Deck 21: Material Requirements Planning
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/91
Play
Full screen (f)
Deck 21: Material Requirements Planning
1
Net change MRP systems are "activity" driven.
True
2
A modular bill-of-materials is the term for an item that can be produced and stocked as a subassembly.
True
3
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to become "lumpy."
True
4
Manufacturing firms maintain bill of materials (BOM) files, which are simply a sequencing of everything that goes into a final product.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
5
MRP is based on dependent demand.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
6
A modular bill-of-materials includes items with fractional options.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
7
An input to the material requirements planning (MRP) system is an inventory records file.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
8
A BOM file is often called a product structure file or product tree because it shows how a product is put together.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
9
MRP is a logical, easily understandable approach to the problem of determining the number of parts, components, and materials needed to produce each end item.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
10
An input to the material requirements planning (MRP) system is an exception report.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
11
MRP is most valuable where a number of products are made in batches using the same productive equipment.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
12
The deeper one looks into the product creation sequence, the more the requirements of dependent demand items tend to smooth out and become even over time.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
13
MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
14
The master production schedule states the number of items to be produced during specific time periods.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
15
A master production schedule is an input to a material requirements planning (MRP) system.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
16
The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
17
An output of MRP is a bill of materials (BOM) file.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
18
MRP stands for Material Requirements Planning.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
19
Computing the quantity of each component that goes into a finished product can be done by expanding (or exploding) each item in a product structure file and summing at all levels.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
20
MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
21
Projected available balance is the amount of inventory that is expected as of the beginning of a period.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
22
The least unit cost method of lot-sizing adds ordering, stock-out, and inventory carrying costs for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
23
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup cost, carrying cost, and cost of stockouts.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
24
In a net change MRP program, a change in one item will result in a completely new inventory plan and schedule for every item in the master production schedule.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
25
The lot-for-lot (L4L) lot-sizing technique minimizes carrying cost by taking into account setup costs and capacity limitations.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
26
Generally, determining lot sizes in MRP systems is simple.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
27
The three main inputs to an MRP system are the bill-of-materials, the master schedule, and the inventory records file.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
28
In a net change MRP system, requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
29
When implemented correctly, MRP links all areas of the business.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
30
Lot-for-lot (L4L) is the most common lot-sizing technique.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
31
The economic order quantity (EOQ) lot-sizing technique produces or acquires exactly the amount of product that is needed each time period with none carried over into future periods.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
32
"Projected available balance" is a term referring to unsold finished goods inventory.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
33
The least unit cost method (LUC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
34
The least unit cost method of lot-sizing technique adds ordering and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
35
A lot-for-lot (L4L) lot-sizing technique does not take into account setup costs or capacity limitations.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
36
Low-level coding in MRP indicates the exact status of each item managed by the system in "real time."
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
37
The least total cost method (LTC) lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering) costs for various lot sizes and then selects the lot in which these are most nearly equal.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
38
Net change MRP reflects the exact status of each item managed by the system in "real time."
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
39
In a net change MRP system, requirements and schedules are considered rigid and never updated.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
40
The economic order quantity (EOQ) lot-sizing technique uses the "square root formula" to balance setup costs and carrying costs.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following industry types have high expected benefits from the application of MRP?
A) Fabricate-to-order
B) Hospitals
C) Assemble-to-order
D) Aircraft manufacturers
E) Oil refineries
A) Fabricate-to-order
B) Hospitals
C) Assemble-to-order
D) Aircraft manufacturers
E) Oil refineries
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
42
The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
43
In this industry type, items are manufactured by machine rather than assembled from parts. These are standard stock items carried in anticipation of customer demand.
A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
44
This industry type combines multiple component parts into a finished product, which is then stocked in inventory to satisfy customer demand.
A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
45
Time fences are periods of time having some specified level of opportunity for the customer to make changes.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
46
The customer grace period is a time span having some specified level of opportunity for the customer to make changes.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
47
A product tree can do which of the following?
A) Help to compute component usage.
B) Reduce product scrap.
C) Reduce labor overtime.
D) Reduce regular time labor.
E) Locate raw material supplies.
A) Help to compute component usage.
B) Reduce product scrap.
C) Reduce labor overtime.
D) Reduce regular time labor.
E) Locate raw material supplies.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
48
Which of the following is an input to the master production schedule (MPS)?
A) Inventory records file
B) The aggregate plan
C) The bill-of-materials
D) The exception report
E) Planned order schedules
A) Inventory records file
B) The aggregate plan
C) The bill-of-materials
D) The exception report
E) Planned order schedules
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following is not a direct input to the material planning?
A) Bill-of-material file
B) Aggregate production plan
C) Master production schedule
D) Inventory records file
A) Bill-of-material file
B) Aggregate production plan
C) Master production schedule
D) Inventory records file
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following industry types will not benefit greatly from the application of MRP?
A) Fabricate-to-order
B) Assemble-to-stock
C) Assemble-to-order
D) Manufacture-to-order
E) None of these choices are correct
A) Fabricate-to-order
B) Assemble-to-stock
C) Assemble-to-order
D) Manufacture-to-order
E) None of these choices are correct
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
51
The master production schedule deals exclusively with dependent demand items.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
52
The time-phased plan specifying how many and when the firm plans to build each end item is called the materials requirements plan (MRP).
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
53
This industry type includes industries such as foundries, rubber and plastics, specialty paper, chemicals, paint, drug, and food processors.
A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
54
A BOM file is also called which of the following?
A) Product tree
B) Stocking plan
C) Inventory usage record
D) Production parts plan
E) Time bucket schedule
A) Product tree
B) Stocking plan
C) Inventory usage record
D) Production parts plan
E) Time bucket schedule
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
55
Which of the following industry types have high expected benefits from the application of MRP?
A) Fabricate-to-stock
B) Fabricate-to-order
C) Assemble-to-stock
D) Continuous process
E) Service and repair parts
A) Fabricate-to-stock
B) Fabricate-to-order
C) Assemble-to-stock
D) Continuous process
E) Service and repair parts
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
56
In this industry type, a final assembly is made from standard options that the customer chooses.
A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
57
A super bill can specify that a fraction of a part, say 25 percent, is used.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
58
In this industry type, items are manufactured by machine to customer order. These are generally industrial orders.
A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
59
In this industry type, Iitems are fabricated or assembled completely to customer specification.
A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following is one of the main purposes of an MRP system?
A) Educate personnel in basic work rules.
B) Determine the amount of materials needed to produce each end item.
C) Stimulate the workforce.
D) Decrease labor requirements.
E) Increase inventory accuracy.
A) Educate personnel in basic work rules.
B) Determine the amount of materials needed to produce each end item.
C) Stimulate the workforce.
D) Decrease labor requirements.
E) Increase inventory accuracy.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
61
Which of the following is an input to the master production schedule?
A) Bill-of-materials (BOM) file
B) Inventory records file
C) Exception reports
D) Planned-order schedules
E) None of these choices are correct
A) Bill-of-materials (BOM) file
B) Inventory records file
C) Exception reports
D) Planned-order schedules
E) None of these choices are correct
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
62
In an MRP program, the program accesses the status segment of an inventory record according to specific periods called which of the following?
A) Cubed time units
B) Time buckets
C) BOM units
D) Time modules
E) Time lines
A) Cubed time units
B) Time buckets
C) BOM units
D) Time modules
E) Time lines
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
63
Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000, inventory on hand is 1,200, and planned receipts are 800?
A) 7,000
B) 4,200
C) 3,000
D) 2,000
E) 1,200
A) 7,000
B) 4,200
C) 3,000
D) 2,000
E) 1,200
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
64
Which of the following is considered a primary report in an MRP system?
A) Planned-order schedule
B) Peg report
C) Planning report
D) Inventory accuracy report
E) Aggregate production plan report
A) Planned-order schedule
B) Peg report
C) Planning report
D) Inventory accuracy report
E) Aggregate production plan report
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
65
Which of the following is an input file necessary to run an MRP system?
A) Exception report
B) Computer-aided-design files
C) Inventory records file
D) Personnel files
E) Planned-order schedule
A) Exception report
B) Computer-aided-design files
C) Inventory records file
D) Personnel files
E) Planned-order schedule
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
66
Which of the following is the planned-order release using an MRP program if the gross requirement is 670 and the inventory on hand is 600?
A) 670
B) 600
C) 530
D) 70
E) None of these choices are correct
A) 670
B) 600
C) 530
D) 70
E) None of these choices are correct
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
67
Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?
A) 1,000
B) 950
C) 500
D) 400
E) 350
A) 1,000
B) 950
C) 500
D) 400
E) 350
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following is considered a secondary report in an MRP system?
