If three fixtures feature a DFU of four, and five fixtures feature a DFU of two, what is the total DFU?
A)14
B)22
C)120
D)11
A)14
B)22
C)120
D)11
B
2
Which of the following is NOT an advantage of a siphonic roof drainage system?
A)cost savings
B)reduced pipe sizes
C)recommended design standard
D)reduced roof penetrations
A)cost savings
B)reduced pipe sizes
C)recommended design standard
D)reduced roof penetrations
C
3
Related to determining roof load factor, what is the weight of one cubic foot of water?
A)624 pounds
B)6.28 pounds
C)164 pounds
D)62.48 pounds
A)624 pounds
B)6.28 pounds
C)164 pounds
D)62.48 pounds
D
4
When would it be appropriate for a plumbing apprentice to design systems?
A)under the general direction of a plumbing contractor
B)under the general direction of a licensed designer
C)when buildings are fast tracked
D)it is not the responsibility of an apprentice
A)under the general direction of a plumbing contractor
B)under the general direction of a licensed designer
C)when buildings are fast tracked
D)it is not the responsibility of an apprentice
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
All codes typically share the same concept in that minimum vent size is:
A)equal to the drain line size
B)half of the drain line size
C)double the drain line size
D)three-quarters of the drain line size
A)equal to the drain line size
B)half of the drain line size
C)double the drain line size
D)three-quarters of the drain line size
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
When do drainage fixture unit (DFU)discharge values come into play?
A)when determining minimum pipe sizes for building drains and sewers
B)when calculating load placed on a system based on fixture discharge
C)when sizing venting systems
D)all of the above
A)when determining minimum pipe sizes for building drains and sewers
B)when calculating load placed on a system based on fixture discharge
C)when sizing venting systems
D)all of the above
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following would typically have the smallest DFU value?
A)commercial food waste disposer
B)clothes washer
C)bathtub
D)water closet
A)commercial food waste disposer
B)clothes washer
C)bathtub
D)water closet
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
Most building codes require that secondary roof drainage systems to:
A)be completely separate from primary roof drainage systems
B)be combined with primary roof drainage systems
C)utilize a mix of separate and primary drainage systems
D)none of the above
A)be completely separate from primary roof drainage systems
B)be combined with primary roof drainage systems
C)utilize a mix of separate and primary drainage systems
D)none of the above
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Vent pipe sizes are selected:
A)after plumbing isometric layout is provided
B)before plumbing isometric layout is provided
C)after all drains are installed
D)at the end of the building project
A)after plumbing isometric layout is provided
B)before plumbing isometric layout is provided
C)after all drains are installed
D)at the end of the building project
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
Appropriately sized storm drainage systems are based upon what?
A)rainfall rates
B)size of the building
C)total DFU
D)nearby infrastructure
A)rainfall rates
B)size of the building
C)total DFU
D)nearby infrastructure
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
Accurate sanitary drainage layouts depend on which factor?
A)DFUs
B)line sizing
C)pipe slope
D)all of the above
A)DFUs
B)line sizing
C)pipe slope
D)all of the above
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
A technician skilled in the aspect of design has the legal authority to overrule a licensed design professional.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following is a plan provided by a designer or engineer?
A)DFU
B)isometric drawing
C)partial plan view
D)sizing chart
A)DFU
B)isometric drawing
C)partial plan view
D)sizing chart
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
There is really never a reason to exceed code when considering installation requirements.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
Siphonic roof drain systems have many cost advantages.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck