Deck 4: Material Requirements Planning
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/30
Play
Full screen (f)
Deck 4: Material Requirements Planning
1
__________bills are an artificial grouping of components for planning purposes. They are used to simplify forecasting, master production scheduling, and materials requirements planning.
A) Planning
B) Pegging
C) Indented
D) Summarized parts
A) Planning
B) Pegging
C) Indented
D) Summarized parts
Planning
2
__________include information such as order quantities, lead times, safety stock, and scrap.
A) Bill of materials
B) Bill of Material Processors
C) Planning factors
D) Inventory records
A) Bill of materials
B) Bill of Material Processors
C) Planning factors
D) Inventory records
Planning factors
3
Product X is made from two units of A and one unit of B. Product Y is made from one unit of B and two units of C. Each A is made up of two units of C and one unit of D. Each unit of B is made up of two units of E. Construct the product tree. How many Cs are needed to make 50 Xs and 100Ys?
400 Cs. 200 from parent X [hint: take A's quantity and multiply by 2] and 200 from parent Y)
4
Describe situations that will generate exception messages in MRP.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
5
Complete the following table. Lead time for the part is two weeks. The lot size is 100. What is the projected available at the end of week 3? When is it planned to release an order? 

Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
6
A__________ report is similar to a where- used report. However, the report shows only those parents for which there is an existing requirement.
A) indented
B) planning
C) pegging
D) manufacturing
A) indented
B) planning
C) pegging
D) manufacturing
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
7
Each level in the bill of material is assigned a number starting from the __________and working __________.
A) bottom, up
B) top, down
C) bottom, down
D) top, up
A) bottom, up
B) top, down
C) bottom, down
D) top, up
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
8
Where does feedback to the planner originate?
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
9
The product tree and the bill of material are called single- level structures. As assembly is considered a __________and the items that compose it are called its__________ .
A) parent, component items
B) parent, multilevel bill
C) multilevel bill, parent
D) component, parents
A) parent, component items
B) parent, multilevel bill
C) multilevel bill, parent
D) component, parents
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
10
The dependency of a component on its parent is__________ .
A) vertical
B) horizontal
C) diagonal
D) circular
A) vertical
B) horizontal
C) diagonal
D) circular
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
11
Complete the following table. Lead time for the item is two weeks and the order quantity is 200.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
12
The manufacturer of dishwashers uses flexible connection hose material in the assembly of the units. In the assembly of the dishwasher, the hose is a/an __________item.
A) can be dependent or independent
B) independent
C) dependent
D) none of the above
A) can be dependent or independent
B) independent
C) dependent
D) none of the above
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
13
What are the uses of bills of material?
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
14
__________is the process of placing the exploded requirements in their proper periods based on lead time.
A) Offsetting
B) Planned order computation
C) Exploding the requirements
D) Lead time determination
A) Offsetting
B) Planned order computation
C) Exploding the requirements
D) Lead time determination
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
15
Each part or item has__________ part number.
A) multiple
B) less than five
C) two
D) only one
A) multiple
B) less than five
C) two
D) only one
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
16
What are the basic responsibilities of a planner?
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
17
Complete the following table. Lead time for the part is two weeks and the order quantity is
40. What action should be taken?
40. What action should be taken?

Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
18
Define and describe MRP. How is it related to the MPS?
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
19
Product cost is usually broken down into__________ .
A) direct material and direct labor
B) direct labor and overhead
C) direct material, direct labor, and overhead
D) direct material and overhead
A) direct material and direct labor
B) direct labor and overhead
C) direct material, direct labor, and overhead
D) direct material and overhead
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
20
Complete the following table. Lead time for the part is two weeks. The order quantity, or lot size, is 100 units. 

Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
21
A good MRP system generated exception messages to advise the planner when some event needs attention.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
22
Sometimes requirements change rapidly and by small amounts, causing the materials requirements plan to change back and forth. The planner must judge whether the changes are important enough to react to and whether an order should be released.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
23
Transaction messages mean that the planner must tell the MRP software of all actions that that will influence the MRP records.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
24
Planned order releases are just planned; they have not been released.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
25
The people who manage the material requirements planning system are called planners.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
26
The number of periods in the record is called the planning horizon, which shows the number of past periods for which plans are being made.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
27
Most companies make more than one product and often use the same components in many of their products.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
28
Low- level codes are determined by starting at the highest level of a bill of materials and working down, recording the level against the part.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
29
Priority refers to maintaining the correct due dates by constantly evaluating the true due- date need for released orders and, if necessary,k expediting or de- expediting.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
30
When released, the order becomes an open order to the factory or to purchasing and appears on the MRP record as a schedule receipt.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck