Deck 10: Tower
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
Play
Full screen (f)
Deck 10: Tower
1
Impact grade sockets should always be used with power bolting tools.
True
2
Utility size wind turbine tower designs have generally been self-supporting lattice or tube.
True
3
Components listed on a tower inspection and maintenance checklist may include: cables, mounting hardware, ladder safety equipment, and ___________.
A) tower lighting
B) GFCI receptacles
C) access hatches
D) All answers are correct
A) tower lighting
B) GFCI receptacles
C) access hatches
D) All answers are correct
D
4
An acceptable sequence for tightening fasteners around a circle is called a __________.
A) star pattern
B) moon pattern
C) cross pattern
D) None of the answers are correct
A) star pattern
B) moon pattern
C) cross pattern
D) None of the answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
Accidents involving power bolting tools may include: crush, pinch, and _______.
A) injection
B) amputation
C) burns
D) All answers are correct
A) injection
B) amputation
C) burns
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
All cables running up the tower are used for electrical power transfer to the utility interconnection.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
Drip loop refers to the accumulation of cable located immediately above the yaw deck.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
Typical ladder safety systems include a vertical life line cable assembly and ________.
A) bungee cord
B) rail system
C) number ten noodle
D) All answers are correct
A) bungee cord
B) rail system
C) number ten noodle
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Thermal imaging of cable bundles during operation or immediately after shut down would be a good means to determine a cable splice or termination problem.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
Contamination of the power cable insulating jacket with lubricating oil will never cause damage to the cable.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
Inspection of the ladder assembly, decks, and access hatches is not necessary during any maintenance activity.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
Bolts retaining the tube tower sections should be inspected for torque level every semi-annual preventative maintenance cycle.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
Inspection items for cables may include: nicks, abrassion, and _________.
A) oil contamination
B) cuts
C) missing insulation
D) All answers are correct
A) oil contamination
B) cuts
C) missing insulation
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
An inspection of cable bundles running up the tower assembly should always include: mounting hardware, insulation damage, and weight.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
Using a paint pen to mark the final position of a nut after a torque inspection is a good means to determine if the nut loosens between maintenance cycles.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck