Deck 4: Rs Logix 5000 Project Organization
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/16
Play
Full screen (f)
Deck 4: Rs Logix 5000 Project Organization
1
A ControlLogix continuous task is very similar to ladder file 2 in Allen-Bradley SLC 500/MicroLogix or PLC-5 platforms.
True
2
A program can be broken up into logical groups of rungs called ____________________.
subroutines
3
Routines can be any one of four languages available for ControlLogix? What are the four languages?
A routine can be any one of the four programming languages available for ControlLogix. A routine can be:
• Ladder logic
• Function block diagram
• Structured text or sequential
• Function chart
• Ladder logic
• Function block diagram
• Structured text or sequential
• Function chart
4
A bit is set and the controller continues to run when the controller encounters a(n) ____________________. An example would be the battery light alerting that the battery needs to be changed.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
5
A task that is triggered by something that happened or failed to happen is a(n) ____________________.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
6
The number of tasks a particular project can have is determined by the specific controller assigned to the project when the project was created.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
7
Periodic tasks are assigned a priority of between 1 and 15. Priority 1 is lowest, and priority 15 is highest.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
8
Keep in mind that the ____________________ task has no priority. It will always be interrupted by the other tasks.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
9
What occurs when two tasks in a ControlLogix project are assigned the same priority number?
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
10
Any routine must be entirely in the same language.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
11
The starting point for program code execution is the ____________________ routine.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
12
In the New Task window, event trigger selections fall into three groups. What are these three groups?
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
13
An RSLogix 5000 program is the first level of scheduling within the RSLogix 5000 project.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
14
What are three types of RSLogix 5000 routines?
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
15
What happens when a controller encounters a major fault?
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck
16
Briefly distinguish between scheduled and unscheduled programs.
Unlock Deck
Unlock for access to all 16 flashcards in this deck.
Unlock Deck
k this deck