Deck 10: Facilities Planning and Design

Full screen (f)
exit full mode
Question
Since most people are right-handed, for maximum efficiency routing servers through the kitchen or customers through a cafeteria line should be in a counterclockwise direction.
Use Space or
up arrow
down arrow
to flip the card.
Question
Air conditioning systems accomplish which of the following;
1)air circulation
2)air cleaning
3)air cooling
4)heating
5)humidity control

A) 1,2, & 3
B) 3 only
C) 1,2,3, & 5
D) 1, 2,3,4, & 5
Question
After first preparing a prospectus, the next step in the planning procedure is to:

A) conduct a feasibility study
B) consider the desired architectural features
C) make a menu analysis
D) organize a planning team
Question
Light intensity is measured in

A) amps
B) foot candles
C) volts
D) watts
Question
The first step in design development is to:

A) determine space allowances
B) prepare blueprints
C) prepare a schematic design
D) select the equipment
Question
In planning a kitchen layout, it is most important to:

A) group large pieces of equipment together
B) provide a separate work area for each cook
C) provide for a smooth and orderly flow of work
D) separate receiving and storage areas
Question
A back-to-back arrangement of cooking equipment is an efficient arrangement when considering human engineering.
Question
Main traffic aisles in a kitchen need to be a minimum of:

A) 3 feet
B) 3.5 feet
C) 4 feet
D) 5 feet
Question
From the perspective of durability and cleanability, which of the following would be the best choice for a production facility's wall covering?

A) ceramic tile
B) fiberglass reinforced panels
C) stainless steel
D) wallboard painted with washable enamel
Question
Which of these work center designs discourages through traffic:

A) back-to-back parallel
B) square
C) straight line
D) U-shaped
Question
Which of the following pieces of equipment is the least energy efficient and generates the most heat into the kitchen?

A) convection ovens
B) pressure steam cabinets
C) open top ranges
D) tilting fry pans
Question
Fill in the remaining required flow lines to determine which of the following facility design concepts is best illustrated in this foodservice plan? Receiving
<strong>Fill in the remaining required flow lines to determine which of the following facility design concepts is best illustrated in this foodservice plan? Receiving  </strong> A) backtracking B) cross traffic C) functional flow D) straight-line flow <div style=padding-top: 35px>

A) backtracking
B) cross traffic
C) functional flow
D) straight-line flow
Question
The preferred flooring in most institutional kitchens today is:

A) vinyl tiles
B) linoleum
C) quarry tile
D) sheet vinyl
Question
On an architect's blueprints the material of which the walls are to be constructed is indicated by:

A) attached written documents
B) markings between the lines
C) the number of parallel lines drawn
D) the thickness of the lines
Question
Light intensity is measured in watts.
Question
Refrigeration works on the principle of removing heat from food.
Question
Match between columns
evaporator
pumps out heat laden gas
evaporator
receives compressed gas
evaporator
vaporizes the liquid
evaporator
absorbs heat from food
condenser
pumps out heat laden gas
condenser
receives compressed gas
condenser
vaporizes the liquid
condenser
absorbs heat from food
refrigerant
pumps out heat laden gas
refrigerant
receives compressed gas
refrigerant
vaporizes the liquid
refrigerant
absorbs heat from food
compressor
pumps out heat laden gas
compressor
receives compressed gas
compressor
vaporizes the liquid
compressor
absorbs heat from food
Question
Match between columns
Equipment Representative
Budget & required service
Equipment Representative
Satisfy building codes
Equipment Representative
Supply equipment templates
Equipment Representative
Recommend equipment
Equipment Representative
Overall management detail
Equipment Representative
Info on daily operations
Administrator or Owner
Budget & required service
Administrator or Owner
Satisfy building codes
Administrator or Owner
Supply equipment templates
Administrator or Owner
Recommend equipment
Administrator or Owner
Overall management detail
Administrator or Owner
Info on daily operations
Architect
Budget & required service
Architect
Satisfy building codes
Architect
Supply equipment templates
Architect
Recommend equipment
Architect
Overall management detail
Architect
Info on daily operations
Foodservice Supervisor
Budget & required service
Foodservice Supervisor
Satisfy building codes
Foodservice Supervisor
Supply equipment templates
Foodservice Supervisor
Recommend equipment
Foodservice Supervisor
Overall management detail
Foodservice Supervisor
Info on daily operations
Foodservice Design Consultant
Budget & required service
Foodservice Design Consultant
Satisfy building codes
Foodservice Design Consultant
Supply equipment templates
Foodservice Design Consultant
Recommend equipment
Foodservice Design Consultant
Overall management detail
Foodservice Design Consultant
Info on daily operations
Foodservice Manager
Budget & required service
Foodservice Manager
Satisfy building codes
Foodservice Manager
Supply equipment templates
Foodservice Manager
Recommend equipment
Foodservice Manager
Overall management detail
Foodservice Manager
Info on daily operations
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/18
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Facilities Planning and Design
1
Since most people are right-handed, for maximum efficiency routing servers through the kitchen or customers through a cafeteria line should be in a counterclockwise direction.
True
2
Air conditioning systems accomplish which of the following;
1)air circulation
2)air cleaning
3)air cooling
4)heating
5)humidity control

