Deck 9: Down Tower Area

Full screen (f)
exit full mode
Question
A " Hot-Cold-Hot" test ensures a multi-meter is functioning properly and the circuit is at zero potential.
Use Space or
up arrow
down arrow
to flip the card.
Question
Cooling system leaks should be corrected because they may lead to electrical shorts and _______.

A) over heating of components
B) corrosion of electrical connections
C) loss of coolant
D) All answers are correct
Question
Inspection of control console electrical connections should include an approved LOTO procedure before begining work.
Question
The acronym DTA stands for Driving to Aggressively.
Question
A tower foundation rod "strike test" should be used to verify the exact tension level of each rod.
Question
Cooling systems utilized with power electronics may be classified as two types: liquid and forced air.
Question
Wind turbine foundations are generaly rock anchor or granite types.
Question
Verification of wind turbine control system safety switches should be performed during each preventative maintenance cycle.
Question
Inspection of DTA blind areas should be carried out with caution because there may be insects, snakes, or other wildlife that have taken up residence since the last PM activity.
Question
The first step in a DTA control console wire and power cable inspection process should include ________.

A) washing the therminal strips
B) an approved LOTO proceedure
C) stopping for lunch
D) hoisting all tools to the nacelle
Question
The power conversion system for all wind turbines is located in the DTA.
Question
Preventative maintenance activites for the DTA may include: PC software updates, inspection of wire and cable terminations, along with __________.

A) inspection of the power conversion system
B) inspection of the nacelle exterior
C) inspection of the blade bearing
D) none of the answers are correct
Question
The PC enables the wind farm SCADA system to comunicate with the wind turbine PLC.
Question
Preventative maintenance activities for a PC may include: operating system updates, disk defrag, and ___________.

A) cleaning of the cooling fan ports
B) inspecting electrical connections
C) powering down the PC
D) All answers are correct
Question
Preventative maintenance activities for a UPS system may include: battery impedance, voltage, and ___________.

A) inspection of cable connections
B) specific gravity test for the glycol solution
C) shorting the output terminals
D) All answers are correct
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 9: Down Tower Area
1
A " Hot-Cold-Hot" test ensures a multi-meter is functioning properly and the circuit is at zero potential.
True
2
Cooling system leaks should be corrected because they may lead to electrical shorts and _______.

A) over heating of components
B) corrosion of electrical connections
C) loss of coolant
D) All answers are correct
D
3
Inspection of control console electrical connections should include an approved LOTO procedure before begining work.
True
4
The acronym DTA stands for Driving to Aggressively.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
A tower foundation rod "strike test" should be used to verify the exact tension level of each rod.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
Cooling systems utilized with power electronics may be classified as two types: liquid and forced air.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
Wind turbine foundations are generaly rock anchor or granite types.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
Verification of wind turbine control system safety switches should be performed during each preventative maintenance cycle.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Inspection of DTA blind areas should be carried out with caution because there may be insects, snakes, or other wildlife that have taken up residence since the last PM activity.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
The first step in a DTA control console wire and power cable inspection process should include ________.

A) washing the therminal strips
B) an approved LOTO proceedure
C) stopping for lunch
D) hoisting all tools to the nacelle
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
The power conversion system for all wind turbines is located in the DTA.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
Preventative maintenance activites for the DTA may include: PC software updates, inspection of wire and cable terminations, along with __________.

A) inspection of the power conversion system
B) inspection of the nacelle exterior
C) inspection of the blade bearing
D) none of the answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
The PC enables the wind farm SCADA system to comunicate with the wind turbine PLC.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
Preventative maintenance activities for a PC may include: operating system updates, disk defrag, and ___________.

A) cleaning of the cooling fan ports
B) inspecting electrical connections
C) powering down the PC
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
Preventative maintenance activities for a UPS system may include: battery impedance, voltage, and ___________.

A) inspection of cable connections
B) specific gravity test for the glycol solution
C) shorting the output terminals
D) All answers are correct
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 15 flashcards in this deck.