Deck 3: Organization: Structure and Culture

Full screen (f)
exit full mode
Question
The matrix form of project management structure is a good choice when resource usage needs to be optimized by having individuals work on multiple projects while still performing functional duties.
Use Space or
up arrow
down arrow
to flip the card.
Question
The functional project team is usually physically separated from the parent organization and given the primary directive of accomplishing the objectives of the project.
Question
In a balanced matrix form of project management, the project manager is responsible for defining what needs to be accomplished while the functional managers are concerned with how it will be accomplished.
Question
When determining the most appropriate project management structure, considerations need to be made at the organizational level and at the project level.
Question
When three forms of the matrix project management structure are considered, all share the same advantages and disadvantages and at an equal level.
Question
The projectized form of project management structure is a good choice when speed of completion is important and the project needs to be implemented without directly disrupting ongoing operations.
Question
Within a matrix project management structure, the extent to which the project manager has direct authority over project participants depends on whether the matrix is weak, balanced, or strong.
Question
One of the major disadvantages of the projectized form of project management structure is that it tends to be more expensive than other forms of organization.
Question
While organization culture is important to the overall function of an organization, it has minor influence on its project management.
Question
The projectized form of project management structure is commonly used when one functional area plays a dominant role in completing the project or has a dominant interest in the success of the project.
Question
A disadvantage of using the functional form of project management structure is that projects generally take longer to complete.
Question
One advantage of a matrix project management structure is that it is fast and easy to implement.
Question
There are often considerable differences in how projects are managed within certain firms, even when similar project management structures are being used.
Question
A matrix project management structure is a hybrid organizational form in which a horizontal project management structure is "overlaid" on the normal functional hierarchy.
Question
In the projectized form of project management structure, there is limited technological expertise when compared to the functional or matrix organization.
Question
As discussed in the text, the three forms of matrix project management are weak, mixed, and strong.
Question
The matrix form of project management is notable for the tension it creates between functional managers and project managers who both bring critical expertise and perspectives to the project.
Question
Member identity refers to the degree to which work activities are organized around groups rather than individuals.
Question
Generally, the more autonomy and authority the project manager and the project team need to be successful, the more appropriate to implement either a dedicated project team or a strong project management structure.
Question
Control is the cultural characteristic that refers to the degree to which management decisions take into account the effect of outcomes on people within the organization.
Question
At the project level, which of the following is a factor that should influence the choice of project management structure?

A) The size of the project
B) The novelty of the project
C) Budget and time constraints
D) The strategic importance of the project
E) All of these are factors that should influence the choice of project management structure
Question
A project team that operates with a full-time project manager as a separate unit from the rest of the organization is structured using ________ organization.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Question
The arrangement that manages projects within the existing organizational structure is __________ organization.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Question
Organizational culture refers to a system of shared norms, beliefs, values, and assumptions which bind people together.
Question
Organization structures have a connection to projects. Which of the following is NOT true of project management structures?

A) They provide a framework for launching and implementing projects.
B) They appropriately balance the needs of both the parent organization and the project.
C) In selecting a management structure, the culture of the organization is not a huge consideration.
D) The project itself should be considered when determining which structure is best.
E) They help determine who has most authority regarding managing the project.
Question
Which of the following combinations represents the extremes of project organization?

A) Strong matrix and balanced matrix
B) Functional and projectized
C) Projectized and balanced matrix
D) Projectized and strong matrix
E) Strong matrix and functional
Question
Unit integration is the cultural characteristic that refers to the degree to which units within the organization are encouraged to operate in a coordinated or independent manner.
Question
Which are the three different matrix systems discussed in the text?

A) Functional, Weak, Strong
B) Balanced, Functional, Projectized
C) Weak, Strong, Balanced
D) Neutral, Weak, Strong
E) Functional, Neutral, Projectized
Question
Which of the following is a disadvantage of a projectized organization?

A) It is expensive
B) Longer project duration
C) Poor integration
D) High complexity
E) Lack of focus on the project
Question
Which of the following is a disadvantage of a functional project management organization?