A) 1,2, & 3
B) 3 only
C) 1,2,3, & 5
D) 1, 2,3,4, & 5
D
3
After first preparing a prospectus, the next step in the planning procedure is to:

A) conduct a feasibility study
B) consider the desired architectural features
C) make a menu analysis
D) organize a planning team
D
4
Light intensity is measured in

A) amps
B) foot candles
C) volts
D) watts
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
5
The first step in design development is to:

A) determine space allowances
B) prepare blueprints
C) prepare a schematic design
D) select the equipment
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
6
In planning a kitchen layout, it is most important to:

A) group large pieces of equipment together
B) provide a separate work area for each cook
C) provide for a smooth and orderly flow of work
D) separate receiving and storage areas
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
7
A back-to-back arrangement of cooking equipment is an efficient arrangement when considering human engineering.
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
8
Main traffic aisles in a kitchen need to be a minimum of:

A) 3 feet
B) 3.5 feet
C) 4 feet
D) 5 feet
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
9
From the perspective of durability and cleanability, which of the following would be the best choice for a production facility's wall covering?

A) ceramic tile
B) fiberglass reinforced panels
C) stainless steel
D) wallboard painted with washable enamel
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
10
Which of these work center designs discourages through traffic:

A) back-to-back parallel
B) square
C) straight line
D) U-shaped
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following pieces of equipment is the least energy efficient and generates the most heat into the kitchen?

A) convection ovens
B) pressure steam cabinets
C) open top ranges
D) tilting fry pans
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
12
Fill in the remaining required flow lines to determine which of the following facility design concepts is best illustrated in this foodservice plan? Receiving
<strong>Fill in the remaining required flow lines to determine which of the following facility design concepts is best illustrated in this foodservice plan? Receiving  </strong> A) backtracking B) cross traffic C) functional flow D) straight-line flow

A) backtracking
B) cross traffic
C) functional flow
D) straight-line flow
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
13
The preferred flooring in most institutional kitchens today is:

A) vinyl tiles
B) linoleum
C) quarry tile
D) sheet vinyl
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
14
On an architect's blueprints the material of which the walls are to be constructed is indicated by:

A) attached written documents
B) markings between the lines
C) the number of parallel lines drawn
D) the thickness of the lines
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
15
Light intensity is measured in watts.
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
16
Refrigeration works on the principle of removing heat from food.
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
17
Match between columns
evaporator
pumps out heat laden gas
evaporator
receives compressed gas
evaporator
vaporizes the liquid
evaporator
absorbs heat from food
condenser
pumps out heat laden gas
condenser
receives compressed gas
condenser
vaporizes the liquid
condenser
absorbs heat from food
refrigerant
pumps out heat laden gas
refrigerant
receives compressed gas
refrigerant
vaporizes the liquid
refrigerant
absorbs heat from food
compressor
pumps out heat laden gas
compressor
receives compressed gas
compressor
vaporizes the liquid
compressor
absorbs heat from food
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
18
Match between columns
Equipment Representative
Budget & required service
Equipment Representative
Satisfy building codes
Equipment Representative
Supply equipment templates
Equipment Representative
Recommend equipment
Equipment Representative
Overall management detail
Equipment Representative
Info on daily operations
Administrator or Owner
Budget & required service
Administrator or Owner
Satisfy building codes
Administrator or Owner
Supply equipment templates
Administrator or Owner
Recommend equipment
Administrator or Owner
Overall management detail
Administrator or Owner
Info on daily operations
Architect
Budget & required service
Architect
Satisfy building codes
Architect
Supply equipment templates
Architect
Recommend equipment
Architect
Overall management detail
Architect
Info on daily operations
Foodservice Supervisor
Budget & required service
Foodservice Supervisor
Satisfy building codes
Foodservice Supervisor
Supply equipment templates
Foodservice Supervisor
Recommend equipment
Foodservice Supervisor
Overall management detail
Foodservice Supervisor
Info on daily operations
Foodservice Design Consultant
Budget & required service
Foodservice Design Consultant
Satisfy building codes
Foodservice Design Consultant
Supply equipment templates
Foodservice Design Consultant
Recommend equipment
Foodservice Design Consultant
Overall management detail
Foodservice Design Consultant
Info on daily operations
Foodservice Manager
Budget & required service
Foodservice Manager
Satisfy building codes
Foodservice Manager
Supply equipment templates
Foodservice Manager
Recommend equipment
Foodservice Manager
Overall management detail
Foodservice Manager
Info on daily operations
Unlock Deck
Unlock for access to all 18 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 18 flashcards in this deck.