Deck 15: Detention Design

Full screen (f)
exit full mode
Question
When does most pollutant transport occur?

A)early in a rainfall event
C)after a rainfall event
B)late in a rainfall event
D)before a rainfall event
Use Space or
up arrow
down arrow
to flip the card.
Question
A detention basin functions by storing water in a pond or ___________________.
Question
Detention basins are designed to release stormwater ____.

A)quickly
C)not at all
B)slowly
D)after treatment
Question
The primary goal of on-site detention is to reduce the peak rate of runoff leaving the site to a level equal to or less than the predevelopment peak rate.
Question
A basin designed to have a permanent pond at the bottom is called a dry basin.
Question
A non-structural strategy for mitigating the effects of development on stormwater runoff is ____.

A)maximizing impervious surfaces
B)minimizing compaction of soil
C)introducing pollutants to water
D)increasing parking space size
Question
Design storms should be chosen to reflect the potential for ____________________.
Question
In addition to controlling the quantity of runoff, detention basins can serve effectively to control water ____ as well.

A)planning
C)quality
B)temperature
D)color
Question
Off-site detention is intended to protect land in the immediate vicinity of the site from the effects of development.
Question
The first flow of runoff is called first ___________________.
Question
Topographic conditions peculiar to individual sites have no bearing on the approach to detention design.
Question
Reduction in peak runoff rate can refer to total ___________________ runoff or it can refer to runoff leaving the site at a specific location.
Question
___________________ detention is difficult to accomplish but often is more effective and less costly than allowing a proliferation of small on-site facilities.
Question
A basin that promotes recharge by storing stormwater for an extended period of time is called ____.

A)a wet basin
C)a sediment basin
B)an infiltration basin
D)a dry basin
Question
Underground basins require additional measures to control pollution.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 15: Detention Design
1
When does most pollutant transport occur?

A)early in a rainfall event
C)after a rainfall event
B)late in a rainfall event
D)before a rainfall event
A
2
A detention basin functions by storing water in a pond or ___________________.
reservoir
3
Detention basins are designed to release stormwater ____.

A)quickly
C)not at all
B)slowly
D)after treatment
B
4
The primary goal of on-site detention is to reduce the peak rate of runoff leaving the site to a level equal to or less than the predevelopment peak rate.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
A basin designed to have a permanent pond at the bottom is called a dry basin.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
A non-structural strategy for mitigating the effects of development on stormwater runoff is ____.

A)maximizing impervious surfaces
B)minimizing compaction of soil
C)introducing pollutants to water
D)increasing parking space size
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
Design storms should be chosen to reflect the potential for ____________________.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
In addition to controlling the quantity of runoff, detention basins can serve effectively to control water ____ as well.

A)planning
C)quality
B)temperature
D)color
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Off-site detention is intended to protect land in the immediate vicinity of the site from the effects of development.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
The first flow of runoff is called first ___________________.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
Topographic conditions peculiar to individual sites have no bearing on the approach to detention design.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
Reduction in peak runoff rate can refer to total ___________________ runoff or it can refer to runoff leaving the site at a specific location.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
___________________ detention is difficult to accomplish but often is more effective and less costly than allowing a proliferation of small on-site facilities.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
A basin that promotes recharge by storing stormwater for an extended period of time is called ____.

A)a wet basin
C)a sediment basin
B)an infiltration basin
D)a dry basin
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
Underground basins require additional measures to control pollution.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 15 flashcards in this deck.