for the design effort into six categories., The team has also agreed on the following criteria for the weight multipliers to be used to track the design effort. Prepare a graph that shows the relationship between work and time.
التوضيح
موثّق
like image
like image

blured image Calculations for the composit...

close menu
Instructor's Manual to Accompany Project Management for Engineering and Construction 2nd Edition by Oberlender
cross icon