Deck 8: Cast-In-Place Concrete

Full screen (f)
exit full mode
Question
____ in concrete construction are used to install construction, contraction, and expansion joints as well as for creating the perimeter of any penetrations in a concrete wall.

A) Waterstops
B) Bleeds
C) Bull floats
D) Trowels
Use Space or
up arrow
down arrow
to flip the card.
Question
Describe the conditions and considerations that should be met when placing concrete in hot weather.
Question
Concrete placement occurs ____ the base for on-grade pours is ready or the forms for walls, columns, and beams are erected and reinforcing is in place.

A) after
B) before
C) at the same time as
D) a week after
Question
Concrete reaches its specified design strength after 28 days of ____.

A) foamwork
B) finishing
C) curing
D) placement
Question
Name the type of fiber reinforcements that are available and name the considerations that regulate which fiber should be used.
Question
____ are hot rolled steel rods that may be plain (smooth) or deformed.

A) Welded wire reinforcements
B) Fiber reinforcements
C) Insulated concrete forms
D) Reinforcing bars
Question
Describe two-way solid slab construction and the formation of the same.
Question
Describe the process of lift-slab construction.
Question
Name the various ways concrete can be moved and placed.
Question
____ construction utilizes a flat slab supported by thickening the slab at each column with a drop panel or a drop panel and a capital.

A) Two-way solid slab
B) Two-way flat slab
C) Two-way flat plate
D) Two-way joist (waffle) flat slab
Question
____ is a form of site-cast concrete.

A) Lift-slab construction
B) Tilt-up concrete construction
C) Tilt-down concrete construction
D) On-grade slab construction
Question
Describe the purpose of snap ties in relation to concrete form work.
Question
____ construction has the slab supported on two sides by beams or load-bearing walls.

A) One-way solid slab
B) One-way flat slab with beams and girders
C) One-way flat slab with joists and beams
D) Two-way flat slab
Question
Describe ICF forms and how they are used.
Question
The ____ system consists of a series of concrete joists cast at right angles to each other to form a grid.

A) two-way flat plate
B) two-way solid slab
C) two-way joist framing
D) one-way solid slab
Question
Describe how cast-in-place concrete is produced on site.
Question
Concrete is usually prepared in ____.

A) batches
B) mixes
C) ready-mixes
D) stations
Question
Describe one-way solid slab construction and the formation of the same.
Question
Describe continuous beam casting as it relates to cast-in-place concrete structural systems.
Question
____ may rest on a continuous concrete footing below grade, such as a basement wall, and extend above grade to form the exterior or interior walls of a building.

A) On-grade concrete slabs
B) Cast-in-place beams
C) Cast-in-place concrete columns
D) Reinforced concrete cast-in-place walls
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Cast-In-Place Concrete
1
____ in concrete construction are used to install construction, contraction, and expansion joints as well as for creating the perimeter of any penetrations in a concrete wall.

A) Waterstops
B) Bleeds
C) Bull floats
D) Trowels
A
2
Describe the conditions and considerations that should be met when placing concrete in hot weather.
In addition to maintaining low concrete temperature by cooling the aggregates and water, precautions must be taken to maintain a low temperature while placing concrete. This can involve shading and painting the mixers, chutes, hoppers, pump lines, and other concrete handling equipment white. Forms can be cooled with water, and the sub-grade can be moistened before the concrete is placed. Concrete must be transported from the mixing station to the point of placement as quickly as possible. In hot weather, the mix should be in place 45 to 60 minutes after mixing.
3
Concrete placement occurs ____ the base for on-grade pours is ready or the forms for walls, columns, and beams are erected and reinforcing is in place.

A) after
B) before
C) at the same time as
D) a week after
A
4
Concrete reaches its specified design strength after 28 days of ____.

A) foamwork
B) finishing
C) curing
D) placement
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
Name the type of fiber reinforcements that are available and name the considerations that regulate which fiber should be used.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
____ are hot rolled steel rods that may be plain (smooth) or deformed.

A) Welded wire reinforcements
B) Fiber reinforcements
C) Insulated concrete forms
D) Reinforcing bars
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
Describe two-way solid slab construction and the formation of the same.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Describe the process of lift-slab construction.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Name the various ways concrete can be moved and placed.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
____ construction utilizes a flat slab supported by thickening the slab at each column with a drop panel or a drop panel and a capital.

A) Two-way solid slab
B) Two-way flat slab
C) Two-way flat plate
D) Two-way joist (waffle) flat slab
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
____ is a form of site-cast concrete.

A) Lift-slab construction
B) Tilt-up concrete construction
C) Tilt-down concrete construction
D) On-grade slab construction
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
Describe the purpose of snap ties in relation to concrete form work.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
____ construction has the slab supported on two sides by beams or load-bearing walls.

A) One-way solid slab
B) One-way flat slab with beams and girders
C) One-way flat slab with joists and beams
D) Two-way flat slab
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
Describe ICF forms and how they are used.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
The ____ system consists of a series of concrete joists cast at right angles to each other to form a grid.

A) two-way flat plate
B) two-way solid slab
C) two-way joist framing
D) one-way solid slab
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
Describe how cast-in-place concrete is produced on site.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
Concrete is usually prepared in ____.

A) batches
B) mixes
C) ready-mixes
D) stations
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
Describe one-way solid slab construction and the formation of the same.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
Describe continuous beam casting as it relates to cast-in-place concrete structural systems.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
____ may rest on a continuous concrete footing below grade, such as a basement wall, and extend above grade to form the exterior or interior walls of a building.

A) On-grade concrete slabs
B) Cast-in-place beams
C) Cast-in-place concrete columns
D) Reinforced concrete cast-in-place walls
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 20 flashcards in this deck.