International Management 8th Edition by Fred Luthans,Jonathan Doh
النسخة 8الرقم المعياري الدولي: 978-0078112577
International Management 8th Edition by Fred Luthans,Jonathan Doh
النسخة 8الرقم المعياري الدولي: 978-0078112577 تمرين 49
Euro Disneyland
On January 18, 1993, Euro Disneyland chairperson Robert Fitzpatrick announced he would leave that post on April 12 to begin his own consulting company.Quitting his position exactly one year after the grand opening of Euro Disneyland, Fitzpatrick with his resignation removed U.S.management from the helm of the French theme park and resort.
Fitzpatrick's position was taken by a Frenchman, Philippe Bourguignon, who had been Euro Disneyland's senior vice president for real estate.Bourguignon, 45 years old, faced a net loss of FFr 188 million for Euro Disneyland's fiscal year, which ended September 1992.Also, between April and September 1992, only 29 percent of the park's total visitors were French.Expectations were that closer to half of all visitors would be French.
It was hoped that the promotion of Philippe Bourguignon would have a public relations benefit for Euro Disneyland-a project that had been a publicist's nightmare from the beginning.One of the low points was at a news conference prior to the park's opening when protesters pelted Michael Eisner, CEO of the Walt Disney Company, with rotten eggs.Within the first year of operation, Disney had to compromise its "squeaky clean" image and lift the alcohol ban at the park.Wine is now served at all major restaurants.
Euro Disneyland, 49 percent owned by Walt Disney Company, Burbank, California, originally forecasted 11 million visitors in the first year of operation.In January 1993 it appeared attendance would be closer to 10 million.In response, management temporarily slashed prices at the park for local residents to FFr 150 ($27.27) from FFr 225 ($40.91) for adults and to FFr 100 from FFr 150 for children in order to lure more French during the slow, wet winter months.The company also reduced prices at its restaurants and hotels, which registered occupancy rates of just 37 percent.
Bourguignon also faced other problems, such as the second phase of development at Euro Disneyland, which was expected to start in September 1993.It was unclear how the company planned to finance its FFr 8-10 billion cost.The company had steadily drained its cash reserves (FFr 1.9 billion in May 1993) while piling up debt (FFr 21 billion in May 1993).Euro Disneyland admitted that it and the Walt Disney Company were "exploring potential sources of financing for Euro Disneyland." The company was also talking to banks about restructuring its debts.
Despite the frustrations, Eisner was tirelessly upbeat about the project."Instant hits are things that go away quickly, and things that grow slowly and are part of the culture are what we look for," he said."What we created in France is the biggest private investment in a foreign country by an American company ever.And it's gonna pay off."
In the Beginning
Disney's story is the classic American rags-to-riches story, which started in a small Kansas City advertising office where Mickey was a real mouse prowling the unknown Walt Disney floor.Originally, Mickey was named Mortimer, until a dissenting Mrs.Disney stepped in.How close Mickey was to Walt Disney is evidenced by the fact that when filming, Disney himself dubbed the mouse's voice.Only in later films did Mickey get a different voice.Disney made many sacrifices to promote his hero-mascot, including selling his first car, a beloved Moon Cabriolet, and humiliating himself in front of Louis B.Mayer."Get that mouse off the screen!" was the movie mogul's reported response to the cartoon character.Then, in 1955, Disney had the brainstorm of sending his movie characters out into the "real" world to mix with their fans, and he battled skeptics to build the very first Disneyland in Anaheim, California.
When Disney died in 1966, the company went into virtual suspended animation.Its last big hit of that era was 1969's The Love Bug, about a Volkswagen named Herbie.Today, Disney executives trace the problem to a tyrannical CEO named E.Cardon Walker, who ruled the company from 1976 to 1983, and to his successor, Ronald W.Miller.Walker was quick to ridicule underlings in public and impervious to any point of view but his own.He made decisions according to what he thought Walt would have done.Executives clinched arguments by quoting Walt like the Scriptures or Marx, and the company eventually supplied a little book of the founder's sayings.Making the wholesome family movies Walt would have wanted formed a key article of Walker's creed.For example, a poster advertising the unremarkable Condorman featured actress Barbara Carrera in a slit skirt.Walker had the slit painted over.With this as the context, studio producers ground out a thin stream of tired, formulaic movies that fewer and fewer customers would pay to see.In mid-1983, a similar low-horsepower approach to television production led to CBS's cancellation of the hour-long program Walt Disney, leaving the company without a regular network show for the first time in 29 years.Like a reclusive hermit, the company lost touch with the contemporary world.
Ron Miller's brief reign was by contrast a model of decentralization and delegation.Many attributed Miller's ascent to his marrying the boss's daughter rather than to any special gift.To shore Miller up, the board installed Raymond L.Watson, former head of the Irvine Co., as part-time chairperson.He quickly became full time.
Miller sensed the studio needed rejuvenation, and he managed to produce the hit film Splash, featuring an apparently (but not actually) bare-breasted mermaid, under the newly devised Touchstone label.However, the reluctance of freelance Hollywood talent to accommodate Disney's narrow range and stingy compensation often kept his sound instincts from bearing fruit."Card [Cardon Walker] would listen but not hear," said a former executive."Ron [Ron Miller] would listen but not act."
Too many box office bombs contributed to a steady erosion of profit.Profits of $135 million on revenues of $915 million in 1980 dwindled to $93 million on revenues of $1.3 billion in 1983.More alarmingly, revenues from the company's theme parks, about three-quarters of the company's total revenues, were showing signs of leveling off.Disney's stock slid from $84.375 a share to $48.75 between April 1983 and February 1984.
Through these years, Roy Disney Jr.simmered while he watched the downfall of the national institution that his uncle, Walt, and his father, Roy Disney Sr., had built.He had long argued that the company's constituent parts all worked together to enhance each other.If movie and television production weren't revitalized, not only would that source of revenue disappear but the company and its activities would also grow dim in the public eye.At the same time the stream of new ideas and characters that kept people pouring into the parks and buying toys, books, and records would dry up.Now his dire predictions were coming true.His own personal shareholding had already dropped from $96 million to $54 million.Walker's treatment of Ron Miller as the shining heir apparent and Roy Disney as the idiot nephew helped drive Roy to quit as Disney vice president in 1977 and to set up Shamrock Holdings, a broadcasting and investment company.
In 1984, Roy teamed up with Stanley Gold, a tough-talking lawyer and a brilliant strategist.Gold saw that the falling stock price was bound to flush out a raider and afford Roy Disney a chance to restore the company's fortunes.They asked Frank Wells, vice chairperson of Warner Bros., if he would take a top job in the company in the event they offered it.Wells, a lawyer and a Rhodes scholar, said yes.With that, Roy knew that what he would hear in Disney's boardroom would limit his freedom to trade in its stock, so he quit the board on March 9, 1984."I knew that would hang a 'For Sale' sign over the company," said Gold.
By resigning, Roy pushed over the first of a train of dominoes that ultimately led to the result he most desired.The company was raided, almost dismantled, greenmailed, raided again, and sued left and right.But it miraculously emerged with a skilled new top management with big plans for a bright future.Roy Disney proposed Michael Eisner as the CEO, but the board came close to rejecting Eisner in favor of an older, more buttoned-down candidate.Gold stepped in and made an impassioned speech to the directors."You see guys like Eisner as a little crazy...but every studio in this country has been run by crazies.What do you think Walt Disney was? The guy was off the goddamned wall.This is a creative institution.It needs to be run by crazies again."
Meanwhile Eisner and Wells staged an all-out lobbying campaign, calling on every board member except two, who were abroad, to explain their views about the company's future."What was most important," said Eisner, "was that they saw I did not come in a tutu, and that I was a serious person, and I understood a P L, and I knew the investment analysts, and I read Fortune."
In September 1984, Michael Eisner was appointed CEO and Frank Wells became president.Jeffrey Katzenberg, the 33-year-old, maniacal production chief, followed Fisher from Paramount Pictures.He took over Disney's movie and television studios."The key," said Eisner, "is to start off with a great idea."
Disneyland in Anaheim, California
For a long time, Walt Disney had been concerned about the lack of family-type entertainment available for his two daughters.The amusement parks he saw around him were mostly filthy traveling carnivals.They were often unsafe and allowed unruly conduct on the premises.Disney envisioned a place where people from all over the world would be able to go for clean and safe fun.His dream came true on July 17, 1955, when the gates first opened at Disneyland in Anaheim, California.
Disneyland strives to generate the perfect fantasy.But magic does not simply happen.The place is a marvel of modern technology.Literally dozens of computers, huge banks of tape machines, film projectors, and electronic controls lie behind the walls, beneath the floors, and above the ceilings of dozens of rides and attractions.The philosophy is that "Disneyland is the world's biggest stage, and the audience is right here on the stage," said Dick Hollinger, chief industrial engineer at Disneyland."It takes a tremendous amount of work to keep the stage clean and working properly."
Cleanliness is a primary concern.Before the park opens at 8 a.m., the cleaning crew will have mopped, hosed, and dried every sidewalk, street, floor, and counter.More than 350 of the park's 7,400 employees come on duty at 1 a.m., to begin the daily cleanup routine.The thousands of feet that walk through the park each day and chewing gum do not mix; gum has always presented major cleanup problems.The park's janitors found long ago that fire hoses with 90 pounds of water pressure would not do the job.Now they use steam machines, razor scrapers, and mops towed by Cushman scooters to literally scour the streets and sidewalks daily.
It takes one person working a full eight-hour shift to polish the brass on the Fantasyland merry-go-round.The scrupulously manicured plantings throughout the park are treated with growth-retarding hormones to keep the trees and bushes from spreading beyond their assigned spaces and destroying the carefully maintained five-eighths scale modeling that is utilized in the park.The maintenance supervisor of the Matterhorn bobsled ride personally walks every foot of track and inspects every link of tow chain every night, thus trusting his or her own eyes more than the $2 million in safety equipment that is built into the ride.
Eisner himself pays obsessive attention to detail.Walking through Disneyland one Sunday afternoon, he peered at the plastic leaves on the Swiss Family Robinson tree house noting that they periodically wear out and need to be replaced leaf by leaf at a cost of $500,000.As his family strolled through the park, he and his eldest son Breck stooped to pick up the rare piece of litter that the cleanup crew had somehow missed.This old-fashioned dedication has paid off.Since opening day in 1955, Disneyland has been a consistent moneymaker.
Disney World in Orlando, Florida
By the time Eisner arrived, Disney World in Orlando was already on its way to becoming what it is today-the most popular vacation destination in the United States.But the company had neglected a rich niche in its business: hotels.Disney's three existing hotels, probably the most profitable in the United States, registered unheard-of occupancy rates of 92 percent to 96 percent versus 66 percent for the industry.Eisner promptly embarked on an ambitious $1 billion hotel expansion plan.Two major hotels, Disney's Grand Floridian Beach Resort and Disney's Caribbean Beach Resort, were opened during 1987-89.Disney's Yacht Club and Beach Resort along with the Dolphin and Swan Hotels, owned and operated by Tishman Realty Construction, Metropolitan Life Insurance, and Aoki Corporation opened during 1989-90.Adding 3,400 hotel rooms and 250,000 square feet of convention space made it the largest convention center east of the Mississippi.
In October 1982, Disney made a new addition to the theme park-the Experimental Prototype Community of Tomorrow, or EPCOT Center.E.Cardon Walker, then president of the company, announced that EPCOT would be a "permanent showcase, industrial park, and experimental housing center." This new park consists of two large complexes: Future World, a series of pavilions designed to show the technological advances of the next 25 years, and World Showcase, a collection of foreign "villages."
Tokyo Disneyland
It was Tokyo's nastiest winter day in four years.Arctic winds and 8 inches of snow lashed the city.Roads were clogged and trains slowed down.But the bad weather didn't keep 13,200 hardy souls from Tokyo Disneyland.Mikki Mausu, better known outside Japan as Mickey Mouse, had taken the country by storm.
Located on a fringe of reclaimed shoreline in Urayasu City on the outskirts of Tokyo, the park opened to the public on April 15, 1983.In less than one year, over 10 million people had passed through its gates, an attendance figure that has been bettered every single year.On August 13, 1983, 93,000 people helped set a one-day attendance record that easily eclipsed the old records established at the two parent U.S.parks.Four years later, records again toppled as the turnstiles clicked.The total this time: 111,500.By 1988, approximately 50 million people, or nearly half of Japan's population, had visited Tokyo Disneyland since its opening.The steady cash flow pushed revenues for fiscal year 1989 to $768 million, up 17 percent from 1988.
The 204-acre Tokyo Disneyland is owned and operated by Oriental Land under license from the Walt Disney Co.The 45-year contract gives Disney 10 percent of admissions and 5 percent of food and merchandise sales, plus licensing fees.Disney opted to take no equity in the project and put no money down for construction."I never had the slightest doubt about the success of Disneyland in Japan," said Masatomo Takahashi, president of Oriental Land Company.Oriental Land was so confident of the success of Disney in Japan that it financed the park entirely with debt, borrowing ¥180 billion ($1.5 billion at February 1988 exchange rates).Takahashi added, "The debt means nothing to me," and with good reason.According to Fusahao Awata, who co-authored a book on Tokyo Disneyland: "The Japanese yearn for [American culture]."
Soon after Tokyo Disneyland opened in April 1983, five Shinto priests held a solemn dedication ceremony near Cinderella's castle.It is the only overtly Japanese ritual seen so far in this sprawling theme park.What visitors see is pure Americana.All signs are in English, with only small katakana (a phonetic Japanese alphabet) translations.Most of the food is American style, and the attractions are cloned from Disney's U.S.parks.Disney also held firm on two fundamentals that strike the Japanese as strange-no alcohol is allowed and no food may be brought in from outside the park.
Exhibit 1 How the Theme Parks Grew
Stephen Koepp, "Do You Believe in Magic?" Time, April 25, 1988, pp.66-73.
However, in Disney's enthusiasm to make Tokyo a brick-by-brick copy of Anaheim's Magic Kingdom, there were a few glitches.On opening day, the Tokyo park discovered that almost 100 public telephones were placed too high for Japanese guests to reach them comfortably.And many hungry customers found countertops above their reach at the park's snack stands.
"Everything we imported that worked in the United States works here," said Ronald D.Pogue, managing director of Walt Disney Attractions Japan Ltd."American things like McDonald's hamburgers and Kentucky Fried Chicken are popular here with young people.We also wanted visitors from Japan and Southeast Asia to feel they were getting the real thing," said Toshiharu Akiba, a staff member of the Oriental Land publicity department.
Still, local sensibilities dictated a few changes.A Japanese restaurant was added to please older patrons.The Nautilus submarine is missing.More areas are covered to protect against rain and snow.Lines for attractions had to be redesigned so that people walking through the park did not cross in front of patrons waiting to ride an attraction."It's very discourteous in Japan to have people cross in front of somebody else," explained James B.Cora, managing director of operations for the Tokyo project.The biggest differences between Japan and America have come in slogans and ad copy.Although English is often used, it's "Japanized" English-the sort that would have native speakers shaking their heads while the Japanese nod happily in recognition."Let's Spring" was the motto for one of their highly successful ad campaigns.
Pogue, visiting frequently from his base in California, supervised seven resident American Disney managers who work side by side with Japanese counterparts from Oriental Land Co.to keep the park in tune with the Disney doctrine.American it may be, but Tokyo Disneyland appeals to such deep-seated Japanese passions as cleanliness, order, outstanding service, and technological wizardry.Japanese executives are impressed by Disney's detailed training manuals, which teach employees how to make visitors feel like VIPs.Most worth emulating, say the Japanese, is Disney's ability to make even the lowliest job seem glamorous."They have changed the image of dirty work," said Hakuhodo Institute's Sekizawa.
Disney Company did encounter a few unique cultural problems when developing Tokyo Disneyland:
The problem: how to dispose of some 250 tons of trash that would be generated weekly by Tokyo Disneyland visitors?
The standard Disney solution: trash compactors.
The Japanese proposal: pigs to eat the trash and be slaughtered and sold at a profit.
Exhibit 2 Investor's Snapshot: The Walt Disney Company (December 1989)
Source: Fortune, December 4, 1989.
James B.Cora and his team of some 150 operations experts did a little calculating and pointed out that it would take 100,000 pigs to do the job.And then there would be the smell …
The Japanese relented.
The Japanese were also uneasy about a rustic-looking Westernland, Tokyo's version of Frontierland."The Japanese like everything fresh and new when they put it in," said Cora."They kept painting the wood and we kept saying, 'No, it's got to look old.'" Finally the Disney crew took the Japanese to Anaheim to give them a firsthand look at the Old West.
Tokyo Disneyland opened just as the yen escalated in value against the dollar, and the income level of the Japanese registered a phenomenal improvement.During this era of affluence, Tokyo Disneyland triggered an interest in leisure.Its great success spurred the construction of "leisurelands" throughout the country.This created an increase in the Japanese people's orientation toward leisure.But demographics are the real key to Tokyo Disneyland's success.Thirty million Japanese live within 30 miles of the park.There are three times more than the number of people in the same proximity to Anaheim's Disneyland.With the park proven such an unqualified hit, and nearing capacity, Oriental Land and Disney mapped out plans for a version of the Disney-MGM studio tour next door.This time, Disney talked about taking a 50 percent stake in the project.
Building Euro Disneyland
On March 24, 1987, Michael Eisner and Jacques Chirac, the French prime minister, signed a contract for the building of a Disney theme park at Marne-la-Vallee.Talks between Disney and the French government had dragged on for more than a year.At the signing, Robert Fitzpatrick, fluent in French, married to the former Sylvie Blondet, and the recipient of two awards from the French government, was introduced as the president of Euro Disneyland.He was expected to be a key player in wooing support from the French establishment for the theme park.As one analyst put it, Disney selected him to set up the park because he is "more French than the French."
Disney had been courted extensively by Spain and France.The prime ministers of both countries ordered their governments to lend Disney a hand in its quest for a site.France set up a five-person team headed by Special Advisor to Foreign Trade and Tourism Minister Edith Cresson, and Spain's negotiators included Ignacio Vasallo, Director-General for the Promotion of Tourism.Disney pummeled both governments with requests for detailed information."The only thing they haven't asked us for is the color of the tourists' eyes," moaned Vasallo.
The governments tried other enticements too.Spain offered tax and labor incentives and possibly as much as 20,000 acres of land.The French package, although less generous, included spending of $53 million to improve highway access to the proposed site and perhaps speeding up a $75 million subway project.For a long time, all that smiling Disney officials would say was that Spain had better weather while France had a better population base.
Officials explained that they picked France over Spain because Marne-la-Vallee is advantageously close to one of the world's tourism capitals, while also being situated within a day's drive or train ride of some 30 million people in France, Belgium, England, and Germany.Another advantage mentioned was the availability of good transportation.A train line that serves as part of the Paris Metro subway system ran to Torcy, in the center of Marne-la-Vallee, and the French government promised to extend the line to the actual site of the park.The park would also be served by A-4, a modern highway that runs from Paris to the German border, as well as a freeway that runs to Charles de Gaulle airport.
Once a letter of intent had been signed, sensing that the French government was keen to not let the plan fail, Disney held out for one concession after another.For example, Disney negotiated for VAT (value-added tax) on ticket sales to be cut from a normal 18.6 percent to 7 percent.A quarter of the investment in building the park would come from subsidized loans.Additionally, any disputes arising from the contract would be settled not in French courts but by a special international panel of arbitrators.But Disney did have to agree to a clause in the contract which would require it to respect and utilize French culture in its themes.
The park was built on 4,460 acres of farmland in Marne-la-Vallee, a rural corner of France 20 miles east of Paris known mostly for sugar beets and Brie cheese.Opening was planned for early 1992, and planners hoped to attract some 10 million visitors a year.Approximately $2.5 billion was needed to build the park, making it the largest single foreign investment ever in France.A French "pivot" company was formed to build the park with starting capital of FFr 3 billion, split 60 percent French and 40 percent foreign, with Disney taking 16.67 percent.Euro Disneyland was expected to bring $600 million in foreign investment into France each year.
As soon as the contract had been signed, individuals and businesses began scurrying to somehow plug into the Mickey Mouse money machine-all were hoping to benefit from the American dream without leaving France.In fact, one Paris daily, Liberation, actually sprouted mouse ears over its front-page flag.
The $1.5 to $2 billion first phase investment would involve an amusement complex including hotels and restaurants, golf courses, and an aquatic park in addition to a European version of the Magic Kingdom.The second phase, scheduled to start after the gates opened in 1992, called for the construction of a community around the park, including a sports complex, technology park, conference center, theater, shopping mall, university campus, villas, and condominiums.No price tag had been put on the second phase, although it was expected to rival, if not surpass, the first phase investment.In November 1989, Fitzpatrick announced that the Disney-MGM Studios, Europe, would also open at Euro Disneyland in 1996, resembling the enormously successful Disney-MGM Studios theme park at Disney World in Orlando.The new studios would greatly enhance the Walt Disney Company's strategy of increasing its production of live action and animated filmed entertainment in Europe for both the European and world markets.
"The phone's been ringing here ever since the announcement," said Marc Berthod of EpaMarne, the government body that oversees the Marne-la-Vallee region."We've gotten calls from big companies as well as small-everything from hotel chains to language interpreters all asking for details on Euro Disneyland.And the individual mayors of the villages around here have been swamped with calls from people looking for jobs," he added.
Euro Disneyland was expected to generate up to 28,000 jobs, providing a measure of relief for an area that had suffered a 10 percent-plus unemployment rate for the previous year.It was also expected to light a fire under France's construction industry, which had been particularly hard hit by France's economic problems over the previous year.Moreover, Euro Disneyland was expected to attract many other investors to the depressed outskirts of Paris.International Business Machines (IBM) and Banque National de Paris were among those already building in the area.In addition one of the new buildings going up was a factory that would employ 400 outside workers to wash the 50 tons of laundry expected to be generated per day by Euro Disneyland's 14,000 employees.
The impact of Euro Disneyland was also felt in the real estate market."Everyone who owns land around here is holding on to it for the time being, at least until they know what's going to happen," said Danny Theveno, a spokesman for the town of Villiers on the western edge of Marne-la-Vallee.Disney expected 11 million visitors in the first year.The break-even point was estimated to be between 7 and 8 million.One worry was that Euro Disneyland would cannibalize the flow of European visitors to Walt Disney World in Florida, but European travel agents said that their customers were still eagerly signing up for Florida, lured by the cheap dollar and the promise of sunshine.
Protests of Cultural Imperialism
Disney faced French communists and intellectuals who protested the building of Euro Disneyland.Ariane Mnouchkine, a theater director, described it as a "cultural Chernobyl." "I wish with all my heart that the rebels would set fire to Disneyland," thundered a French intellectual in the newspaper La Figaro."Mickey Mouse," sniffed another, "is stifling individualism and transforming children into consumers." The theme park was damned as an example of American "neoprovincialism."
Farmers in the Marne-la-Vallee region posted protest signs along the roadside featuring a mean looking Mickey Mouse and touting sentiments such as "Disney go home," "Stop the massacre," and "Don't gnaw away our national wealth." Farmers were upset partly because under the terms of the contract, the French government would expropriate the necessary land and sell it without profit to the Euro Disneyland development company.
While local officials were sympathetic to the farmers' position, they were unwilling to let their predicament interfere with what some called "the deal of the century." "For many years these farmers have had the fortune to cultivate what is considered some of the richest land in France," said Berthod."Now they'll have to find another occupation."
Also less than enchanted about the prospect of a magic kingdom rising among its midst was the communist-dominated labor federation, the Confédération Générale du Travail (CGT).Despite the job-creating potential of Euro Disney, the CGT doubted its members would benefit.The union had been fighting hard to stop the passage of a bill which would give managers the right to establish flexible hours for their workers.Flexible hours were believed to be a prerequisite to the profitable operation of Euro Disneyland, especially considering seasonal variations.
However, Disney proved to be relatively immune to the anti-U.S.virus.In early 1985, one of the three state-owned television networks signed a contract to broadcast two hours of dubbed Disney programming every Saturday evening.Soon after, Disney Channel became one of the top-rated programs in France.
In 1987, the company launched an aggressive community relations program to calm the fears of politicians, farmers, villagers, and even bankers that the project would bring traffic congestion, noise, pollution, and other problems to their countryside.Such a public relations program was a rarity in France, where businesses make little effort to establish good relations with local residents.Disney invited 400 local children to a birthday party for Mickey Mouse, sent Mickey to area hospitals, and hosted free trips to Disney World in Florida for dozens of local officials and children.
"They're experts at seduction, and they don't hide the fact that they're trying to seduce you," said Vincent Guardiola, an official with Banque Indosuez, one of the 17 banks wined and dined at Orlando and subsequently one of the venture's financial participants."The French aren't used to this kind of public relations-it was unbelievable." Observers said that the goodwill efforts helped dissipate initial objections to the project.
Financial Structuring at Euro Disneyland
Eisner was so keen on Euro Disneyland that Disney kept a 49 percent stake in the project, while the remaining 51 percent of stock was distributed through the London, Paris, and Brussels stock exchanges.Half the stock under the offer was going to the French, 25 percent to the English, and the remainder distributed in the rest of the European community.The initial offer price of FFr 72 was considerably higher than the pathfinder prospectus estimate because the capacity of the park had been slightly extended.Scarcity of stock was likely to push up the price, which was expected to reach FFr 166 by opening day in 1992.This would give a compound return of 21 percent.
Exhibit 3 Chronology of the Euro Disneyland Deal
Source: Geraldine E.Willigan, "The Value-Adding CFO: An Interview with Disney's Gary Wilson," Harvard Business Review, January-February 1990, pp.85-93.
Walt Disney Company maintained management control of the company.The U.S.company put up $160 million of its own capital to fund the project, an investment which soared in value to $2.4 billion after the popular stock offering in Europe.French national and local authorities, by comparison, were providing about $800 million in low-interest loans and poured at least that much again into infrastructure.
Other sources of funding were the park's 12 corporate sponsors, and Disney would pay them back in kind.The "autopolis" ride, where kids ride cars, features coupes emblazoned with the "Hot Wheels" logo.Mattel Inc., sponsor of the ride, was grateful for the boost to one of its biggest toy lines.
The real payoff would begin once the park opened.The Walt Disney Company would receive 10 percent of admission fees and 5 percent of food and merchandise revenue, the same arrangement as in Japan.But in France, it would also receive management fees, incentive fees, and 49 percent of the profits.
A Saloman Brothers analyst estimated that the park would pull in 3 to 4 million more visitors than the 11 million the company expected in the first year.Other Wall Street analyst
On January 18, 1993, Euro Disneyland chairperson Robert Fitzpatrick announced he would leave that post on April 12 to begin his own consulting company.Quitting his position exactly one year after the grand opening of Euro Disneyland, Fitzpatrick with his resignation removed U.S.management from the helm of the French theme park and resort.
Fitzpatrick's position was taken by a Frenchman, Philippe Bourguignon, who had been Euro Disneyland's senior vice president for real estate.Bourguignon, 45 years old, faced a net loss of FFr 188 million for Euro Disneyland's fiscal year, which ended September 1992.Also, between April and September 1992, only 29 percent of the park's total visitors were French.Expectations were that closer to half of all visitors would be French.
It was hoped that the promotion of Philippe Bourguignon would have a public relations benefit for Euro Disneyland-a project that had been a publicist's nightmare from the beginning.One of the low points was at a news conference prior to the park's opening when protesters pelted Michael Eisner, CEO of the Walt Disney Company, with rotten eggs.Within the first year of operation, Disney had to compromise its "squeaky clean" image and lift the alcohol ban at the park.Wine is now served at all major restaurants.
Euro Disneyland, 49 percent owned by Walt Disney Company, Burbank, California, originally forecasted 11 million visitors in the first year of operation.In January 1993 it appeared attendance would be closer to 10 million.In response, management temporarily slashed prices at the park for local residents to FFr 150 ($27.27) from FFr 225 ($40.91) for adults and to FFr 100 from FFr 150 for children in order to lure more French during the slow, wet winter months.The company also reduced prices at its restaurants and hotels, which registered occupancy rates of just 37 percent.
Bourguignon also faced other problems, such as the second phase of development at Euro Disneyland, which was expected to start in September 1993.It was unclear how the company planned to finance its FFr 8-10 billion cost.The company had steadily drained its cash reserves (FFr 1.9 billion in May 1993) while piling up debt (FFr 21 billion in May 1993).Euro Disneyland admitted that it and the Walt Disney Company were "exploring potential sources of financing for Euro Disneyland." The company was also talking to banks about restructuring its debts.
Despite the frustrations, Eisner was tirelessly upbeat about the project."Instant hits are things that go away quickly, and things that grow slowly and are part of the culture are what we look for," he said."What we created in France is the biggest private investment in a foreign country by an American company ever.And it's gonna pay off."
In the Beginning
Disney's story is the classic American rags-to-riches story, which started in a small Kansas City advertising office where Mickey was a real mouse prowling the unknown Walt Disney floor.Originally, Mickey was named Mortimer, until a dissenting Mrs.Disney stepped in.How close Mickey was to Walt Disney is evidenced by the fact that when filming, Disney himself dubbed the mouse's voice.Only in later films did Mickey get a different voice.Disney made many sacrifices to promote his hero-mascot, including selling his first car, a beloved Moon Cabriolet, and humiliating himself in front of Louis B.Mayer."Get that mouse off the screen!" was the movie mogul's reported response to the cartoon character.Then, in 1955, Disney had the brainstorm of sending his movie characters out into the "real" world to mix with their fans, and he battled skeptics to build the very first Disneyland in Anaheim, California.
When Disney died in 1966, the company went into virtual suspended animation.Its last big hit of that era was 1969's The Love Bug, about a Volkswagen named Herbie.Today, Disney executives trace the problem to a tyrannical CEO named E.Cardon Walker, who ruled the company from 1976 to 1983, and to his successor, Ronald W.Miller.Walker was quick to ridicule underlings in public and impervious to any point of view but his own.He made decisions according to what he thought Walt would have done.Executives clinched arguments by quoting Walt like the Scriptures or Marx, and the company eventually supplied a little book of the founder's sayings.Making the wholesome family movies Walt would have wanted formed a key article of Walker's creed.For example, a poster advertising the unremarkable Condorman featured actress Barbara Carrera in a slit skirt.Walker had the slit painted over.With this as the context, studio producers ground out a thin stream of tired, formulaic movies that fewer and fewer customers would pay to see.In mid-1983, a similar low-horsepower approach to television production led to CBS's cancellation of the hour-long program Walt Disney, leaving the company without a regular network show for the first time in 29 years.Like a reclusive hermit, the company lost touch with the contemporary world.
Ron Miller's brief reign was by contrast a model of decentralization and delegation.Many attributed Miller's ascent to his marrying the boss's daughter rather than to any special gift.To shore Miller up, the board installed Raymond L.Watson, former head of the Irvine Co., as part-time chairperson.He quickly became full time.
Miller sensed the studio needed rejuvenation, and he managed to produce the hit film Splash, featuring an apparently (but not actually) bare-breasted mermaid, under the newly devised Touchstone label.However, the reluctance of freelance Hollywood talent to accommodate Disney's narrow range and stingy compensation often kept his sound instincts from bearing fruit."Card [Cardon Walker] would listen but not hear," said a former executive."Ron [Ron Miller] would listen but not act."
Too many box office bombs contributed to a steady erosion of profit.Profits of $135 million on revenues of $915 million in 1980 dwindled to $93 million on revenues of $1.3 billion in 1983.More alarmingly, revenues from the company's theme parks, about three-quarters of the company's total revenues, were showing signs of leveling off.Disney's stock slid from $84.375 a share to $48.75 between April 1983 and February 1984.
Through these years, Roy Disney Jr.simmered while he watched the downfall of the national institution that his uncle, Walt, and his father, Roy Disney Sr., had built.He had long argued that the company's constituent parts all worked together to enhance each other.If movie and television production weren't revitalized, not only would that source of revenue disappear but the company and its activities would also grow dim in the public eye.At the same time the stream of new ideas and characters that kept people pouring into the parks and buying toys, books, and records would dry up.Now his dire predictions were coming true.His own personal shareholding had already dropped from $96 million to $54 million.Walker's treatment of Ron Miller as the shining heir apparent and Roy Disney as the idiot nephew helped drive Roy to quit as Disney vice president in 1977 and to set up Shamrock Holdings, a broadcasting and investment company.
In 1984, Roy teamed up with Stanley Gold, a tough-talking lawyer and a brilliant strategist.Gold saw that the falling stock price was bound to flush out a raider and afford Roy Disney a chance to restore the company's fortunes.They asked Frank Wells, vice chairperson of Warner Bros., if he would take a top job in the company in the event they offered it.Wells, a lawyer and a Rhodes scholar, said yes.With that, Roy knew that what he would hear in Disney's boardroom would limit his freedom to trade in its stock, so he quit the board on March 9, 1984."I knew that would hang a 'For Sale' sign over the company," said Gold.
By resigning, Roy pushed over the first of a train of dominoes that ultimately led to the result he most desired.The company was raided, almost dismantled, greenmailed, raided again, and sued left and right.But it miraculously emerged with a skilled new top management with big plans for a bright future.Roy Disney proposed Michael Eisner as the CEO, but the board came close to rejecting Eisner in favor of an older, more buttoned-down candidate.Gold stepped in and made an impassioned speech to the directors."You see guys like Eisner as a little crazy...but every studio in this country has been run by crazies.What do you think Walt Disney was? The guy was off the goddamned wall.This is a creative institution.It needs to be run by crazies again."
Meanwhile Eisner and Wells staged an all-out lobbying campaign, calling on every board member except two, who were abroad, to explain their views about the company's future."What was most important," said Eisner, "was that they saw I did not come in a tutu, and that I was a serious person, and I understood a P L, and I knew the investment analysts, and I read Fortune."
In September 1984, Michael Eisner was appointed CEO and Frank Wells became president.Jeffrey Katzenberg, the 33-year-old, maniacal production chief, followed Fisher from Paramount Pictures.He took over Disney's movie and television studios."The key," said Eisner, "is to start off with a great idea."
Disneyland in Anaheim, California
For a long time, Walt Disney had been concerned about the lack of family-type entertainment available for his two daughters.The amusement parks he saw around him were mostly filthy traveling carnivals.They were often unsafe and allowed unruly conduct on the premises.Disney envisioned a place where people from all over the world would be able to go for clean and safe fun.His dream came true on July 17, 1955, when the gates first opened at Disneyland in Anaheim, California.
Disneyland strives to generate the perfect fantasy.But magic does not simply happen.The place is a marvel of modern technology.Literally dozens of computers, huge banks of tape machines, film projectors, and electronic controls lie behind the walls, beneath the floors, and above the ceilings of dozens of rides and attractions.The philosophy is that "Disneyland is the world's biggest stage, and the audience is right here on the stage," said Dick Hollinger, chief industrial engineer at Disneyland."It takes a tremendous amount of work to keep the stage clean and working properly."
Cleanliness is a primary concern.Before the park opens at 8 a.m., the cleaning crew will have mopped, hosed, and dried every sidewalk, street, floor, and counter.More than 350 of the park's 7,400 employees come on duty at 1 a.m., to begin the daily cleanup routine.The thousands of feet that walk through the park each day and chewing gum do not mix; gum has always presented major cleanup problems.The park's janitors found long ago that fire hoses with 90 pounds of water pressure would not do the job.Now they use steam machines, razor scrapers, and mops towed by Cushman scooters to literally scour the streets and sidewalks daily.
It takes one person working a full eight-hour shift to polish the brass on the Fantasyland merry-go-round.The scrupulously manicured plantings throughout the park are treated with growth-retarding hormones to keep the trees and bushes from spreading beyond their assigned spaces and destroying the carefully maintained five-eighths scale modeling that is utilized in the park.The maintenance supervisor of the Matterhorn bobsled ride personally walks every foot of track and inspects every link of tow chain every night, thus trusting his or her own eyes more than the $2 million in safety equipment that is built into the ride.
Eisner himself pays obsessive attention to detail.Walking through Disneyland one Sunday afternoon, he peered at the plastic leaves on the Swiss Family Robinson tree house noting that they periodically wear out and need to be replaced leaf by leaf at a cost of $500,000.As his family strolled through the park, he and his eldest son Breck stooped to pick up the rare piece of litter that the cleanup crew had somehow missed.This old-fashioned dedication has paid off.Since opening day in 1955, Disneyland has been a consistent moneymaker.
Disney World in Orlando, Florida
By the time Eisner arrived, Disney World in Orlando was already on its way to becoming what it is today-the most popular vacation destination in the United States.But the company had neglected a rich niche in its business: hotels.Disney's three existing hotels, probably the most profitable in the United States, registered unheard-of occupancy rates of 92 percent to 96 percent versus 66 percent for the industry.Eisner promptly embarked on an ambitious $1 billion hotel expansion plan.Two major hotels, Disney's Grand Floridian Beach Resort and Disney's Caribbean Beach Resort, were opened during 1987-89.Disney's Yacht Club and Beach Resort along with the Dolphin and Swan Hotels, owned and operated by Tishman Realty Construction, Metropolitan Life Insurance, and Aoki Corporation opened during 1989-90.Adding 3,400 hotel rooms and 250,000 square feet of convention space made it the largest convention center east of the Mississippi.
In October 1982, Disney made a new addition to the theme park-the Experimental Prototype Community of Tomorrow, or EPCOT Center.E.Cardon Walker, then president of the company, announced that EPCOT would be a "permanent showcase, industrial park, and experimental housing center." This new park consists of two large complexes: Future World, a series of pavilions designed to show the technological advances of the next 25 years, and World Showcase, a collection of foreign "villages."
Tokyo Disneyland
It was Tokyo's nastiest winter day in four years.Arctic winds and 8 inches of snow lashed the city.Roads were clogged and trains slowed down.But the bad weather didn't keep 13,200 hardy souls from Tokyo Disneyland.Mikki Mausu, better known outside Japan as Mickey Mouse, had taken the country by storm.
Located on a fringe of reclaimed shoreline in Urayasu City on the outskirts of Tokyo, the park opened to the public on April 15, 1983.In less than one year, over 10 million people had passed through its gates, an attendance figure that has been bettered every single year.On August 13, 1983, 93,000 people helped set a one-day attendance record that easily eclipsed the old records established at the two parent U.S.parks.Four years later, records again toppled as the turnstiles clicked.The total this time: 111,500.By 1988, approximately 50 million people, or nearly half of Japan's population, had visited Tokyo Disneyland since its opening.The steady cash flow pushed revenues for fiscal year 1989 to $768 million, up 17 percent from 1988.
The 204-acre Tokyo Disneyland is owned and operated by Oriental Land under license from the Walt Disney Co.The 45-year contract gives Disney 10 percent of admissions and 5 percent of food and merchandise sales, plus licensing fees.Disney opted to take no equity in the project and put no money down for construction."I never had the slightest doubt about the success of Disneyland in Japan," said Masatomo Takahashi, president of Oriental Land Company.Oriental Land was so confident of the success of Disney in Japan that it financed the park entirely with debt, borrowing ¥180 billion ($1.5 billion at February 1988 exchange rates).Takahashi added, "The debt means nothing to me," and with good reason.According to Fusahao Awata, who co-authored a book on Tokyo Disneyland: "The Japanese yearn for [American culture]."
Soon after Tokyo Disneyland opened in April 1983, five Shinto priests held a solemn dedication ceremony near Cinderella's castle.It is the only overtly Japanese ritual seen so far in this sprawling theme park.What visitors see is pure Americana.All signs are in English, with only small katakana (a phonetic Japanese alphabet) translations.Most of the food is American style, and the attractions are cloned from Disney's U.S.parks.Disney also held firm on two fundamentals that strike the Japanese as strange-no alcohol is allowed and no food may be brought in from outside the park.
Exhibit 1 How the Theme Parks Grew
Stephen Koepp, "Do You Believe in Magic?" Time, April 25, 1988, pp.66-73.
However, in Disney's enthusiasm to make Tokyo a brick-by-brick copy of Anaheim's Magic Kingdom, there were a few glitches.On opening day, the Tokyo park discovered that almost 100 public telephones were placed too high for Japanese guests to reach them comfortably.And many hungry customers found countertops above their reach at the park's snack stands.
"Everything we imported that worked in the United States works here," said Ronald D.Pogue, managing director of Walt Disney Attractions Japan Ltd."American things like McDonald's hamburgers and Kentucky Fried Chicken are popular here with young people.We also wanted visitors from Japan and Southeast Asia to feel they were getting the real thing," said Toshiharu Akiba, a staff member of the Oriental Land publicity department.
Still, local sensibilities dictated a few changes.A Japanese restaurant was added to please older patrons.The Nautilus submarine is missing.More areas are covered to protect against rain and snow.Lines for attractions had to be redesigned so that people walking through the park did not cross in front of patrons waiting to ride an attraction."It's very discourteous in Japan to have people cross in front of somebody else," explained James B.Cora, managing director of operations for the Tokyo project.The biggest differences between Japan and America have come in slogans and ad copy.Although English is often used, it's "Japanized" English-the sort that would have native speakers shaking their heads while the Japanese nod happily in recognition."Let's Spring" was the motto for one of their highly successful ad campaigns.
Pogue, visiting frequently from his base in California, supervised seven resident American Disney managers who work side by side with Japanese counterparts from Oriental Land Co.to keep the park in tune with the Disney doctrine.American it may be, but Tokyo Disneyland appeals to such deep-seated Japanese passions as cleanliness, order, outstanding service, and technological wizardry.Japanese executives are impressed by Disney's detailed training manuals, which teach employees how to make visitors feel like VIPs.Most worth emulating, say the Japanese, is Disney's ability to make even the lowliest job seem glamorous."They have changed the image of dirty work," said Hakuhodo Institute's Sekizawa.
Disney Company did encounter a few unique cultural problems when developing Tokyo Disneyland:
The problem: how to dispose of some 250 tons of trash that would be generated weekly by Tokyo Disneyland visitors?
The standard Disney solution: trash compactors.
The Japanese proposal: pigs to eat the trash and be slaughtered and sold at a profit.
Exhibit 2 Investor's Snapshot: The Walt Disney Company (December 1989)
Source: Fortune, December 4, 1989.
James B.Cora and his team of some 150 operations experts did a little calculating and pointed out that it would take 100,000 pigs to do the job.And then there would be the smell …
The Japanese relented.
The Japanese were also uneasy about a rustic-looking Westernland, Tokyo's version of Frontierland."The Japanese like everything fresh and new when they put it in," said Cora."They kept painting the wood and we kept saying, 'No, it's got to look old.'" Finally the Disney crew took the Japanese to Anaheim to give them a firsthand look at the Old West.
Tokyo Disneyland opened just as the yen escalated in value against the dollar, and the income level of the Japanese registered a phenomenal improvement.During this era of affluence, Tokyo Disneyland triggered an interest in leisure.Its great success spurred the construction of "leisurelands" throughout the country.This created an increase in the Japanese people's orientation toward leisure.But demographics are the real key to Tokyo Disneyland's success.Thirty million Japanese live within 30 miles of the park.There are three times more than the number of people in the same proximity to Anaheim's Disneyland.With the park proven such an unqualified hit, and nearing capacity, Oriental Land and Disney mapped out plans for a version of the Disney-MGM studio tour next door.This time, Disney talked about taking a 50 percent stake in the project.
Building Euro Disneyland
On March 24, 1987, Michael Eisner and Jacques Chirac, the French prime minister, signed a contract for the building of a Disney theme park at Marne-la-Vallee.Talks between Disney and the French government had dragged on for more than a year.At the signing, Robert Fitzpatrick, fluent in French, married to the former Sylvie Blondet, and the recipient of two awards from the French government, was introduced as the president of Euro Disneyland.He was expected to be a key player in wooing support from the French establishment for the theme park.As one analyst put it, Disney selected him to set up the park because he is "more French than the French."
Disney had been courted extensively by Spain and France.The prime ministers of both countries ordered their governments to lend Disney a hand in its quest for a site.France set up a five-person team headed by Special Advisor to Foreign Trade and Tourism Minister Edith Cresson, and Spain's negotiators included Ignacio Vasallo, Director-General for the Promotion of Tourism.Disney pummeled both governments with requests for detailed information."The only thing they haven't asked us for is the color of the tourists' eyes," moaned Vasallo.
The governments tried other enticements too.Spain offered tax and labor incentives and possibly as much as 20,000 acres of land.The French package, although less generous, included spending of $53 million to improve highway access to the proposed site and perhaps speeding up a $75 million subway project.For a long time, all that smiling Disney officials would say was that Spain had better weather while France had a better population base.
Officials explained that they picked France over Spain because Marne-la-Vallee is advantageously close to one of the world's tourism capitals, while also being situated within a day's drive or train ride of some 30 million people in France, Belgium, England, and Germany.Another advantage mentioned was the availability of good transportation.A train line that serves as part of the Paris Metro subway system ran to Torcy, in the center of Marne-la-Vallee, and the French government promised to extend the line to the actual site of the park.The park would also be served by A-4, a modern highway that runs from Paris to the German border, as well as a freeway that runs to Charles de Gaulle airport.
Once a letter of intent had been signed, sensing that the French government was keen to not let the plan fail, Disney held out for one concession after another.For example, Disney negotiated for VAT (value-added tax) on ticket sales to be cut from a normal 18.6 percent to 7 percent.A quarter of the investment in building the park would come from subsidized loans.Additionally, any disputes arising from the contract would be settled not in French courts but by a special international panel of arbitrators.But Disney did have to agree to a clause in the contract which would require it to respect and utilize French culture in its themes.
The park was built on 4,460 acres of farmland in Marne-la-Vallee, a rural corner of France 20 miles east of Paris known mostly for sugar beets and Brie cheese.Opening was planned for early 1992, and planners hoped to attract some 10 million visitors a year.Approximately $2.5 billion was needed to build the park, making it the largest single foreign investment ever in France.A French "pivot" company was formed to build the park with starting capital of FFr 3 billion, split 60 percent French and 40 percent foreign, with Disney taking 16.67 percent.Euro Disneyland was expected to bring $600 million in foreign investment into France each year.
As soon as the contract had been signed, individuals and businesses began scurrying to somehow plug into the Mickey Mouse money machine-all were hoping to benefit from the American dream without leaving France.In fact, one Paris daily, Liberation, actually sprouted mouse ears over its front-page flag.
The $1.5 to $2 billion first phase investment would involve an amusement complex including hotels and restaurants, golf courses, and an aquatic park in addition to a European version of the Magic Kingdom.The second phase, scheduled to start after the gates opened in 1992, called for the construction of a community around the park, including a sports complex, technology park, conference center, theater, shopping mall, university campus, villas, and condominiums.No price tag had been put on the second phase, although it was expected to rival, if not surpass, the first phase investment.In November 1989, Fitzpatrick announced that the Disney-MGM Studios, Europe, would also open at Euro Disneyland in 1996, resembling the enormously successful Disney-MGM Studios theme park at Disney World in Orlando.The new studios would greatly enhance the Walt Disney Company's strategy of increasing its production of live action and animated filmed entertainment in Europe for both the European and world markets.
"The phone's been ringing here ever since the announcement," said Marc Berthod of EpaMarne, the government body that oversees the Marne-la-Vallee region."We've gotten calls from big companies as well as small-everything from hotel chains to language interpreters all asking for details on Euro Disneyland.And the individual mayors of the villages around here have been swamped with calls from people looking for jobs," he added.
Euro Disneyland was expected to generate up to 28,000 jobs, providing a measure of relief for an area that had suffered a 10 percent-plus unemployment rate for the previous year.It was also expected to light a fire under France's construction industry, which had been particularly hard hit by France's economic problems over the previous year.Moreover, Euro Disneyland was expected to attract many other investors to the depressed outskirts of Paris.International Business Machines (IBM) and Banque National de Paris were among those already building in the area.In addition one of the new buildings going up was a factory that would employ 400 outside workers to wash the 50 tons of laundry expected to be generated per day by Euro Disneyland's 14,000 employees.
The impact of Euro Disneyland was also felt in the real estate market."Everyone who owns land around here is holding on to it for the time being, at least until they know what's going to happen," said Danny Theveno, a spokesman for the town of Villiers on the western edge of Marne-la-Vallee.Disney expected 11 million visitors in the first year.The break-even point was estimated to be between 7 and 8 million.One worry was that Euro Disneyland would cannibalize the flow of European visitors to Walt Disney World in Florida, but European travel agents said that their customers were still eagerly signing up for Florida, lured by the cheap dollar and the promise of sunshine.
Protests of Cultural Imperialism
Disney faced French communists and intellectuals who protested the building of Euro Disneyland.Ariane Mnouchkine, a theater director, described it as a "cultural Chernobyl." "I wish with all my heart that the rebels would set fire to Disneyland," thundered a French intellectual in the newspaper La Figaro."Mickey Mouse," sniffed another, "is stifling individualism and transforming children into consumers." The theme park was damned as an example of American "neoprovincialism."
Farmers in the Marne-la-Vallee region posted protest signs along the roadside featuring a mean looking Mickey Mouse and touting sentiments such as "Disney go home," "Stop the massacre," and "Don't gnaw away our national wealth." Farmers were upset partly because under the terms of the contract, the French government would expropriate the necessary land and sell it without profit to the Euro Disneyland development company.
While local officials were sympathetic to the farmers' position, they were unwilling to let their predicament interfere with what some called "the deal of the century." "For many years these farmers have had the fortune to cultivate what is considered some of the richest land in France," said Berthod."Now they'll have to find another occupation."
Also less than enchanted about the prospect of a magic kingdom rising among its midst was the communist-dominated labor federation, the Confédération Générale du Travail (CGT).Despite the job-creating potential of Euro Disney, the CGT doubted its members would benefit.The union had been fighting hard to stop the passage of a bill which would give managers the right to establish flexible hours for their workers.Flexible hours were believed to be a prerequisite to the profitable operation of Euro Disneyland, especially considering seasonal variations.
However, Disney proved to be relatively immune to the anti-U.S.virus.In early 1985, one of the three state-owned television networks signed a contract to broadcast two hours of dubbed Disney programming every Saturday evening.Soon after, Disney Channel became one of the top-rated programs in France.
In 1987, the company launched an aggressive community relations program to calm the fears of politicians, farmers, villagers, and even bankers that the project would bring traffic congestion, noise, pollution, and other problems to their countryside.Such a public relations program was a rarity in France, where businesses make little effort to establish good relations with local residents.Disney invited 400 local children to a birthday party for Mickey Mouse, sent Mickey to area hospitals, and hosted free trips to Disney World in Florida for dozens of local officials and children.
"They're experts at seduction, and they don't hide the fact that they're trying to seduce you," said Vincent Guardiola, an official with Banque Indosuez, one of the 17 banks wined and dined at Orlando and subsequently one of the venture's financial participants."The French aren't used to this kind of public relations-it was unbelievable." Observers said that the goodwill efforts helped dissipate initial objections to the project.
Financial Structuring at Euro Disneyland
Eisner was so keen on Euro Disneyland that Disney kept a 49 percent stake in the project, while the remaining 51 percent of stock was distributed through the London, Paris, and Brussels stock exchanges.Half the stock under the offer was going to the French, 25 percent to the English, and the remainder distributed in the rest of the European community.The initial offer price of FFr 72 was considerably higher than the pathfinder prospectus estimate because the capacity of the park had been slightly extended.Scarcity of stock was likely to push up the price, which was expected to reach FFr 166 by opening day in 1992.This would give a compound return of 21 percent.
Exhibit 3 Chronology of the Euro Disneyland Deal
Source: Geraldine E.Willigan, "The Value-Adding CFO: An Interview with Disney's Gary Wilson," Harvard Business Review, January-February 1990, pp.85-93.
Walt Disney Company maintained management control of the company.The U.S.company put up $160 million of its own capital to fund the project, an investment which soared in value to $2.4 billion after the popular stock offering in Europe.French national and local authorities, by comparison, were providing about $800 million in low-interest loans and poured at least that much again into infrastructure.
Other sources of funding were the park's 12 corporate sponsors, and Disney would pay them back in kind.The "autopolis" ride, where kids ride cars, features coupes emblazoned with the "Hot Wheels" logo.Mattel Inc., sponsor of the ride, was grateful for the boost to one of its biggest toy lines.
The real payoff would begin once the park opened.The Walt Disney Company would receive 10 percent of admission fees and 5 percent of food and merchandise revenue, the same arrangement as in Japan.But in France, it would also receive management fees, incentive fees, and 49 percent of the profits.
A Saloman Brothers analyst estimated that the park would pull in 3 to 4 million more visitors than the 11 million the company expected in the first year.Other Wall Street analyst
التوضيح
Hofstede's cultural dimensions is a netw...
International Management 8th Edition by Fred Luthans,Jonathan Doh
لماذا لم يعجبك هذا التمرين؟
أخرى 8 أحرف كحد أدنى و 255 حرفاً كحد أقصى
حرف 255