Deck 14: Operations Producing Goods and Services

Full screen (f)
exit full mode
Question
World-class organizations can improve performance along multiple dimensions without making extensive performance tradeoffs or sacrifices.
Use Space or
up arrow
down arrow
to flip the card.
Question
Processes that can produce a range of products are said to have

A) economies of scope.
B) economies of scale.
C) flexible cells.
D) work centers.
Question
Companies now use strategies that are lean,flexible,or adaptive; wait for customers to push products to the market.
Question
One type of flexible manufacturing is machine flexibility.
Question
Offshoring is a term that means moving an activity is relocated to another country.
Question
Most processes are basically organized the same.
Question
Processes that can produce a range of products are said to have economies of scope.
Question
Production operations create form utility.
Question
Assemble-to-order methods tend to be more

A) quick.
B) intensive.
C) complex.
D) critical.
Question
Packaging is very important in the manufacturing operation.
Question
Resource requirements planning (RRP)is a long-run,macro-level planning tool.
Question
Ship to order is another version one of four manufacturing methods.
Question
Routing flexibility is a term used in connection with how spare parts move through the supply chain.
Question
Form utility drives the need for

A) supply chain capabilities only.
B) time utility and place utility.
C) place utility only.
D) supply chain capabilities,time utility,and place utility.
Question
The "bullwhip" effect occurs when forecast errors are magnified and demand variability increases as orders move upstream from retailers to distributors to producers.
Question
Delayed differentiation is one hybrid strategy in which a common product platform is built to stock.It is later differentiated by assigning to it certain customer-specific features,only after demand is realized.
Question
Materials requirement plan (MRP)is a long-range materials plan that converts information regarding end-items in the MPS into a set of time-phased component and part requirements.
Question
Which is not a major challenge for many established manufacturers?

A) competition
B) customer requirements
C) off shore sourcing
D) pressure for efficiency
Question
A work center and a manufacturing cell are the same.
Question
Capacity planning and materials planning are the same.
Question
What is offshoring? How does it affect manufacturing and logistics? What are the advantages and disadvantages?
Question
Lean production relies on

A) pull systems.
B) push systems.
C) the Toyota production system.
D) offshoring.
Question
There are four assembly processes.Name all four,and pick two to discuss in detail.
Question
Define and discuss machine flexibility and routing flexibility.
Question
Project layout is

A) a work center.
B) a fixed location layout where the product remains in place for the duration of production stability.
C) a product-focused layout in which machines and workers are arranged according to the progressive sequence of operations.
D) a process-focused layout that groups together similar equipment or functions.
Question
Discuss the role of production operations in supply chain management (SCM).
Question
Resource requirements planning (RRP)

A) is a long-run,macro-level planning tool.
B) checks the feasibility of the master production schedule.
C) checks the feasibility of the materials requirement plan.
D) is a long-range materials plan that translates annual business plans.
Question
Discuss the role of packaging from a logistics perspective.
Question
Explain one of the following in detail: workcenter,manufacturing cell,assembly line or continuous process facilities.
Question
What is the "Bullwhip Effect," and how does it affect manufacturing?
Question
Discuss the three planning timeframes,and the various tools associated with them.
Question
Capacity is

A) determined by lean manufacturing.
B) the maximum amount of work that an organization is capable of completing in a given period of time.
C) determined by raw materials flows.
D) involves both short and long range planning.
Question
Discuss the challenges facing production managers.
Question
Packaging is

A) critical to logistics.
B) critical to manufacturing.
C) critical to product differential.
D) a factor in offsourcing.
Question
A push-based strategy works well for supply chains that focus on

A) lean production.
B) the anticipation of demand or without knowledge of customer orders.
C) work centers and offshore sourcing.
D) the immediate delivery of off-the-shelf,low-cost,standardized goods.
Question
Which is not a manufacturing method?

A) make to stock
B) delayed differentiation
C) build to order
D) assemble to order
Question
Which of the following is not a reactive capability strategy?

A) machine flexibility
B) routing flexibility
C) reactive manufacturing.
D) offshoring
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/37
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 14: Operations Producing Goods and Services
1
World-class organizations can improve performance along multiple dimensions without making extensive performance tradeoffs or sacrifices.
True
2
Processes that can produce a range of products are said to have

A) economies of scope.
B) economies of scale.
C) flexible cells.
D) work centers.
A
3
Companies now use strategies that are lean,flexible,or adaptive; wait for customers to push products to the market.
False
4
One type of flexible manufacturing is machine flexibility.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
5
Offshoring is a term that means moving an activity is relocated to another country.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
6
Most processes are basically organized the same.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
7
Processes that can produce a range of products are said to have economies of scope.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
8
Production operations create form utility.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
9
Assemble-to-order methods tend to be more

A) quick.
B) intensive.
C) complex.
D) critical.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
10
Packaging is very important in the manufacturing operation.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
11
Resource requirements planning (RRP)is a long-run,macro-level planning tool.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
12
Ship to order is another version one of four manufacturing methods.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
13
Routing flexibility is a term used in connection with how spare parts move through the supply chain.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
14
Form utility drives the need for

A) supply chain capabilities only.
B) time utility and place utility.
C) place utility only.
D) supply chain capabilities,time utility,and place utility.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
15
The "bullwhip" effect occurs when forecast errors are magnified and demand variability increases as orders move upstream from retailers to distributors to producers.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
16
Delayed differentiation is one hybrid strategy in which a common product platform is built to stock.It is later differentiated by assigning to it certain customer-specific features,only after demand is realized.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
17
Materials requirement plan (MRP)is a long-range materials plan that converts information regarding end-items in the MPS into a set of time-phased component and part requirements.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
18
Which is not a major challenge for many established manufacturers?

A) competition
B) customer requirements
C) off shore sourcing
D) pressure for efficiency
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
19
A work center and a manufacturing cell are the same.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
20
Capacity planning and materials planning are the same.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
21
What is offshoring? How does it affect manufacturing and logistics? What are the advantages and disadvantages?
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
22
Lean production relies on

A) pull systems.
B) push systems.
C) the Toyota production system.
D) offshoring.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
23
There are four assembly processes.Name all four,and pick two to discuss in detail.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
24
Define and discuss machine flexibility and routing flexibility.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
25
Project layout is

A) a work center.
B) a fixed location layout where the product remains in place for the duration of production stability.
C) a product-focused layout in which machines and workers are arranged according to the progressive sequence of operations.
D) a process-focused layout that groups together similar equipment or functions.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
26
Discuss the role of production operations in supply chain management (SCM).
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
27
Resource requirements planning (RRP)

A) is a long-run,macro-level planning tool.
B) checks the feasibility of the master production schedule.
C) checks the feasibility of the materials requirement plan.
D) is a long-range materials plan that translates annual business plans.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
28
Discuss the role of packaging from a logistics perspective.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
29
Explain one of the following in detail: workcenter,manufacturing cell,assembly line or continuous process facilities.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
30
What is the "Bullwhip Effect," and how does it affect manufacturing?
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
31
Discuss the three planning timeframes,and the various tools associated with them.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
32
Capacity is

A) determined by lean manufacturing.
B) the maximum amount of work that an organization is capable of completing in a given period of time.
C) determined by raw materials flows.
D) involves both short and long range planning.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
33
Discuss the challenges facing production managers.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
34
Packaging is

A) critical to logistics.
B) critical to manufacturing.
C) critical to product differential.
D) a factor in offsourcing.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
35
A push-based strategy works well for supply chains that focus on

A) lean production.
B) the anticipation of demand or without knowledge of customer orders.
C) work centers and offshore sourcing.
D) the immediate delivery of off-the-shelf,low-cost,standardized goods.
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
36
Which is not a manufacturing method?

A) make to stock
B) delayed differentiation
C) build to order
D) assemble to order
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following is not a reactive capability strategy?

A) machine flexibility
B) routing flexibility
C) reactive manufacturing.
D) offshoring
Unlock Deck
Unlock for access to all 37 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 37 flashcards in this deck.