
Business Law Today, Comprehensive 10th Edition by Roger LeRoy Miller
النسخة 10الرقم المعياري الدولي: 978-1305081604
Business Law Today, Comprehensive 10th Edition by Roger LeRoy Miller
النسخة 10الرقم المعياري الدولي: 978-1305081604 تمرين 3
Damages. Before buying a house, Dean and Donna Testa hired Ground Systems, Inc. (GSI), to inspect the sewage and water disposal system. GSI reported a split system with a watertight septic tank, a wastewater tank, a distribution box, and a leach field. The Testas bought the house. Later, Dean saw that the system was not as GSI described-there was no distribution box or leach field, and there was only one tank, which was not watertight. The Testas arranged for the installation of a new system and sold the house. Assuming that GSI is liable for breach of contract, what is the measure of damages
التوضيح
Compensatory damages refer to the compen...
Business Law Today, Comprehensive 10th Edition by Roger LeRoy Miller
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255

