Question
When tasks must be completed one after another, they are called concurrent tasks.
Use Space or
up arrow
down arrow
to flip the card.
Question
In most systems analysis tasks, time and people are interchangeable.
Question
Project planning, an activity of a project manager, _____.

A) involves requires guiding, supervising, and coordinating the a project team's workload
B) includes monitoring the progress of the a project, evaluating results, and taking corrective action when necessary to stay on target
C)
Focuses on long-term challenges and goals, the importance of stakeholders, and a commitment to the firm's role as a corporate citizenconsists of staffing, which includes selecting the project team and assigning specific tasks to team members
D) includes identifying project tasks and estimating completion times and costs
Question
The three legs of a project triangle are _____, scope, and time.

A) requirements
B) resources
C) environment
D) cost
Question
If team members lack experience with certain aspects of the required technology, temporary help might be obtained from IT consultants or part-time staff.​
Question
Critical time is the amount of time that a task could be late without pushing back the completion date of an entire project.
Question
Using a work breakdown structure (WBS) allows one to manage a project as one large task.
Question
The purpose of quantitative risk analysis is to understand the actual impact of a risk in terms of dollars, time, project scope, or quality.
Question
If any task along a critical path falls behind schedule, the entire project will be delayed.
Question
The prior experience method to make time and cost estimates works best for large projects.
Question
System developers can initiate a formal project as early as the preliminary investigation stage, or later on, as analysis, design, and implementation activities occur.
Question
In a Program Evaluation Review Technique (PERT)/Critical Path Method (CPM) chart, each rectangular box, called a task box, has five sections that contain important information about a task.
Question
A _____ negotiates with users who might have conflicting requirements or want changes that would require additional time or expense.

A) project manager
B) project reporter
C) software tester
D) software developer
Question
Project reporting, an activity of a project manager, _____.

A) involves the creation of a specific timetable, usually in the form of charts that show tasks, task dependencies, and critical tasks that might delay a project
B) includes informing management, users, and the project team about the progress of a project
C) consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D) includes identifying and arranging project tasks and estimating completion times and costs
Question
Quantitative risk analysis evaluates each risk by estimating the probability that it will occur and the degree of impact.​
Question
Program Evaluation Review Technique (PERT)/Critical Path Method (CPM) and Gantt charts are mutually exclusive techniques.
Question
Project monitoring, an activity of a project manager, _____.​

A)
Requires guiding, supervising, and coordinating a project team's workload
B) involves the creation of a specific timetable, usually in the form of charts that show tasks, task dependencies, and critical tasks that might delay a project
C) consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D) includes identifying and arranging project tasks and estimating completion times and costs
Question
Generally, systems analysts review the work of other systems analysts, and programmers review the work of other programmers, as a form of peer review, in structured walk-throughs.
Question
Effective project reporting requires _____.

A) strong communication skills
B)
Strong intervention skills
C) strong negotiation skills
D) strong leadership skills
Question
Project scheduling, an activity of a project manager, _____.​

A) requires guiding, supervising, and coordinating a project team's workload
B) includes monitoring the progress of a project, evaluating results, and taking corrective action when necessary to stay on target
C) involves staffing, which includes selecting the project team and assigning specific tasks to team members
D) includes budgeting a project based on the number of modules and their complexity in a project
Question
Project managers always must be aware of the _____, so they can monitor the vital tasks and keep a project on track.

A) absolute path
B) relative path
C) critical path
D) dynamic path
Question
Using a(n) _____, a project manager can convert task start and finish times to actual dates by laying out the entire project on a calendar.​

A) XY chart
B) Pedigree chart
C) Program Evaluation Review Technique (PERT) chart
D) Scatter chart
Question
When several tasks can start at the same time, each is called a(n) _____ task.

A) model
B) asynchronous
C) baseline
D) concurrent
Question
When two or more concurrent tasks depend on a single prior task, each of the concurrent tasks is called a(n) _____.

A) successor task
B) discrete task
C) antecedent task
D) descendent task
Question
A _____ might involve maximums for one or more resources, such as time, dollars, or people.

A) successor task
B) constraint
C) task ID
D) milestone
Question
When maintaining schedules, if enough _____ and frequent checkpoints exist, problems will be detected rapidly.

A) activity diagrams
B) milestones
C) data flow diagrams
D) viewports
Question
A _____ represents the work that one person can complete in one day.​

A) person-day
B) work-day
C) work-duration
D) ​person-work
Question
A _____ chart displays complex task patterns and relationships.

A) Gantt
B) Pareto
C) Program Evaluation Review Technique (PERT)
D) Scatter
Question
A _____ involves breaking a project down into a series of smaller tasks.

A) work breakdown structure (WBS)
B) value breakdown structure (VBS)
C) risk breakdown structure (RBS)
D) concept breakdown structure (CBS)
Question
Two or more concurrent tasks often depend on a single prior task, which is called a _____.

A) predecessor task
B) wireframe task
C) beneficiary task
D) discrete task
Question
A _____ is a review of a project team member's work by other members of a team.​

A) critical walk-through
B) foundational walk-through
C) baseline walk-through
D) structured walk-through
Question
The first step in the creation of a Program Evaluation Review Technique (PERT)/Critical Path Method (CPM) chart is to _____.

A) the graphical planning aids to use
B) determine the logical order of project tasks identify
C) determine the status of all tasks
D) identify all the project tasks
Question
The first step in creating a work breakdown structure (WBS) is to _____.

A) mark all recognizable events
B) determine time requirements
C) list all tasks
D) estimate task completion time and cost
Question
A(n) _____ is a recognizable reference point that can be used to monitor progress.

A) event
B) notification
C) alert
D) task
Question
The _____ is the most pessimistic outcome of a task.

A) best-case estimate (B)
B) probable-case estimate (P)
C) worst-case estimate (W)
D) dominant-case estimate (D)
Question
A _____ cannot be started until a previous task is completed.​

A) dependent task
B) predecessor task
C) precursor task
D) concurrent task
Question
A(n) _____ is a condition, restriction, or requirement that the system must satisfy.

A) constraint
B) index
C) milestone
D) viewport
Question
A(n) _____ is a series of tasks that, if delayed, would affect the completion date of the overall project.

A) critical path
B) dynamic path
C) absolute path
D) relative path
Question
Two or more _____ depend on a predecessor task.

A) dependent tasks
B) concurrent tasks
C) ancestor tasks
D) precursor tasks
Question
A _____ is a series of events and activities with no slack time.

A) risk path
B) foundation path
C) baseline path
D) critical path
Question
A _____ is a proactive effort to anticipate a risk and describe an action plan to deal with it.

A) risk identification plan
B) risk response plan
C) risk balance plan
D) risk management plan
Question
_____, a human resource issue, is a possible cause of cost overruns in an organization.

A) Inadequate training
B) Inaccurate demand forecast
C) Poor monitoring of progress
D) Unrealistic estimates
Question
Adding more people to a project actually might increase the time necessary to complete the project because of a principle called _____.

A) Brooks' Law
B) Bernoulli's Law
C) Hooke's Law
D) Moody's Law
Question
Microsoft's risk management model includes _____, which represents the likelihood that the risk will happen.

A) category
B) probability
C) trigger
D) description
Question
A _____ consists of horizontal bars, connected with arrows that indicate task dependencies.

A) Gantt chart
B) viewport
C) Scatter chart
D) wireframe
Question
Mauricio, a project manager at a reputed firm, has been assigned to handle a new project that the firm has received. This project involves a lot of scheduling that has to be handled by Mauricio.
Mauricio estimates that the first module of the project could be completed in as few as 15 days or could take as many as 25 days, but most likely will require 20 days. Determine the expected task duration.​

A) 22.5
B) 17.5
C) 20
D) 25
Question
_____ lists each risk and assesses the likelihood that it could affect a project.

A) Risk averting
B) Risk dominance
C) Risk identification
D) Risk analytics
Question
_____ is a full-featured program that holds the dominant share of the project management software market.

A) Apptivo
B) GanttProject
C) Microsoft Project
D) Gantter
Question
_____, a free cloud-based project management tool, runs in a browser window, so there is no software to install to use it.