A) Planned-order schedule
B) Exceptions reports
C) Inventory record
D) Firm orders from known customers
E) Engineering change reports
A) Planned-order schedule
B) Exceptions reports
C) Inventory record
D) Firm orders from known customers
E) Engineering change reports
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following can be used for lot sizing in an MRP system?
A) Low-level coding
B) Time bucket size
C) Least unit cost
D) Inventory record file
E) Peg inventory
A) Low-level coding
B) Time bucket size
C) Least unit cost
D) Inventory record file
E) Peg inventory
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
70
Which of the following files allows us to retrace a material requirement upward in the product structure through each level, identifying each parent item that created the demand?
A) Planning bill-of-materials file
B) Modular bill-of-materials file
C) Super bill-of-materials file
D) Exception report file
E) Peg record file
A) Planning bill-of-materials file
B) Modular bill-of-materials file
C) Super bill-of-materials file
D) Exception report file
E) Peg record file
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
71
In a typical inventory status record, which of the following would you not expect to see?
A) Scrap allowance
B) Order quantity
C) Gross requirements
D) Planned-order releases
E) Lost items
A) Scrap allowance
B) Order quantity
C) Gross requirements
D) Planned-order releases
E) Lost items
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
72
One of the main purposes of an MRP system is which of the following?
A) Track inventory levels.
B) Create productive capacity.
C) Decrease layers of management.
D) Develop schedules specifying when each component should be ordered or produced.
E) Upgrade manufacturing's professionalism.
A) Track inventory levels.
B) Create productive capacity.
C) Decrease layers of management.
D) Develop schedules specifying when each component should be ordered or produced.
E) Upgrade manufacturing's professionalism.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
73
Which of the following is not a production activity report generated by MRP?
A) Exception report
B) Planning report
C) Performance control report
D) Planned-order schedules
E) Bill-of-materials report
A) Exception report
B) Planning report
C) Performance control report
D) Planned-order schedules
E) Bill-of-materials report
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
74
Which of the following is most closely related to the reason a firm might implement MRP?
A) So it can order the right parts
B) So it can order parts sufficient for immediate use
C) So it can ensure that parts to arrive prior to when they are needed
D) To ensure appropriate quality levels
E) To keep process costs between the LCL and the UCL
A) So it can order the right parts
B) So it can order parts sufficient for immediate use
C) So it can ensure that parts to arrive prior to when they are needed
D) To ensure appropriate quality levels
E) To keep process costs between the LCL and the UCL
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
75
MRP systems seek to achieve which of the following?
A) Minimize lot sizes.
B) Determine the number of dependent demand items needed.
C) Relieve capacity bottlenecks.
D) Provide a yardstick for future improvements.
E) Improve on JIT methods.
A) Minimize lot sizes.
B) Determine the number of dependent demand items needed.
C) Relieve capacity bottlenecks.
D) Provide a yardstick for future improvements.
E) Improve on JIT methods.
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
76
Which of the following is an input to the master production schedule?
A) Prototype products from product development
B) Aggregate component schedule
C) Peg reports
D) Exception reports
E) Forecasts of random demand from customers
A) Prototype products from product development
B) Aggregate component schedule
C) Peg reports
D) Exception reports
E) Forecasts of random demand from customers
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
77
We would expect to see which of the following in an MRP system's inventory status file?
A) End items produced
B) Late/early delivery records
C) Scrap parts
D) Labor efficiency
E) Computer errors
A) End items produced
B) Late/early delivery records
C) Scrap parts
D) Labor efficiency
E) Computer errors
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
78
Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?
A) 1,200
B) 1,300
C) 1,150
D) 2,450
E) None of these choices are correct
A) 1,200
B) 1,300
C) 1,150
D) 2,450
E) None of these choices are correct
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
79
Which of the following is considered a primary report in an MRP system?
A) Planning reports
B) Performance reports
C) Exception reports
D) Planned-order schedules
E) Cycle counting reports
A) Planning reports
B) Performance reports
C) Exception reports
D) Planned-order schedules
E) Cycle counting reports
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following is an input file necessary to run an MRP system?
A) Bill-of-materials (BOM) file
B) Quality management report
C) Exception reports
D) Planned-order schedules
E) Purchasing contracts
A) Bill-of-materials (BOM) file
B) Quality management report
C) Exception reports
D) Planned-order schedules
E) Purchasing contracts
Unlock Deck
Unlock for access to all 91 flashcards in this deck.
Unlock Deck
k this deck