Deck 7: Moving Into Design

Full screen (f)
exit full mode
Question
What makes systems integration so difficult?

A)Finding the original data to install on the new server
B)Creating a ghost drive to house the old information
C)Installing new software packages on older machines
D)Bringing legacy system data and new data together
E)None of the above
Use Space or
up arrow
down arrow
to flip the card.
Question
Which is probably true about packaged software

A)In most cases,the software is a perfect fit for the companies need
B)Packaged software works best where the company has a unique need
C)The time frame is flexible to long
D)The business need is common
E)The project has a highly skills project manager who has been with the company for many years and has an excellent relationship with both business users and the IT development staff
Question
System design is the determination of the overall system architecture-consisting of a set of physical processing components,_______________,and the communication among them-that will satisfy the system's essential requirements.

A)Workmanship
B)Order entry methods,HR feedback
C)Hardware,Software,People
D)Engineering data plans,fiber optic specifications
E)None of the above
Question
Which of the following lists indicates the correct ordering of deliverables in a system specification document?

A)System Acquisition Weighted Alternative Matrix,Interface Design,Physical Data Model Data Storage Design
B)Data Storage Design,Interface Design,Architecture Design,Updated Crud Matrix
C)Hardware and Software Specifications,Interface Design,Data Storage Design,Architecture Design
D)Program Design Specifications,Physical Data Model,Data Storage Design,Architecture Design
E)Update CASE Repository Entries,Update CRUD Matrix,Interface Design,Architecture Design
Question
Systems Integration refers to:

A)The process of synching all computers to the mainframe
B)The delivery of systems to the final destination office
C)Combining packaged software,the legacy system and new software
D)Adding the original hard drives to a newer system
E)Creating a new software to monitor power consumption
Question
For efficiency purposes,it is wise to___________ when there is a basic software need to be satisfied.

A)Implement a company-wide project team to handle a custom software scripting
B)Purchase a packaged system
C)Design a blueprint and contract an outside vendor to develop a program
D)Make do with the current software package
E)Utilize a professional consultant to develop a system of servers7
Question
In the initial stage of design,what are business requirements converted into?

A)System Requirements
B)Work Order Summary
C)Computer Qualifications Checklist
D)Vanilla System
E)Hardware Blueprint
Question
The system inputs and outputs will be designed along with a plan or__________ of the way the system's features will be navigated.

A)Blueprint
B)Compass
C)Instructional Guide
D)Roadmap
E)FAQ
Question
Enterprise Resource Planning (ERP)Systems are:

A)All-encompassing systems
B)Difficult to install and can result in serious problems for a company
C)Cheaper since they are created by a third party
D)A and B
E)B and C
Question
Where are the decisions stored that are made regarding the hardware and software that will be purchased to support the new system?

A)Order Manifest
B)Hardware Sales Receipt
C)Suppliers' Computer System
D)President's Office
E)Hardware and Software Specification
Question
Which might NOT be a good package software solution?

A)Payroll at Cloverfarms dairy
B)Accounts receivable at Staples
C)Rocket control software for NASA
D)Course management system at the University of Nebraska
E)Scanning software for Kroger grocery stores
Question
How many ways does the text suggest one can approach the creation of a new system?

A)1
B)2
C)3
D)4
E)7
Question
In what SDLC stage do we determine the business needs for an information systems project?

A)The design phase
B)The analysis phase
C)The dissection stage
D)The installation stage
E)The big bang stage
Question
Another name for custom development might be:

A)Offshore outsourcing
B)In-house development
C)Vendor supplied in-house consulting
D)CASE tools
E)Package software
Question
Workarounds are:

A)Not supported by a vendor who supplied the software
B)Designed by the vendor
C)Created to interface two software packages that are compatible with each other
D)Enterprise Wide Software Packages that are designed for satellite use
E)None of the above
Question
What skills are necessary when undertaking a custom software design?

A)Technical
B)Functional
C)Project Management
D)A and C
E)A,B,and C
Question
The system specification contains what?

A)Design documents,hardware and software specification
B)Physical process models,interface design
C)Physical data model
D)Architecture design
E)All of the above
Question
_______ repository entries are updated to reflect specific technology decisions as they are made.

A)DFD
B)Sequential
C)CASE
D)Hardware
E)None of the above
Question
During the design stage,the team must create a(n)_________ by specifying access restrictions and by identifying the need for ________,authentication and virus control.

A)System,integration
B)Security breach,emergency access
C)Secure system,encryption
D)Automated program,constant testing
E)Pecking order,governmental access
Question
If on a limited time budget,the best way to be sure you remain efficient and effective in designing a system is to utilize the ____________.

A)Porters 5 Forces Model
B)Outsourcing Model
C)RAD and Timeboxing Techniques
D)Hire/Fire Motivational Theory
E)Not Attempt the Project
Question
Becky is preparing a document that has detailed description of needs,special technical factors,evaluation criteria,timetable and more.She is probably working on a(n):

A)CRUD matrix
B)Alternative Matrix
C)RFP
D)ERP
E)DFD
Question
Custom development is used when:

A)The business need is unique
B)The business need is not core to the business
C)The project has a project manager who can coordinate vendor efforts
D)The time frame is short
E)The skills are not strategic
Question
Application service providers might be best associated with:

A)In-house development
B)Packaged software
C)Unique and strategic systems
D)Outsourcing
E)Internet Service Providers
Question
What can push a project off track?

A)Funding
B)Staffing
C)Business users
D)A and B
E)A,B and C
Question
Packaged systems are used when:

A)The business need is not core to the business
B)There is a desire to build in-house skills
C)The time frame is flexible
D)The project has a project manager who can coordinate vendor efforts
E)The decision to outsource is strategic
Question
Matt is an analyst for the Pauxtis Media Company.He is in his office at 5:00 a.m.every Tuesday morning for a project update videoconference.He is probably involved in:

A)In-house development
B)Working with vendors on an RFP
C)Customizing a package to fit Pauxtis
D)Working with his regional Ernst and Young consulting team
E)Offshore outsourcing
Question
The design phase of the SDLC:

A)Produces a user's manual,does users training and creates online documentation for the new system
B)Involves writing of code (generally in an object oriented language)
C)Uses the output of JAD sessions to create logical use cases and DFDs
D)Involves interviewing of users to determine requirements
E)Uses the requirements that were gathered during analysis to create a blueprint for the future system
Question
Fixed-price contracts are considered:

A)Very flexible
B)Very rigid
C)Always cheaper than any other option
D)Useless when considering a systems design
E)Always the best option for any project
Question
Outsourcing is used when:

A)The project has a project manager who can coordinate vendor efforts
B)There is a desire to build in-house skills
C)In-house functional and technical skills exist
D)The business need is not core to the business
E)None of the above
Question
The score column in the Alternative Matrix represents what?

A)How expensive the install will be
B)How easy the install will be
C)How well the criteria are met by the alternative
D)How long the coded page will be
E)A and D
Question
Requests for Proposals (RFPs)should contain

A)Detailed description of needs
B)Special technical needs
C)Evaluation criteria
D)A and B
E)A,B and C
Question
When only a price is needed from a vendor,the following will likely be requested from the possible vendors:

A)Request for Proposal (RFP)
B)Request for Information (RFI)
C)Request for Quote (RFQ)
D)Request for Efficient Information Distribution (REID)
E)More Optimal Desires (MOD)
Question
A Request for Information (RFI)is used with vendors when there is a need for ________?

A)Pricing
B)Data Analysis
C)Information
D)Network Associate Password Help
E)None of the above
Question
A time and arrangements deal is considered:

A)Very flexible
B)Very rigid
C)Cheaper than any other option
D)Useless when considering a systems design
E)Always the best option for any project
Question
The following document is utilized with possible vendors on projects with smaller budgets,instead of sending a lengthy document to all possible vendors:

A)Request for Proposal (RFP)
B)Request for Information (RFI)
C)Request for Quote (RFQ)
D)Request for Efficient Information Distribution (REID)
E)More Optimal Desires (MOD)
Question
Outsourcing can include:

A)Hiring an external vendor
B)Hiring an external developer
C)Hiring an external service provider
D)A and C
E)A,B and C
Question
Outsourcing firms called _____________ supply software applications and/or software related services through the Internet.

A)Application Service Providers (ASPs)
B)Enterprise Resource Providers (ERPs)
C)System Development Life Cycle Companies (SDLCs)
D)Information Technology Developers (ITDs)
E)None of the above
Question
Requests for Proposals (RFPs)serve what purpose?

A)Integrate systems with one another
B)Create synergy amongst staff members
C)Solicit information from providers
D)Engage mobile computers with mainframe technology
E)Develop morale amongst managers
Question
CRUD matrix can be used in the design phase to work with tables and possible user interaction with those tables.The letter "C" in CRUD stands for:

A)Computer
B)Create
C)Communicate
D)Complete
E)Constant
Question
Value-added projects are:

A)When the outsourcer earns a percentage of the completed systems benefits
B)Not a feasible option for any project at any time
C)Gaining popularity
D)A and C
E)None of the above
Question
If (a)the business need is common;(b)the skills needed are not strategic;(c)the time frame is short;it might be best to:

A)Use in-house / custom development
B)Hire a vendor to write the code for you
C)Outsource to India
D)Purchase a software package
E)Hire a consultant
Question
An advantage of custom development might be:

A)You get a system that is tailored to the current business and meets specific needs
B)The rapid development of custom systems
C)The low cost (as compared to buying a package)
D)The low risk factor
E)The ability for in-house developers to work on systems that are in new programming languages and in technologies that are unknown to them prior to the development
Question
RFP is an acronym for:

A)Reason for Programming
B)Request for Proposal
C)Rational Forensics Platform
D)Relationship with Foreign Providers
E)Real Forecast Project
Question
One problem with using packages software systems is:

A)It takes a very long time to get the system and get it installed
B)The company has to accept the functionality that is provided with the system
C)Many common software packages have been written and tested and are readily available
D)There are many good software packages that are reasonable in price
E)Most software packages allow for some customization
Question
Which of the following is normally NOT done in the design phase of the SDLC?

A)Decisions for hardware and software purchases are made
B)User interactions are planned out (inputs,outputs,user interfaces)
C)Cost / Benefits of the new system are carefully calculated
D)Logical DFDs and ERDs are converted into physical DFDs and ERDs
E)The physical data model is created
Question
Which is NOT a part of the System Specification document?

A)Use Cases
B)Physical Data Model
C)Updated CRUD matrix
D)Architecture Design
E)System Acquisition Weighted alternative Matrix
Question
If (a)the business need is not core to the business;(b)the project has a highly skilled project manager;(c)in-house functional or technical experience does not exist;it might be best to:

A)Use in-house / custom development
B)Buy an ERP system
C)Outsource to a company specializing in that technology
D)Purchase a software package
E)Hire a consultant
Question
What percentage of companies on the InformationWeek 500 list of business technology innovators say they engage in offshore IT outsourcing?

A)0 to 10%
B)10% to 25%
C)25% to 40%
D)40% to 60%
E)Over 60%
Question
Which of the following is NOT a system acquisition strategy as presented in the book?

A)Custom development
B)Outsourcing to a regional consultant (like IBM)
C)Use a JAD session to acquire the system
D)Using the company's programming staff to write the code (aka 'in-house development')
E)Buying a pre-written software package
Question
A Request for Proposal (RFP)will result in a:

A)Vendor proposal that is a binding offer to accomplish the tasks described in the RFP
B)Gentleman's agreement on the offer
C)Substantially more expensive project
D)Custom development
E)Reduction in in-house programming effort
Question
Which is NOT a factor in choosing a development option?

A)Data base normalization
B)In-house experience
C)Time frame
D)Project skills
E)Project management
Question
Which is NOT a recommended guideline for managing outsourcing?

A)Define and stabilize requirements before signing a contract
B)Don't outsource what you don't understand
C)Emphasize rigid expectations and short-term relationships
D)Select the vendor,developer or service provider carefully
E)Keep the lines of communication open between you and your outsourcer
Question
A table that can be used to look at various design options is a(n):

A)RFP
B)CRUD
C)Gantt Chart
D)Alternative Matrix
E)SQL query
Question
If (a)the business need is unique,(b)there is a desire to build in-house skills;(c)the time frame is flexible,it might be best to:

A)Do in-house / custom development
B)Buy an ERP system
C)Outsource to India
D)Purchase a software package
E)Hire a consultant
Question
The letter 'R' in CRUD matrix (for tables and user involvement)stands for:

A)Replace
B)Replicate
C)Relationship
D)Read
E)Read-only
Question
Which is NOT true of outsourcing?

A)It can be done offshore
B)It can be done by an ASP
C)There can be a low cost of entry
D)It requires a large in-house staff
E)It can reduce internal IT costs
Question
In terms of project management,which option might require excellent project management skills and a proven methodology?

A)Outsourcing to Nebraska
B)Outsourcing to India
C)Buying a packaged solution
D)Doing custom development
E)Buying an ERP system
Question
Which is NOT one of the primary contract types made with outsourcing?

A)Time and arrangements
B)Fixed-price contract
C)Distance and confluence contract
D)Value-added contract
E)Paying for the expenses and time to get the job done
Question
The letter "D" in CRUD matrix stands for:

A)Delete
B)Deny use
C)Deliver
D)Document
E)Denormalize
Question
Which of the following will probably NOT be part of a Request for Proposal (RFP)?

A)Certain key facts that the vendor requires
B)Special technical needs
C)Procedures to follow
D)Project timetable
E)Use case diagrams
Question
When using an alternative matrix,frequently analysts will assign ____________ to certain factors to signify the importance of the factor in the decision.

A)Probabilities
B)Reluctance factors
C)Weights
D)Project sponsors
E)Data stores
Question
Time and arrangements deals are potentially more expensive if the service provider requires unforeseen resources to complete the project on time.
Question
There is absolutely no need for designing a custom system since there are already so many pre-packaged systems available to any company regardless of its size.
Question
Prototyping is the interface design step that often uncovers additional information that is needed in the system,leading to a revision of the physical DFDs or ERPs.
Question
There is no need to determine the reliability or performance of a new system due to the inherent dangers all technologies pose.
Question
In a custom software case,all parts of the system need to be completely customized and scripted to the company's specifications including ancillary software to the current system.
Question
A workaround is a custom-built add-on program that interfaces with packaged applications to handle specific needs.
Question
The decision to make,to buy,or to outsource influences the design tasks that are performed throughout the rest of the design phase.
Question
Outsourcing firms called Application Software Providers (ASPs)supply software applications and/or software related services through the Internet.
Question
CASE repository entries are updated to reflect specific technology decisions as they are made.
Question
Letting technology drive a business can be dangerous.
Question
System requirements are communicated through a collection of design documents and physical processes and data models.
Question
Application Software Providers (ASPs)should be utilized when considering non-core programming and/custom needs.
Question
The key challenge in systems integration is avoiding a system wide crash upon installation of legacy software.
Question
Highly skilled IS Professionals are easy to hire and retain.
Question
Outsourcing requires the least in-house resources.
Question
Business requirements are communicated through a collection of design documents and physical processes and data models.
Question
Building a system in-house builds technical skills and functional knowledge that one may not want to allow to walk out of the door.
Question
If the business need is core to the business then it is best to outsource the system development.
Question
An outsourcing arrangement where you pay no more than what was expected is known as a(n):

A)Time and arrangements contract
B)Fixed-price contract
C)Value-added contract
D)Distance and time contract
E)Billing operational contract
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/106
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Moving Into Design
1
What makes systems integration so difficult?

A)Finding the original data to install on the new server
B)Creating a ghost drive to house the old information
C)Installing new software packages on older machines
D)Bringing legacy system data and new data together
E)None of the above
D
2
Which is probably true about packaged software

A)In most cases,the software is a perfect fit for the companies need
B)Packaged software works best where the company has a unique need
C)The time frame is flexible to long
D)The business need is common
E)The project has a highly skills project manager who has been with the company for many years and has an excellent relationship with both business users and the IT development staff
D
3
System design is the determination of the overall system architecture-consisting of a set of physical processing components,_______________,and the communication among them-that will satisfy the system's essential requirements.

A)Workmanship
B)Order entry methods,HR feedback
C)Hardware,Software,People
D)Engineering data plans,fiber optic specifications
E)None of the above
C
4
Which of the following lists indicates the correct ordering of deliverables in a system specification document?

A)System Acquisition Weighted Alternative Matrix,Interface Design,Physical Data Model Data Storage Design
B)Data Storage Design,Interface Design,Architecture Design,Updated Crud Matrix
C)Hardware and Software Specifications,Interface Design,Data Storage Design,Architecture Design
D)Program Design Specifications,Physical Data Model,Data Storage Design,Architecture Design
E)Update CASE Repository Entries,Update CRUD Matrix,Interface Design,Architecture Design
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
5
Systems Integration refers to:

A)The process of synching all computers to the mainframe
B)The delivery of systems to the final destination office
C)Combining packaged software,the legacy system and new software
D)Adding the original hard drives to a newer system
E)Creating a new software to monitor power consumption
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
6
For efficiency purposes,it is wise to___________ when there is a basic software need to be satisfied.

A)Implement a company-wide project team to handle a custom software scripting
B)Purchase a packaged system
C)Design a blueprint and contract an outside vendor to develop a program
D)Make do with the current software package
E)Utilize a professional consultant to develop a system of servers7
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
7
In the initial stage of design,what are business requirements converted into?

A)System Requirements
B)Work Order Summary
C)Computer Qualifications Checklist
D)Vanilla System
E)Hardware Blueprint
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
8
The system inputs and outputs will be designed along with a plan or__________ of the way the system's features will be navigated.

A)Blueprint
B)Compass
C)Instructional Guide
D)Roadmap
E)FAQ
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
9
Enterprise Resource Planning (ERP)Systems are:

A)All-encompassing systems
B)Difficult to install and can result in serious problems for a company
C)Cheaper since they are created by a third party
D)A and B
E)B and C
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
10
Where are the decisions stored that are made regarding the hardware and software that will be purchased to support the new system?

A)Order Manifest
B)Hardware Sales Receipt
C)Suppliers' Computer System
D)President's Office
E)Hardware and Software Specification
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
11
Which might NOT be a good package software solution?

A)Payroll at Cloverfarms dairy
B)Accounts receivable at Staples
C)Rocket control software for NASA
D)Course management system at the University of Nebraska
E)Scanning software for Kroger grocery stores
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
12
How many ways does the text suggest one can approach the creation of a new system?

A)1
B)2
C)3
D)4
E)7
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
13
In what SDLC stage do we determine the business needs for an information systems project?

A)The design phase
B)The analysis phase
C)The dissection stage
D)The installation stage
E)The big bang stage
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
14
Another name for custom development might be:

A)Offshore outsourcing
B)In-house development
C)Vendor supplied in-house consulting
D)CASE tools
E)Package software
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
15
Workarounds are:

A)Not supported by a vendor who supplied the software
B)Designed by the vendor
C)Created to interface two software packages that are compatible with each other
D)Enterprise Wide Software Packages that are designed for satellite use
E)None of the above
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
16
What skills are necessary when undertaking a custom software design?

A)Technical
B)Functional
C)Project Management
D)A and C
E)A,B,and C
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
17
The system specification contains what?

A)Design documents,hardware and software specification
B)Physical process models,interface design
C)Physical data model
D)Architecture design
E)All of the above
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
18
_______ repository entries are updated to reflect specific technology decisions as they are made.

A)DFD
B)Sequential
C)CASE
D)Hardware
E)None of the above
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
19
During the design stage,the team must create a(n)_________ by specifying access restrictions and by identifying the need for ________,authentication and virus control.

A)System,integration
B)Security breach,emergency access
C)Secure system,encryption
D)Automated program,constant testing
E)Pecking order,governmental access
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
20
If on a limited time budget,the best way to be sure you remain efficient and effective in designing a system is to utilize the ____________.

A)Porters 5 Forces Model
B)Outsourcing Model
C)RAD and Timeboxing Techniques
D)Hire/Fire Motivational Theory
E)Not Attempt the Project
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
21
Becky is preparing a document that has detailed description of needs,special technical factors,evaluation criteria,timetable and more.She is probably working on a(n):

A)CRUD matrix
B)Alternative Matrix
C)RFP
D)ERP
E)DFD
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
22
Custom development is used when:

A)The business need is unique
B)The business need is not core to the business
C)The project has a project manager who can coordinate vendor efforts
D)The time frame is short
E)The skills are not strategic
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
23
Application service providers might be best associated with:

A)In-house development
B)Packaged software
C)Unique and strategic systems
D)Outsourcing
E)Internet Service Providers
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
24
What can push a project off track?

A)Funding
B)Staffing
C)Business users
D)A and B
E)A,B and C
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
25
Packaged systems are used when:

A)The business need is not core to the business
B)There is a desire to build in-house skills
C)The time frame is flexible
D)The project has a project manager who can coordinate vendor efforts
E)The decision to outsource is strategic
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
26
Matt is an analyst for the Pauxtis Media Company.He is in his office at 5:00 a.m.every Tuesday morning for a project update videoconference.He is probably involved in:

A)In-house development
B)Working with vendors on an RFP
C)Customizing a package to fit Pauxtis
D)Working with his regional Ernst and Young consulting team
E)Offshore outsourcing
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
27
The design phase of the SDLC:

A)Produces a user's manual,does users training and creates online documentation for the new system
B)Involves writing of code (generally in an object oriented language)
C)Uses the output of JAD sessions to create logical use cases and DFDs
D)Involves interviewing of users to determine requirements
E)Uses the requirements that were gathered during analysis to create a blueprint for the future system
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
28
Fixed-price contracts are considered:

A)Very flexible
B)Very rigid
C)Always cheaper than any other option
D)Useless when considering a systems design
E)Always the best option for any project
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
29
Outsourcing is used when:

A)The project has a project manager who can coordinate vendor efforts
B)There is a desire to build in-house skills
C)In-house functional and technical skills exist
D)The business need is not core to the business
E)None of the above
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
30
The score column in the Alternative Matrix represents what?

A)How expensive the install will be
B)How easy the install will be
C)How well the criteria are met by the alternative
D)How long the coded page will be
E)A and D
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
31
Requests for Proposals (RFPs)should contain

A)Detailed description of needs
B)Special technical needs
C)Evaluation criteria
D)A and B
E)A,B and C
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
32
When only a price is needed from a vendor,the following will likely be requested from the possible vendors:

A)Request for Proposal (RFP)
B)Request for Information (RFI)
C)Request for Quote (RFQ)
D)Request for Efficient Information Distribution (REID)
E)More Optimal Desires (MOD)
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
33
A Request for Information (RFI)is used with vendors when there is a need for ________?

A)Pricing
B)Data Analysis
C)Information
D)Network Associate Password Help
E)None of the above
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
34
A time and arrangements deal is considered:

A)Very flexible
B)Very rigid
C)Cheaper than any other option
D)Useless when considering a systems design
E)Always the best option for any project
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
35
The following document is utilized with possible vendors on projects with smaller budgets,instead of sending a lengthy document to all possible vendors:

A)Request for Proposal (RFP)
B)Request for Information (RFI)
C)Request for Quote (RFQ)
D)Request for Efficient Information Distribution (REID)
E)More Optimal Desires (MOD)
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
36
Outsourcing can include:

A)Hiring an external vendor
B)Hiring an external developer
C)Hiring an external service provider
D)A and C
E)A,B and C
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
37
Outsourcing firms called _____________ supply software applications and/or software related services through the Internet.