A) Lack of motivation of project team members
B) Longer project duration
C) Lack of focus on the project
D) Poor integration
E) All of these are disadvantages of functional project management organization
Question
Which of the following is NOT true regarding organizing projects within a matrix arrangement?

A) Its flexibility supports a strong project focus that helps alleviate stress among project team members.
B) It is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.
C) There are usually two chains of command.
D) Provides a dual focus between functional / technical expertise and project requirements that is missing in either the project team or the functional approach.
E) It is a hybrid form of organization that combines characteristics of both dedicated project teams and functional organization.
Question
A project manager is considering how to structure a project team that will not directly disrupt ongoing operations. The project needs to be done quickly and a high level of motivation will be needed in order to do that. For this situation, the ______ organization would be the best choice.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Question
There are strong connections among project management structure, organizational culture, and project success.
Question
Which of the following is NOT a disadvantage of organizing projects within a matrix arrangement?

A) Dysfunctional conflict between functional managers and project managers.
B) Expensive.
C) Infighting.
D) Stressful.
E) Longer project duration.
Question
Which of the following is an advantage of a functional project management organization?

A) Maximum flexibility in the use of staff
B) Good integration across functional units
C) Shorter project duration
D) Strong motivation of project team members
E) Longer project duration
Question
A young professional man is working on a project involving the upgrading of a management information system. The project is being managed by the information systems department with the coordination of other departments occurring through normal channels. This professional is working in a _________ organization.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Question
All of the following are organizational considerations when determining the right project management structure EXCEPT

A) how important project management is to the success of the organization.
B) what percentage of core work involves projects.
C) resource availability.
D) assess current practices and determine any changes that are needed to more effectively manage projects.
E) budget constraints.
Question
Certain aspects of the culture of an organization support successful project management while other aspects deter or interfere with effective management.
Question
_________ organization is a hybrid form in which a horizontal project management structure is "overlaid" in the normal functional hierarchy.

A) Functional
B) Matrix
C) Project
D) Balanced
E) Neutral
Question
A technology firm has assigned a project manager for each of the five new-product teams. The managers, as well as the project team members, work on the projects on a full-time basis. The structure being used is ________ organization.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Question
Which of the following cultural characteristic relates to the degree to which rules, policies, and direct supervision are used to oversee and control employee behavior?

A) Member identity
B) Team Emphasis
C) Managerial focus
D) Unit integration
E) Control
Question
The approach to project management that uses the existing hierarchy of the organization to manage projects is ___________ organization and it uses no overlaid structure.

A) functional
B) projectized
C) dedicated project team
D) balanced matrix
E) weak matrix
Question
Which of the following cultural characteristics relates to the degree to which management focuses on outcomes rather than on techniques and processes used to achieve those outcomes?

A) Risk tolerance
B) Reward criteria
C) Conflict tolerance
D) Means versus end orientation
E) Open-systems focus
Question
Firms where projects are the dominant form of business and the entire organization is designed to support project teams are usually structured as a(n) _________ organization.

A) projectized
B) dedicated project team
C) weak matrix
D) strong matrix
E) functional
Question
All of the following are functions culture plays in an organization EXCEPT

A) it provides a sense of identity.
B) it helps legitimize the management system.
C) it replaces the need for a project selection process.
D) it helps create social order.
E) it clarifies and reinforces standards of behavior.
Question
Who is responsible for determining how tasks will be done in a weak matrix project management structure?

A) The functional manager
B) The project manager
C) Both the functional manager and the project manager are responsible
D) There is no rule established for who takes responsibility
E) This is negotiated
Question
No radical alteration in the design or operation of the parent organization is a major advantage of __________ organization.

A) projectized
B) dedicated project team
C) weak matrix
D) strong matrix
E) functional
Question
Which organization's culture is NOT a culture a project manager has to be able to operate in or interact with?

A) The culture of their parent organization
B) The culture of government and regulatory agencies
C) The culture of vendors and subcontractors
D) The culture of the project's customer or client
E) All of these are cultures a project manager has to be able to operate in or interact with
Question
Factors in identifying cultural characteristics include all the following EXCEPT

A) Norms.
B) Customs.
C) Values.
D) Attitude.
E) All of these are factors in identifying cultural characteristics.
Question
A high level of motivation and the tendency for projects to get done more quickly are benefits of using the ________ organizational approach to project management.

A) dedicated project team
B) weak matrix
C) strong matrix
D) functional
E) projectized
Question
From the list below, which is NOT a primary characteristic of organizational culture?

A) Control
B) Team emphasis
C) Profitability
D) Conflict tolerance
E) Risk tolerance
Question
Which structure would be most appropriate for developing a new, highly innovative product that has strict time constraints?

A) Functional organization
B) Balanced matrix
C) Dedicated project team
D) Strong matrix
E) Weak matrix
Question
Two of the major disadvantages of the ________ organizational approach are that projects may lack focus and it can take longer to complete projects.

A) projectized
B) strong matrix
C) functional
D) dedicated project team
E) weak matrix
Question
The personality of an organization is a simple explanation of ___________.

A) Organizational structure
B) Organizational culture
C) Organizational governance
D) Organizational identity
E) All of these
Question
How does someone learn more about an organization's culture?

A) Read about the organization
B) Interpret stories about the organization
C) Observe how people interact within the organization
D) Study the physical characteristics of the organization
E) All of these are examples of how someone can learn more about an organization's culture
Question
Which of the following cultural characteristics relates to the degree to which employees identify with the organization as a whole rather than with their type of job or field of professional expertise?

A) Member identity
B) Team emphasis
C) Managerial focus
D) Unit integration
E) Control
Question
High project costs and difficult post-project transition are two evident weaknesses of a(n) __________ organization.

A) dedicated project team
B) weak matrix
C) strong matrix
D) functional
E) projectized
Question
Which of the following cultural characteristics relates to the degree to which work activities are organized around groups rather than individuals?

A) Member identity
B) Team emphasis
C) Managerial focus
D) Unit integration
E) Control
Question
In which of the following is the balance of authority strongly in favor of the functional managers?

A) Weak matrix
B) Balanced matrix
C) Strong matrix
D) Matrix
E) Neutral matrix
Question
Which of the following cultural characteristics relates to the degree to which groups within the organization are encouraged to operate in a coordinated or independent manner?

A) Member identity
B) Team emphasis
C) Managerial focus
D) Unit integration
E) Control
Question
The ________ structure is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.

A) matrix
B) unified
C) functional
D) projectized
E) dedicated project team
Question
Organization ________ refers to a system of shared norms, beliefs, values, and assumptions which bind people together, thereby creating shared meanings.

A) governance
B) personality
C) values
D) culture
E) mission
Question
The ________ matrix form of project organization is likely to enhance project integration, diminish internal power struggles, and ultimately improve control of project activities and costs.

A) weak
B) unified
C) strong
D) projectized
E) balanced
Question
High levels of stress and dysfunctional conflict are disadvantages of a(n) _________ organization.

A) matrix
B) unified
C) functional
D) projectized
E) dedicated project team
Question
Research suggests that there is a strong connection between project management structure, organizational ________, and project success.

A) governance
B) personality
C) culture
D) values
E) mission
Question
Growing pains can arise from implementing a matrix organization due to

A) influence from other organizations.
B) the long lead time of implementation.
C) cost and supply chain factors.
D) types of projects an organization is attempting to accomplish.
E) conflicts and tensions that arise.
Question
Which of the below is a not considered a strength for a matrix organization?

A) Strong project focus.
B) Flexibility.
C) Easier post-project transition.
D) Streamlined project selection.
E) Better resource sharing and utilization.
Question
________ project teams should be used for urgent projects in which the nature of the work requires people working steadily from beginning to end.

A) Weak
B) Dedicated
C) Strong
D) Projectized
E) Balanced
Question
The ________ matrix form of project organization is likely to improve technical quality as well as provide a better system for managing conflict across projects because the functional manager assigns personnel to different projects.

A) weak
B) unified
C) strong
D) projectized
E) balanced
Question
A matrix in which the balance of authority is strongly on the side of the project manager is described as __________.

A) weak
B) strong
C) functional
D) projectized
E) dedicated project team
Question
The cultural characteristic that refers to the degree to which employees are encouraged to be aggressive, innovative, and risk seeking is known as _____________.

A) open-systems focus
B) risk tolerance
C) means versus ends orientation
D) team emphasis
E) control
Question
The ________ matrix form of project organization can achieve better equilibrium between technical and project requirements, but it is a very delicate system to create and manage.

A) weak
B) unified
C) strong
D) projectized
E) balanced
Question
A matrix in which the balance of authority is strongly on the side of the functional manager is described as _________.

A) weak
B) unified
C) strong
D) projectized
E) balanced
Question
The cultural characteristic that refers to the degree to which employees are encouraged to air conflicts and criticisms openly is known as ___________.

A) open-systems focus
B) team emphasis
C) conflict tolerance
D) unit integration
E) reward criteria
Question
When most of the project work can be done within a specified department and any coordination with other departments can be done easily through normal management channels, ___________ organization is most appropriate.

A) functional
B) weak matrix
C) balanced matrix
D) strong matrix
E) projectized
Question
The cultural characteristic that refers to the degree to which the organization monitors and responds to changes in the external environment is known as ___________.

A) open-systems focus
B) team emphasis
C) conflict tolerance
D) unit integration
E) reward criteria
Question
The cultural characteristic that refers to the degree to which rewards such as promotion and salary increases are allocated according to employee performance rather than seniority, favoritism, or other nonperformance factors is known as _____________.

A) member identity
B) team emphasis
C) management focus
D) unit integration
E) reward criteria
Question
Conflict tolerance, risk tolerance, reward criteria and unit integration are all examples of cultural __________.

A) attributes
B) characteristics
C) dimensions
D) fundamentals
E) considerations
Question
In a(n) ________ system, there are usually two chains of command, one along functional lines and the other along project lines.

A) dedicated project team
B) matrix
C) unified
D) functional
E) projectized
Question
The more autonomy and authority the project manager and project team need to be successful, the more appropriate a dedicated project team or a(n) ________ matrix structure is to manage the project.

A) weak
B) dedicated
C) strong
D) projectized
E) balanced
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/102
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Organization: Structure and Culture
1
The matrix form of project management structure is a good choice when resource usage needs to be optimized by having individuals work on multiple projects while still performing functional duties.
True
2
The functional project team is usually physically separated from the parent organization and given the primary directive of accomplishing the objectives of the project.
False
3
In a balanced matrix form of project management, the project manager is responsible for defining what needs to be accomplished while the functional managers are concerned with how it will be accomplished.
True
4
When determining the most appropriate project management structure, considerations need to be made at the organizational level and at the project level.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
5
When three forms of the matrix project management structure are considered, all share the same advantages and disadvantages and at an equal level.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
6
The projectized form of project management structure is a good choice when speed of completion is important and the project needs to be implemented without directly disrupting ongoing operations.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
7
Within a matrix project management structure, the extent to which the project manager has direct authority over project participants depends on whether the matrix is weak, balanced, or strong.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
8
One of the major disadvantages of the projectized form of project management structure is that it tends to be more expensive than other forms of organization.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
9
While organization culture is important to the overall function of an organization, it has minor influence on its project management.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
10
The projectized form of project management structure is commonly used when one functional area plays a dominant role in completing the project or has a dominant interest in the success of the project.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
11
A disadvantage of using the functional form of project management structure is that projects generally take longer to complete.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
12
One advantage of a matrix project management structure is that it is fast and easy to implement.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
13
There are often considerable differences in how projects are managed within certain firms, even when similar project management structures are being used.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
14
A matrix project management structure is a hybrid organizational form in which a horizontal project management structure is "overlaid" on the normal functional hierarchy.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
15
In the projectized form of project management structure, there is limited technological expertise when compared to the functional or matrix organization.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
16
As discussed in the text, the three forms of matrix project management are weak, mixed, and strong.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
17
The matrix form of project management is notable for the tension it creates between functional managers and project managers who both bring critical expertise and perspectives to the project.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
18
Member identity refers to the degree to which work activities are organized around groups rather than individuals.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
19
Generally, the more autonomy and authority the project manager and the project team need to be successful, the more appropriate to implement either a dedicated project team or a strong project management structure.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
20
Control is the cultural characteristic that refers to the degree to which management decisions take into account the effect of outcomes on people within the organization.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
21
At the project level, which of the following is a factor that should influence the choice of project management structure?

