Deck 11: Machine Head

Full screen (f)
exit full mode
Question
Some wind turbine manufacturers locate the power conversion system and step up transformers within the nacelle.
Use Space or
up arrow
down arrow
to flip the card.
Question
The term "Yaw" refers to motion about the horizontal axis of the tower.
Question
Inspection of the yaw drive units may include: addition of gear oil, checking mounting hardware, and ________.

A) checking for leaks
B) adjusting motor brake disk clearance
C) cleaning the assembly
D) All answers are correct
Question
The bedplate assembly is the main structural support within the nacelle.
Question
The machine head includes components such as the generator, drive train, yaw drive, and nacelle assembly.
Question
Visual inspection of the yaw drive sytem may include noting oil levels, checking wire connections, and a torque test of mounting fasteners.
Question
Maintenance activities within the wind turbine machine head may include: lubricating the yaw ring gear, inspection of the yaw drive units, and ____________.

A) washing the blades
B) painting the tower
C) tensioning foundation bolts
D) None of the answers are correct
Question
Disposing of waste lubricant around the tower foundation after a maintenance activity is an acceptable procedure.
Question
Processes used to fabricate the bed plate assembly include: casting and _________.

A) bolting
B) welding
C) machining
D) All answers are correct
Question
It is not necessary to review the MSDS of a new chemical before it is used on the job.
Question
Yaw brake designs fall into two catagories: hydraulic and active.
Question
The passive yaw brake plungers should always be torqued to their final level in a sequential pattern after inspection.
Question
Documenting each activity during a PM cycle provides proof the activity was completed and ensure steps are not missed.
Question
Non-destructive test methods may include: magnetic particle, visual, and ________.

A) dye penetrant
B) insulation resistance
C) Thermography
D) All answers are correct
Question
Inspection and maintenance of the power conversion system may include: clean cabinet surfaces, tighten cable connections, and ____________.

A) replace hoses
B) tighten hose clamps
C) LOTO procedure
D) All answers are correct
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 11: Machine Head
1
Some wind turbine manufacturers locate the power conversion system and step up transformers within the nacelle.
True
2
The term "Yaw" refers to motion about the horizontal axis of the tower.
False
3
Inspection of the yaw drive units may include: addition of gear oil, checking mounting hardware, and ________.

A) checking for leaks
B) adjusting motor brake disk clearance
C) cleaning the assembly
D) All answers are correct
D
4
The bedplate assembly is the main structural support within the nacelle.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
The machine head includes components such as the generator, drive train, yaw drive, and nacelle assembly.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
Visual inspection of the yaw drive sytem may include noting oil levels, checking wire connections, and a torque test of mounting fasteners.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
Maintenance activities within the wind turbine machine head may include: lubricating the yaw ring gear, inspection of the yaw drive units, and ____________.

A) washing the blades
B) painting the tower
C) tensioning foundation bolts
D) None of the answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
Disposing of waste lubricant around the tower foundation after a maintenance activity is an acceptable procedure.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Processes used to fabricate the bed plate assembly include: casting and _________.

A) bolting
B) welding
C) machining
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
It is not necessary to review the MSDS of a new chemical before it is used on the job.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
Yaw brake designs fall into two catagories: hydraulic and active.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
The passive yaw brake plungers should always be torqued to their final level in a sequential pattern after inspection.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
Documenting each activity during a PM cycle provides proof the activity was completed and ensure steps are not missed.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
Non-destructive test methods may include: magnetic particle, visual, and ________.

A) dye penetrant
B) insulation resistance
C) Thermography
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
Inspection and maintenance of the power conversion system may include: clean cabinet surfaces, tighten cable connections, and ____________.

A) replace hoses
B) tighten hose clamps
C) LOTO procedure
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 15 flashcards in this deck.