
Business Law 13th Edition by Frank Cross, Kenneth Clarkson, Roger LeRoy Miller
النسخة 13الرقم المعياري الدولي: 978-1133046783
Business Law 13th Edition by Frank Cross, Kenneth Clarkson, Roger LeRoy Miller
النسخة 13الرقم المعياري الدولي: 978-1133046783 تمرين 1
Measure of Damages. Before buying a house, Dean and Donna Testa hired Ground Systems, Inc. (GSI), to inspect the sewage and water disposal system. GSI reported a split system with a watertight septic tank, a wastewater tank, a distribution box, and a leach field. The Testas bought the house. Later, Dean saw that the system was not as GSI described-there was no distribution box or leach field, and there was only one tank, which was not watertight. The Testas arranged for the installation of a new system and sold the house. Assuming that GSI is liable for breach of contract, what is the measure of damages? [Testa v. Ground Systems, Inc., 206 N.J. 330, 20 A.3d 435 (App.Div. 2011)] (See page 348.)
التوضيح
Measurement of Damages.
The GSI will be...
Business Law 13th Edition by Frank Cross, Kenneth Clarkson, Roger LeRoy Miller
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