A) The size of the project
B) The novelty of the project
C) Budget and time constraints
D) The strategic importance of the project
E) All of these are factors that should influence the choice of project management structure
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
22
A project team that operates with a full-time project manager as a separate unit from the rest of the organization is structured using ________ organization.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
23
The arrangement that manages projects within the existing organizational structure is __________ organization.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
24
Organizational culture refers to a system of shared norms, beliefs, values, and assumptions which bind people together.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
25
Organization structures have a connection to projects. Which of the following is NOT true of project management structures?

A) They provide a framework for launching and implementing projects.
B) They appropriately balance the needs of both the parent organization and the project.
C) In selecting a management structure, the culture of the organization is not a huge consideration.
D) The project itself should be considered when determining which structure is best.
E) They help determine who has most authority regarding managing the project.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following combinations represents the extremes of project organization?

A) Strong matrix and balanced matrix
B) Functional and projectized
C) Projectized and balanced matrix
D) Projectized and strong matrix
E) Strong matrix and functional
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
27
Unit integration is the cultural characteristic that refers to the degree to which units within the organization are encouraged to operate in a coordinated or independent manner.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
28
Which are the three different matrix systems discussed in the text?

A) Functional, Weak, Strong
B) Balanced, Functional, Projectized
C) Weak, Strong, Balanced
D) Neutral, Weak, Strong
E) Functional, Neutral, Projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is a disadvantage of a projectized organization?

A) It is expensive
B) Longer project duration
C) Poor integration
D) High complexity
E) Lack of focus on the project
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following is a disadvantage of a functional project management organization?

A) Lack of motivation of project team members
B) Longer project duration
C) Lack of focus on the project
D) Poor integration
E) All of these are disadvantages of functional project management organization
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is NOT true regarding organizing projects within a matrix arrangement?

A) Its flexibility supports a strong project focus that helps alleviate stress among project team members.
B) It is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.
C) There are usually two chains of command.
D) Provides a dual focus between functional / technical expertise and project requirements that is missing in either the project team or the functional approach.
E) It is a hybrid form of organization that combines characteristics of both dedicated project teams and functional organization.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
32
A project manager is considering how to structure a project team that will not directly disrupt ongoing operations. The project needs to be done quickly and a high level of motivation will be needed in order to do that. For this situation, the ______ organization would be the best choice.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
33
There are strong connections among project management structure, organizational culture, and project success.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following is NOT a disadvantage of organizing projects within a matrix arrangement?

A) Dysfunctional conflict between functional managers and project managers.
B) Expensive.
C) Infighting.
D) Stressful.
E) Longer project duration.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following is an advantage of a functional project management organization?

A) Maximum flexibility in the use of staff
B) Good integration across functional units
C) Shorter project duration
D) Strong motivation of project team members
E) Longer project duration
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
36
A young professional man is working on a project involving the upgrading of a management information system. The project is being managed by the information systems department with the coordination of other departments occurring through normal channels. This professional is working in a _________ organization.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
37
All of the following are organizational considerations when determining the right project management structure EXCEPT

A) how important project management is to the success of the organization.
B) what percentage of core work involves projects.
C) resource availability.
D) assess current practices and determine any changes that are needed to more effectively manage projects.
E) budget constraints.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
38
Certain aspects of the culture of an organization support successful project management while other aspects deter or interfere with effective management.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
39
_________ organization is a hybrid form in which a horizontal project management structure is "overlaid" in the normal functional hierarchy.

A) Functional
B) Matrix
C) Project
D) Balanced
E) Neutral
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
40
A technology firm has assigned a project manager for each of the five new-product teams. The managers, as well as the project team members, work on the projects on a full-time basis. The structure being used is ________ organization.