A)Application Service Providers (ASPs)
B)Enterprise Resource Providers (ERPs)
C)System Development Life Cycle Companies (SDLCs)
D)Information Technology Developers (ITDs)
E)None of the above
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
38
Requests for Proposals (RFPs)serve what purpose?

A)Integrate systems with one another
B)Create synergy amongst staff members
C)Solicit information from providers
D)Engage mobile computers with mainframe technology
E)Develop morale amongst managers
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
39
CRUD matrix can be used in the design phase to work with tables and possible user interaction with those tables.The letter "C" in CRUD stands for:

A)Computer
B)Create
C)Communicate
D)Complete
E)Constant
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
40
Value-added projects are:

A)When the outsourcer earns a percentage of the completed systems benefits
B)Not a feasible option for any project at any time
C)Gaining popularity
D)A and C
E)None of the above
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
41
If (a)the business need is common;(b)the skills needed are not strategic;(c)the time frame is short;it might be best to:

A)Use in-house / custom development
B)Hire a vendor to write the code for you
C)Outsource to India
D)Purchase a software package
E)Hire a consultant
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
42
An advantage of custom development might be:

A)You get a system that is tailored to the current business and meets specific needs
B)The rapid development of custom systems
C)The low cost (as compared to buying a package)
D)The low risk factor
E)The ability for in-house developers to work on systems that are in new programming languages and in technologies that are unknown to them prior to the development
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
43
RFP is an acronym for:

A)Reason for Programming
B)Request for Proposal
C)Rational Forensics Platform
D)Relationship with Foreign Providers
E)Real Forecast Project
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
44
One problem with using packages software systems is:

A)It takes a very long time to get the system and get it installed
B)The company has to accept the functionality that is provided with the system
C)Many common software packages have been written and tested and are readily available
D)There are many good software packages that are reasonable in price
E)Most software packages allow for some customization
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following is normally NOT done in the design phase of the SDLC?

A)Decisions for hardware and software purchases are made
B)User interactions are planned out (inputs,outputs,user interfaces)
C)Cost / Benefits of the new system are carefully calculated
D)Logical DFDs and ERDs are converted into physical DFDs and ERDs
E)The physical data model is created
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
46
Which is NOT a part of the System Specification document?

A)Use Cases
B)Physical Data Model
C)Updated CRUD matrix
D)Architecture Design
E)System Acquisition Weighted alternative Matrix
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
47
If (a)the business need is not core to the business;(b)the project has a highly skilled project manager;(c)in-house functional or technical experience does not exist;it might be best to:

A)Use in-house / custom development
B)Buy an ERP system
C)Outsource to a company specializing in that technology
D)Purchase a software package
E)Hire a consultant
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
48
What percentage of companies on the InformationWeek 500 list of business technology innovators say they engage in offshore IT outsourcing?

A)0 to 10%
B)10% to 25%
C)25% to 40%
D)40% to 60%
E)Over 60%
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following is NOT a system acquisition strategy as presented in the book?

A)Custom development
B)Outsourcing to a regional consultant (like IBM)
C)Use a JAD session to acquire the system
D)Using the company's programming staff to write the code (aka 'in-house development')
E)Buying a pre-written software package
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
50
A Request for Proposal (RFP)will result in a:

A)Vendor proposal that is a binding offer to accomplish the tasks described in the RFP
B)Gentleman's agreement on the offer
C)Substantially more expensive project
D)Custom development
E)Reduction in in-house programming effort
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
51
Which is NOT a factor in choosing a development option?

A)Data base normalization
B)In-house experience
C)Time frame
D)Project skills
E)Project management
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
52
Which is NOT a recommended guideline for managing outsourcing?

A)Define and stabilize requirements before signing a contract
B)Don't outsource what you don't understand
C)Emphasize rigid expectations and short-term relationships
D)Select the vendor,developer or service provider carefully
E)Keep the lines of communication open between you and your outsourcer
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
53
A table that can be used to look at various design options is a(n):

A)RFP
B)CRUD
C)Gantt Chart
D)Alternative Matrix
E)SQL query
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
54
If (a)the business need is unique,(b)there is a desire to build in-house skills;(c)the time frame is flexible,it might be best to:

A)Do in-house / custom development
B)Buy an ERP system
C)Outsource to India
D)Purchase a software package
E)Hire a consultant
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
55
The letter 'R' in CRUD matrix (for tables and user involvement)stands for:

A)Replace
B)Replicate
C)Relationship
D)Read
E)Read-only
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
56
Which is NOT true of outsourcing?

A)It can be done offshore
B)It can be done by an ASP
C)There can be a low cost of entry
D)It requires a large in-house staff
E)It can reduce internal IT costs
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
57
In terms of project management,which option might require excellent project management skills and a proven methodology?

A)Outsourcing to Nebraska
B)Outsourcing to India
C)Buying a packaged solution
D)Doing custom development
E)Buying an ERP system
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
58
Which is NOT one of the primary contract types made with outsourcing?

A)Time and arrangements
B)Fixed-price contract
C)Distance and confluence contract
D)Value-added contract
E)Paying for the expenses and time to get the job done
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
59
The letter "D" in CRUD matrix stands for:

A)Delete
B)Deny use
C)Deliver
D)Document
E)Denormalize
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following will probably NOT be part of a Request for Proposal (RFP)?

A)Certain key facts that the vendor requires
B)Special technical needs
C)Procedures to follow
D)Project timetable
E)Use case diagrams
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
61
When using an alternative matrix,frequently analysts will assign ____________ to certain factors to signify the importance of the factor in the decision.

A)Probabilities
B)Reluctance factors
C)Weights
D)Project sponsors
E)Data stores
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
62
Time and arrangements deals are potentially more expensive if the service provider requires unforeseen resources to complete the project on time.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
63
There is absolutely no need for designing a custom system since there are already so many pre-packaged systems available to any company regardless of its size.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
64
Prototyping is the interface design step that often uncovers additional information that is needed in the system,leading to a revision of the physical DFDs or ERPs.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
65
There is no need to determine the reliability or performance of a new system due to the inherent dangers all technologies pose.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
66
In a custom software case,all parts of the system need to be completely customized and scripted to the company's specifications including ancillary software to the current system.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
67
A workaround is a custom-built add-on program that interfaces with packaged applications to handle specific needs.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
68
The decision to make,to buy,or to outsource influences the design tasks that are performed throughout the rest of the design phase.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
69
Outsourcing firms called Application Software Providers (ASPs)supply software applications and/or software related services through the Internet.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
70
CASE repository entries are updated to reflect specific technology decisions as they are made.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
71
Letting technology drive a business can be dangerous.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
72
System requirements are communicated through a collection of design documents and physical processes and data models.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
73
Application Software Providers (ASPs)should be utilized when considering non-core programming and/custom needs.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
74
The key challenge in systems integration is avoiding a system wide crash upon installation of legacy software.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
75
Highly skilled IS Professionals are easy to hire and retain.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
76
Outsourcing requires the least in-house resources.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
77
Business requirements are communicated through a collection of design documents and physical processes and data models.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
78
Building a system in-house builds technical skills and functional knowledge that one may not want to allow to walk out of the door.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
79
If the business need is core to the business then it is best to outsource the system development.
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
80
An outsourcing arrangement where you pay no more than what was expected is known as a(n):

A)Time and arrangements contract
B)Fixed-price contract
C)Value-added contract
D)Distance and time contract
E)Billing operational contract
Unlock Deck
Unlock for access to all 106 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 106 flashcards in this deck.