Deck 14: Stormwater Detention
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
Play
Full screen (f)
Deck 14: Stormwater Detention
1
The usual method for computing storage volume is the elevation-area method.
True
2
The primary purpose of an emergency spillway is to control any eventual overtopping of the detention basin by directing the flow in a harmless direction.
False
3
The ____________________ is the volume of water temporarily stored in a detention basin during a rainfall event.
impoundment
4
A multiple-stage outlet contains more than one outlet structure.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
Separate grassed channels are used for major detention basins with large maximum impoundments because this is the safest type of emergency spillway.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
When runoff enters a detention basin and is temporarily stored and then exits through the outlet structure, the peak rate of outflow is____________________ the peak rate of inflow.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
What is the term for computing the outflow hydrograph when the inflow hydrograph is known?
A)attenuation
C)continuity
B)routing
D)Kinematic Wave Method
A)attenuation
C)continuity
B)routing
D)Kinematic Wave Method
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
A single-stage outlet is so called because it allows water to flow through ____ opening(s).
A)one
C)three
B)two
D)four
A)one
C)three
B)two
D)four
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Impounded water in a detention basin is released quickly through the outlet structure.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
Volume for underground detention basins is computed using which method?
A)elevation-area method
C)end-area elevation method
B)average end-area method
D)average method
A)elevation-area method
C)end-area elevation method
B)average end-area method
D)average method
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
What is the calculation called for a series of hypothetical water levels in an impoundment and their corresponding discharge through an orifice?
A)single-stage outlet
C)discharge rating
B)impoundment
D)berm
A)single-stage outlet
C)discharge rating
B)impoundment
D)berm
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
The Modified Puls Method method of reservoir routing relies on the so-called ____________________, which is a statement of conservation of the mass of water entering and leaving the reservoir or impoundment.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
A rainfall event that exceeds the design storm rainfall could ____.
A)drain out the main outlet
B)cause the impoundment level to exceed maximum elevation
C)damage the outlets
D)decrease the impoundment level
A)drain out the main outlet
B)cause the impoundment level to exceed maximum elevation
C)damage the outlets
D)decrease the impoundment level
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
Emergency spillways consist of an additional ____________________ set at an elevation higher than all others so that water will not enter unless the impoundment level has risen higher than anticipated for the design storm.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
The primary purpose of an emergency spillway is to provide a way for excessive water in the impoundment to exit safely, thus preventing a(n) ____________________ of the berm.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck

