
Fundamental Accounting Principles 22th Edition by John Wild ,Ken Shaw,Barbara Chiappetta
النسخة 22الرقم المعياري الدولي: 978-0077862275
Fundamental Accounting Principles 22th Edition by John Wild ,Ken Shaw,Barbara Chiappetta
النسخة 22الرقم المعياري الدولي: 978-0077862275 تمرين 2
Refer to information in Problem 23-4B.
Required
Compute these variances: (a) variable overhead spending and efficiency, (b) fixed overhead spending and volume, and (c) total overhead controllable.
Reference: Problem 23-4B.
Kryll Company set the following standard unit costs for its single product.
The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 60,000 units per quarter. The following flexible budget information is available.
During the current quarter, the company operated at 70% of capacity and produced 42,000 units of product; direct labor hours worked were 250,000. Units produced were assigned the following standard costs:
Actual costs incurred during the current quarter follow:
Required
1. Compute the direct materials cost variance, including its price and quantity variances.
2. Compute the direct labor cost variance, including its rate and efficiency variances.
3. Compute the total overhead controllable and volume variances.

Required
Compute these variances: (a) variable overhead spending and efficiency, (b) fixed overhead spending and volume, and (c) total overhead controllable.
Reference: Problem 23-4B.
Kryll Company set the following standard unit costs for its single product.
The predetermined overhead rate is based on a planned operating volume of 80% of the productive capacity of 60,000 units per quarter. The following flexible budget information is available.
During the current quarter, the company operated at 70% of capacity and produced 42,000 units of product; direct labor hours worked were 250,000. Units produced were assigned the following standard costs:
Actual costs incurred during the current quarter follow:
Required
1. Compute the direct materials cost variance, including its price and quantity variances.
2. Compute the direct labor cost variance, including its rate and efficiency variances.
3. Compute the total overhead controllable and volume variances.

التوضيح
When there is difference between the act...
Fundamental Accounting Principles 22th Edition by John Wild ,Ken Shaw,Barbara Chiappetta
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

