Deck 5: Combined Operations

Full screen (f)
exit full mode
Question
The Associative Property is also known as the Order Property.
Use Space or
up arrow
down arrow
to flip the card.
Question
The equation: 5 x (3 + 4) = (5 x 3) + (5 x 4) is an example of the Distributive Property.
Question
A machinist can make 24 screws in one minute. How many screws can he make in 2 hour and 12 minutes and 45 seconds?
Question
Perform the indicated operation and solve: 72 ÷ 3 - 5 x 4 =
Question
An engineering department employs 296 drafters in departments X and Z. Each engineer is assigned four drafters. Department X has 44 engineers. How many engineers are in department Z ?
Question
Which property is represented by the following: 8 x (4 + 5) = (8 x 4) + (8 x 5)?
Question
A piece of shafting is 108 ² long. Lengths of 16 ² , 18 ² , 30 ² , 8 ² , and 16 ² are cut from it. Determine how much material remains after these cuts are made. (No allowance is made for material lost in the cutting process.)
Question
Perform the indicated operation and solve: (8 + 8) x (12 - 4) =
Question
Perform the indicated operation and solve: 12 x (2 + 4) =
Question
A machinist can make 22 screws in one minute. How many screws can he make in 1 hour and 13 minutes?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Combined Operations
1
The Associative Property is also known as the Order Property.
False
2
The equation: 5 x (3 + 4) = (5 x 3) + (5 x 4) is an example of the Distributive Property.
True
3
A machinist can make 24 screws in one minute. How many screws can he make in 2 hour and 12 minutes and 45 seconds?
approximately 3,186 screws
4
Perform the indicated operation and solve: 72 ÷ 3 - 5 x 4 =
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
An engineering department employs 296 drafters in departments X and Z. Each engineer is assigned four drafters. Department X has 44 engineers. How many engineers are in department Z ?
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
Which property is represented by the following: 8 x (4 + 5) = (8 x 4) + (8 x 5)?
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
A piece of shafting is 108 ² long. Lengths of 16 ² , 18 ² , 30 ² , 8 ² , and 16 ² are cut from it. Determine how much material remains after these cuts are made. (No allowance is made for material lost in the cutting process.)
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
Perform the indicated operation and solve: (8 + 8) x (12 - 4) =
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
Perform the indicated operation and solve: 12 x (2 + 4) =
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
A machinist can make 22 screws in one minute. How many screws can he make in 1 hour and 13 minutes?
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 10 flashcards in this deck.