A) functional
B) balanced matrix
C) weak matrix
D) strong matrix
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following cultural characteristic relates to the degree to which rules, policies, and direct supervision are used to oversee and control employee behavior?

A) Member identity
B) Team Emphasis
C) Managerial focus
D) Unit integration
E) Control
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
42
The approach to project management that uses the existing hierarchy of the organization to manage projects is ___________ organization and it uses no overlaid structure.

A) functional
B) projectized
C) dedicated project team
D) balanced matrix
E) weak matrix
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following cultural characteristics relates to the degree to which management focuses on outcomes rather than on techniques and processes used to achieve those outcomes?

A) Risk tolerance
B) Reward criteria
C) Conflict tolerance
D) Means versus end orientation
E) Open-systems focus
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
44
Firms where projects are the dominant form of business and the entire organization is designed to support project teams are usually structured as a(n) _________ organization.

A) projectized
B) dedicated project team
C) weak matrix
D) strong matrix
E) functional
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
45
All of the following are functions culture plays in an organization EXCEPT

A) it provides a sense of identity.
B) it helps legitimize the management system.
C) it replaces the need for a project selection process.
D) it helps create social order.
E) it clarifies and reinforces standards of behavior.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
46
Who is responsible for determining how tasks will be done in a weak matrix project management structure?

A) The functional manager
B) The project manager
C) Both the functional manager and the project manager are responsible
D) There is no rule established for who takes responsibility
E) This is negotiated
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
47
No radical alteration in the design or operation of the parent organization is a major advantage of __________ organization.

A) projectized
B) dedicated project team
C) weak matrix
D) strong matrix
E) functional
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
48
Which organization's culture is NOT a culture a project manager has to be able to operate in or interact with?

A) The culture of their parent organization
B) The culture of government and regulatory agencies
C) The culture of vendors and subcontractors
D) The culture of the project's customer or client
E) All of these are cultures a project manager has to be able to operate in or interact with
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
49
Factors in identifying cultural characteristics include all the following EXCEPT

A) Norms.
B) Customs.
C) Values.
D) Attitude.
E) All of these are factors in identifying cultural characteristics.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
50
A high level of motivation and the tendency for projects to get done more quickly are benefits of using the ________ organizational approach to project management.

A) dedicated project team
B) weak matrix
C) strong matrix
D) functional
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
51
From the list below, which is NOT a primary characteristic of organizational culture?

A) Control
B) Team emphasis
C) Profitability
D) Conflict tolerance
E) Risk tolerance
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
52
Which structure would be most appropriate for developing a new, highly innovative product that has strict time constraints?

A) Functional organization
B) Balanced matrix
C) Dedicated project team
D) Strong matrix
E) Weak matrix
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
53
Two of the major disadvantages of the ________ organizational approach are that projects may lack focus and it can take longer to complete projects.

A) projectized
B) strong matrix
C) functional
D) dedicated project team
E) weak matrix
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
54
The personality of an organization is a simple explanation of ___________.

A) Organizational structure
B) Organizational culture
C) Organizational governance
D) Organizational identity
E) All of these
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
55
How does someone learn more about an organization's culture?

A) Read about the organization
B) Interpret stories about the organization
C) Observe how people interact within the organization
D) Study the physical characteristics of the organization
E) All of these are examples of how someone can learn more about an organization's culture
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following cultural characteristics relates to the degree to which employees identify with the organization as a whole rather than with their type of job or field of professional expertise?

A) Member identity
B) Team emphasis
C) Managerial focus
D) Unit integration
E) Control
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
57
High project costs and difficult post-project transition are two evident weaknesses of a(n) __________ organization.

A) dedicated project team
B) weak matrix
C) strong matrix
D) functional
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following cultural characteristics relates to the degree to which work activities are organized around groups rather than individuals?

A) Member identity
B) Team emphasis
C) Managerial focus
D) Unit integration
E) Control
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
59
In which of the following is the balance of authority strongly in favor of the functional managers?

A) Weak matrix
B) Balanced matrix
C) Strong matrix
D) Matrix
E) Neutral matrix
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following cultural characteristics relates to the degree to which groups within the organization are encouraged to operate in a coordinated or independent manner?

A) Member identity
B) Team emphasis
C) Managerial focus
D) Unit integration
E) Control
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
61
The ________ structure is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.

A) matrix
B) unified
C) functional
D) projectized
E) dedicated project team
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
62
Organization ________ refers to a system of shared norms, beliefs, values, and assumptions which bind people together, thereby creating shared meanings.

A) governance
B) personality
C) values
D) culture
E) mission
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
63
The ________ matrix form of project organization is likely to enhance project integration, diminish internal power struggles, and ultimately improve control of project activities and costs.

A) weak
B) unified
C) strong
D) projectized
E) balanced
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
64
High levels of stress and dysfunctional conflict are disadvantages of a(n) _________ organization.

A) matrix
B) unified
C) functional
D) projectized
E) dedicated project team
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
65
Research suggests that there is a strong connection between project management structure, organizational ________, and project success.

A) governance
B) personality
C) culture
D) values
E) mission
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
66
Growing pains can arise from implementing a matrix organization due to

A) influence from other organizations.
B) the long lead time of implementation.
C) cost and supply chain factors.
D) types of projects an organization is attempting to accomplish.
E) conflicts and tensions that arise.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
67
Which of the below is a not considered a strength for a matrix organization?

A) Strong project focus.
B) Flexibility.
C) Easier post-project transition.
D) Streamlined project selection.
E) Better resource sharing and utilization.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
68
________ project teams should be used for urgent projects in which the nature of the work requires people working steadily from beginning to end.

A) Weak
B) Dedicated
C) Strong
D) Projectized
E) Balanced
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
69
The ________ matrix form of project organization is likely to improve technical quality as well as provide a better system for managing conflict across projects because the functional manager assigns personnel to different projects.

A) weak
B) unified
C) strong
D) projectized
E) balanced
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
70
A matrix in which the balance of authority is strongly on the side of the project manager is described as __________.

A) weak
B) strong
C) functional
D) projectized
E) dedicated project team
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
71
The cultural characteristic that refers to the degree to which employees are encouraged to be aggressive, innovative, and risk seeking is known as _____________.

A) open-systems focus
B) risk tolerance
C) means versus ends orientation
D) team emphasis
E) control
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
72
The ________ matrix form of project organization can achieve better equilibrium between technical and project requirements, but it is a very delicate system to create and manage.

A) weak
B) unified
C) strong
D) projectized
E) balanced
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
73
A matrix in which the balance of authority is strongly on the side of the functional manager is described as _________.

A) weak
B) unified
C) strong
D) projectized
E) balanced
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
74
The cultural characteristic that refers to the degree to which employees are encouraged to air conflicts and criticisms openly is known as ___________.

A) open-systems focus
B) team emphasis
C) conflict tolerance
D) unit integration
E) reward criteria
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
75
When most of the project work can be done within a specified department and any coordination with other departments can be done easily through normal management channels, ___________ organization is most appropriate.

A) functional
B) weak matrix
C) balanced matrix
D) strong matrix
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
76
The cultural characteristic that refers to the degree to which the organization monitors and responds to changes in the external environment is known as ___________.

A) open-systems focus
B) team emphasis
C) conflict tolerance
D) unit integration
E) reward criteria
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
77
The cultural characteristic that refers to the degree to which rewards such as promotion and salary increases are allocated according to employee performance rather than seniority, favoritism, or other nonperformance factors is known as _____________.

A) member identity
B) team emphasis
C) management focus
D) unit integration
E) reward criteria
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
78
Conflict tolerance, risk tolerance, reward criteria and unit integration are all examples of cultural __________.

A) attributes
B) characteristics
C) dimensions
D) fundamentals
E) considerations
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
79
In a(n) ________ system, there are usually two chains of command, one along functional lines and the other along project lines.

A) dedicated project team
B) matrix
C) unified
D) functional
E) projectized
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
80
The more autonomy and authority the project manager and project team need to be successful, the more appropriate a dedicated project team or a(n) ________ matrix structure is to manage the project.

A) weak
B) dedicated
C) strong
D) projectized
E) balanced