Deck 10: Software Engineering

Full screen (f)
exit full mode
Question
One phase in system development is _______.

A) analysis
B) application
C) designing
D) collecting
Use Space or
up arrow
down arrow
to flip the card.
Question
Testing a software system can involve _______ testing.

A) black-box
B) glass-box
C) neither black-box nor glass-box
D) both black-box and glass-box
Question
In the system development process, writing the program is part of the _______ phase.

A) analysis
B) design
C) implementation
D) testing
Question
Defining the users, requirements, and methods is part of the _______ phase.

A) analysis
B) design
C) implementation
D) testing
Question
_______ is the breaking up of a large project into smaller parts.

A) Coupling
B) Incrementing
C) Obsolescence
D) Modularization
Question
_______ is a measure of how tightly two modules are bound to each other.

A) Modularity
B) Coupling
C) Interoperability
D) Cohesion
Question
In the system development process, structure charts are tools used in the _______ phase.

A) analysis
B) design
C) implementation
D) testing
Question
_________between modules in a software system must be maximized.

A) Coupling
B) Cohesion
C) Neither coupling nor cohesion
D) Both coupling and cohesion
Question
_________between modules in a software system must be minimized.

A) Coupling
B) Cohesion
C) Neither coupling nor cohesion
D) Both coupling and cohesion
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/9
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Software Engineering
1
One phase in system development is _______.

A) analysis
B) application
C) designing
D) collecting
A
2
Testing a software system can involve _______ testing.

A) black-box
B) glass-box
C) neither black-box nor glass-box
D) both black-box and glass-box
D
3
In the system development process, writing the program is part of the _______ phase.

A) analysis
B) design
C) implementation
D) testing
C
4
Defining the users, requirements, and methods is part of the _______ phase.

A) analysis
B) design
C) implementation
D) testing
Unlock Deck
Unlock for access to all 9 flashcards in this deck.
Unlock Deck
k this deck
5
_______ is the breaking up of a large project into smaller parts.

A) Coupling
B) Incrementing
C) Obsolescence
D) Modularization
Unlock Deck
Unlock for access to all 9 flashcards in this deck.
Unlock Deck
k this deck
6
_______ is a measure of how tightly two modules are bound to each other.

A) Modularity
B) Coupling
C) Interoperability
D) Cohesion
Unlock Deck
Unlock for access to all 9 flashcards in this deck.
Unlock Deck
k this deck
7
In the system development process, structure charts are tools used in the _______ phase.

A) analysis
B) design
C) implementation
D) testing
Unlock Deck
Unlock for access to all 9 flashcards in this deck.
Unlock Deck
k this deck
8
_________between modules in a software system must be maximized.

A) Coupling
B) Cohesion
C) Neither coupling nor cohesion
D) Both coupling and cohesion
Unlock Deck
Unlock for access to all 9 flashcards in this deck.
Unlock Deck
k this deck
9
_________between modules in a software system must be minimized.

A) Coupling
B) Cohesion
C) Neither coupling nor cohesion
D) Both coupling and cohesion
Unlock Deck
Unlock for access to all 9 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 9 flashcards in this deck.