A) Apptivo
B) Smartsheet
C) Microsoft Project
D) Gantter
Question
A(n) _____ is an event that could affect a project negatively.​

A) issue
B) webinar
C) uncertainty
D) risk
Question
When a project manager first recognizes that a project is in trouble, one of the options available to the manager includes _____.

A) delaying the project deadline
B) expanding the project requirements
C) reducing the project resources
D) eliminating controls and procedures
Question
Microsoft's risk management model includes _____, which specifies the risk type.

A) category
B) description
C) trigger
D) probability
Question
A _____ includes a review of a project's scope, stakeholders, budget, schedule, and any other internal or external factors that might affect the project.

A) change management plan
B) configuration management plan
C) debt management plan
D) risk management plan
Question
Mauricio, a project manager at a reputed firm, has been assigned to handle a new project that the firm has received. This project involves a lot of scheduling that has to be handled by Mauricio.
Mauricio has decided to use a project management tool for this project. He wants the tool to be free and cloud-based so that there is no need for software to be installed. Help Mauricio in identifying the project management tool that best fits the purpose.​

A) Apptivo
B) Smartsheet
C) Microsoft Project
D) Gantter
Question
Microsoft claims that the Microsoft Project software can _____.

A) link risks with specific vendors
B) link risks with specific tasks and projects
C) eliminate risks
D) prevent risks
Question
A _____ displays the same information as the Gantt chart, including task dependencies, but uses task boxes to include much more detail.

A) semantic wireframe
B) mesh topology
C)
Ring topology
D) network diagram
Question
_____ can involve a modeling process called what-if analysis, which allows a project manager to vary one or more element(s) in a model to measure the effect on other elements.

A) Qualitative risk analysis
B) Quantitative risk analysis
C) Resource list analysis
D) Trigger analysis
Question
A continuous risk-tracking process can _____.

A) notice changes in existing risks
B) revert reported risks
C) prevent human resource turnover issues
D) prevent new issues
Question
_____ give the project managers an opportunity to seek input and conduct brainstorming sessions.

A) Status reports
B) Project review reports
C) Project status meetings
D) Board meetings
Question
_____ give team members of a project an opportunity to share information, discuss common problems, and explain new techniques.

A) Board meetings
B) Project status meetings
C) Project review reports
D) Status reports
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Developed by the U.S. Navy to manage very complex projects
Question
<strong>  A(n) _____ is any work that has a beginning and an end and requires the use of company resources such as people, time, or money.​</strong> A) benchmark B) activity C) milestone D) breakthrough <div style=padding-top: 35px>
A(n) _____ is any work that has a beginning and an end and requires the use of company resources such as people, time, or money.​

A) benchmark
B) activity
C) milestone
D) breakthrough
Question
<strong>  Program Evaluation Review Technique (PERT) is a _____ technique because it analyzes a large, complex project as a series of individual tasks.</strong> A) top-down B) bottom-up C) three-point estimate D) six-point estimate <div style=padding-top: 35px>
Program Evaluation Review Technique (PERT) is a _____ technique because it analyzes a large, complex project as a series of individual tasks.

A) top-down
B) bottom-up
C) three-point estimate
D) six-point estimate
Question
<strong>  A task that represents several activities is known as a _____.</strong> A) task group B) task name C) task review D) task ID <div style=padding-top: 35px>
A task that represents several activities is known as a _____.

A) task group
B) task name
C) task review
D) task ID
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
A condition, restriction, or requirement that a system must satisfy
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Handles the administrative responsibilities for a development team
Question
Briefly explain the tasks performed by a project manager.​
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Tasks that must be completed one after another
Question
The _____ are time estimates made by project managers for a task.

A) best-case estimate
B) worst-case estimate
C) dominant-case estimate
D) probable-case estimate
Question
Structured walk-throughs take place throughout the SDLC and are called _____ reviews, depending on the phase in which they occur.

A) technical
B) design
C) code
D) testing
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
An important value assigned to an estimate
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Usually a senior systems analyst or an IT department manager, if the project is large
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Tasks that must be completed before another task can start.
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
The process of planning, scheduling, monitoring, and reporting on the development of an information system
Question
Project managers typically perform the tasks of _____.​

A) project planning
B) project scheduling
C) project monitoring
D) project testing
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Defines the tasks that can start at the same time
Question
Define risk and give a basic list of risk management steps.
Question
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
A recognizable reference point that can be used to monitor progress and manage a project
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/78
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Managing Systems Projects
1
When tasks must be completed one after another, they are called concurrent tasks.
False
2
In most systems analysis tasks, time and people are interchangeable.
False
3
Project planning, an activity of a project manager, _____.

A) involves requires guiding, supervising, and coordinating the a project team's workload
B) includes monitoring the progress of the a project, evaluating results, and taking corrective action when necessary to stay on target
C)
Focuses on long-term challenges and goals, the importance of stakeholders, and a commitment to the firm's role as a corporate citizenconsists of staffing, which includes selecting the project team and assigning specific tasks to team members
D) includes identifying project tasks and estimating completion times and costs
D
4
The three legs of a project triangle are _____, scope, and time.

A) requirements
B) resources
C) environment
D) cost
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
5
If team members lack experience with certain aspects of the required technology, temporary help might be obtained from IT consultants or part-time staff.​
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
6
Critical time is the amount of time that a task could be late without pushing back the completion date of an entire project.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
7
Using a work breakdown structure (WBS) allows one to manage a project as one large task.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
8
The purpose of quantitative risk analysis is to understand the actual impact of a risk in terms of dollars, time, project scope, or quality.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
9
If any task along a critical path falls behind schedule, the entire project will be delayed.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
10
The prior experience method to make time and cost estimates works best for large projects.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
11
System developers can initiate a formal project as early as the preliminary investigation stage, or later on, as analysis, design, and implementation activities occur.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
12
In a Program Evaluation Review Technique (PERT)/Critical Path Method (CPM) chart, each rectangular box, called a task box, has five sections that contain important information about a task.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
13
A _____ negotiates with users who might have conflicting requirements or want changes that would require additional time or expense.

A) project manager
B) project reporter
C) software tester
D) software developer
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
14
Project reporting, an activity of a project manager, _____.

A) involves the creation of a specific timetable, usually in the form of charts that show tasks, task dependencies, and critical tasks that might delay a project
B) includes informing management, users, and the project team about the progress of a project
C) consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D) includes identifying and arranging project tasks and estimating completion times and costs
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
15
Quantitative risk analysis evaluates each risk by estimating the probability that it will occur and the degree of impact.​
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
16
Program Evaluation Review Technique (PERT)/Critical Path Method (CPM) and Gantt charts are mutually exclusive techniques.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
17
Project monitoring, an activity of a project manager, _____.​

A)
Requires guiding, supervising, and coordinating a project team's workload
B) involves the creation of a specific timetable, usually in the form of charts that show tasks, task dependencies, and critical tasks that might delay a project
C) consists of staffing, which includes selecting the project team and assigning specific tasks to team members
D) includes identifying and arranging project tasks and estimating completion times and costs
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
18
Generally, systems analysts review the work of other systems analysts, and programmers review the work of other programmers, as a form of peer review, in structured walk-throughs.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
19
Effective project reporting requires _____.

A) strong communication skills
B)
Strong intervention skills
C) strong negotiation skills
D) strong leadership skills
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
20
Project scheduling, an activity of a project manager, _____.​

A) requires guiding, supervising, and coordinating a project team's workload
B) includes monitoring the progress of a project, evaluating results, and taking corrective action when necessary to stay on target
C) involves staffing, which includes selecting the project team and assigning specific tasks to team members
D) includes budgeting a project based on the number of modules and their complexity in a project
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
21
Project managers always must be aware of the _____, so they can monitor the vital tasks and keep a project on track.

A) absolute path
B) relative path
C) critical path
D) dynamic path
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
22
Using a(n) _____, a project manager can convert task start and finish times to actual dates by laying out the entire project on a calendar.​

A) XY chart
B) Pedigree chart
C) Program Evaluation Review Technique (PERT) chart
D) Scatter chart
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
23
When several tasks can start at the same time, each is called a(n) _____ task.

A) model
B) asynchronous
C) baseline
D) concurrent
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
24
When two or more concurrent tasks depend on a single prior task, each of the concurrent tasks is called a(n) _____.

A) successor task
B) discrete task
C) antecedent task
D) descendent task
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
25
A _____ might involve maximums for one or more resources, such as time, dollars, or people.

A) successor task
B) constraint
C) task ID
D) milestone
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
26
When maintaining schedules, if enough _____ and frequent checkpoints exist, problems will be detected rapidly.

A) activity diagrams
B) milestones
C) data flow diagrams
D) viewports
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
27
A _____ represents the work that one person can complete in one day.​

A) person-day
B) work-day
C) work-duration
D) ​person-work
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
28
A _____ chart displays complex task patterns and relationships.

A) Gantt
B) Pareto
C) Program Evaluation Review Technique (PERT)
D) Scatter
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
29
A _____ involves breaking a project down into a series of smaller tasks.

A) work breakdown structure (WBS)
B) value breakdown structure (VBS)
C) risk breakdown structure (RBS)
D) concept breakdown structure (CBS)
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
30
Two or more concurrent tasks often depend on a single prior task, which is called a _____.

A) predecessor task
B) wireframe task
C) beneficiary task
D) discrete task
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
31
A _____ is a review of a project team member's work by other members of a team.​

A) critical walk-through
B) foundational walk-through
C) baseline walk-through
D) structured walk-through
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
32
The first step in the creation of a Program Evaluation Review Technique (PERT)/Critical Path Method (CPM) chart is to _____.

A) the graphical planning aids to use
B) determine the logical order of project tasks identify
C) determine the status of all tasks
D) identify all the project tasks
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
33
The first step in creating a work breakdown structure (WBS) is to _____.

A) mark all recognizable events
B) determine time requirements
C) list all tasks
D) estimate task completion time and cost
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
34
A(n) _____ is a recognizable reference point that can be used to monitor progress.

A) event
B) notification
C) alert
D) task
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
35
The _____ is the most pessimistic outcome of a task.

A) best-case estimate (B)
B) probable-case estimate (P)
C) worst-case estimate (W)
D) dominant-case estimate (D)
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
36
A _____ cannot be started until a previous task is completed.​

A) dependent task
B) predecessor task
C) precursor task
D) concurrent task
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
37
A(n) _____ is a condition, restriction, or requirement that the system must satisfy.

A) constraint
B) index
C) milestone
D) viewport
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
38
A(n) _____ is a series of tasks that, if delayed, would affect the completion date of the overall project.

A) critical path
B) dynamic path
C) absolute path
D) relative path
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
39
Two or more _____ depend on a predecessor task.

A) dependent tasks
B) concurrent tasks
C) ancestor tasks
D) precursor tasks
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
40
A _____ is a series of events and activities with no slack time.

A) risk path
B) foundation path
C) baseline path
D) critical path
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
41
A _____ is a proactive effort to anticipate a risk and describe an action plan to deal with it.

A) risk identification plan
B) risk response plan
C) risk balance plan
D) risk management plan
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
42
_____, a human resource issue, is a possible cause of cost overruns in an organization.

A) Inadequate training
B) Inaccurate demand forecast
C) Poor monitoring of progress
D) Unrealistic estimates
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
43
Adding more people to a project actually might increase the time necessary to complete the project because of a principle called _____.

A) Brooks' Law
B) Bernoulli's Law
C) Hooke's Law
D) Moody's Law
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
44
Microsoft's risk management model includes _____, which represents the likelihood that the risk will happen.

A) category
B) probability
C) trigger
D) description
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
45
A _____ consists of horizontal bars, connected with arrows that indicate task dependencies.

A) Gantt chart
B) viewport
C) Scatter chart
D) wireframe
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
46
Mauricio, a project manager at a reputed firm, has been assigned to handle a new project that the firm has received. This project involves a lot of scheduling that has to be handled by Mauricio.
Mauricio estimates that the first module of the project could be completed in as few as 15 days or could take as many as 25 days, but most likely will require 20 days. Determine the expected task duration.​

A) 22.5
B) 17.5
C) 20
D) 25
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
47
_____ lists each risk and assesses the likelihood that it could affect a project.

A) Risk averting
B) Risk dominance
C) Risk identification
D) Risk analytics
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
48
_____ is a full-featured program that holds the dominant share of the project management software market.

A) Apptivo
B) GanttProject
C) Microsoft Project
D) Gantter
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
49
_____, a free cloud-based project management tool, runs in a browser window, so there is no software to install to use it.

A) Apptivo
B) Smartsheet
C) Microsoft Project
D) Gantter
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
50
A(n) _____ is an event that could affect a project negatively.​

A) issue
B) webinar
C) uncertainty
D) risk
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
51
When a project manager first recognizes that a project is in trouble, one of the options available to the manager includes _____.

A) delaying the project deadline
B) expanding the project requirements
C) reducing the project resources
D) eliminating controls and procedures
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
52
Microsoft's risk management model includes _____, which specifies the risk type.

A) category
B) description
C) trigger
D) probability
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
53
A _____ includes a review of a project's scope, stakeholders, budget, schedule, and any other internal or external factors that might affect the project.

A) change management plan
B) configuration management plan
C) debt management plan
D) risk management plan
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
54
Mauricio, a project manager at a reputed firm, has been assigned to handle a new project that the firm has received. This project involves a lot of scheduling that has to be handled by Mauricio.
Mauricio has decided to use a project management tool for this project. He wants the tool to be free and cloud-based so that there is no need for software to be installed. Help Mauricio in identifying the project management tool that best fits the purpose.​

A) Apptivo
B) Smartsheet
C) Microsoft Project
D) Gantter
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
55
Microsoft claims that the Microsoft Project software can _____.

A) link risks with specific vendors
B) link risks with specific tasks and projects
C) eliminate risks
D) prevent risks
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
56
A _____ displays the same information as the Gantt chart, including task dependencies, but uses task boxes to include much more detail.

A) semantic wireframe
B) mesh topology
C)
Ring topology
D) network diagram
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
57
_____ can involve a modeling process called what-if analysis, which allows a project manager to vary one or more element(s) in a model to measure the effect on other elements.

A) Qualitative risk analysis
B) Quantitative risk analysis
C) Resource list analysis
D) Trigger analysis
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
58
A continuous risk-tracking process can _____.

A) notice changes in existing risks
B) revert reported risks
C) prevent human resource turnover issues
D) prevent new issues
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
59
_____ give the project managers an opportunity to seek input and conduct brainstorming sessions.

A) Status reports
B) Project review reports
C) Project status meetings
D) Board meetings
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
60
_____ give team members of a project an opportunity to share information, discuss common problems, and explain new techniques.

A) Board meetings
B) Project status meetings
C) Project review reports
D) Status reports
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
61
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Developed by the U.S. Navy to manage very complex projects
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
62
<strong>  A(n) _____ is any work that has a beginning and an end and requires the use of company resources such as people, time, or money.​</strong> A) benchmark B) activity C) milestone D) breakthrough
A(n) _____ is any work that has a beginning and an end and requires the use of company resources such as people, time, or money.​

A) benchmark
B) activity
C) milestone
D) breakthrough
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
63
<strong>  Program Evaluation Review Technique (PERT) is a _____ technique because it analyzes a large, complex project as a series of individual tasks.</strong> A) top-down B) bottom-up C) three-point estimate D) six-point estimate
Program Evaluation Review Technique (PERT) is a _____ technique because it analyzes a large, complex project as a series of individual tasks.

A) top-down
B) bottom-up
C) three-point estimate
D) six-point estimate
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
64
<strong>  A task that represents several activities is known as a _____.</strong> A) task group B) task name C) task review D) task ID
A task that represents several activities is known as a _____.

A) task group
B) task name
C) task review
D) task ID
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
65
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
A condition, restriction, or requirement that a system must satisfy
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
66
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Handles the administrative responsibilities for a development team
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
67
Briefly explain the tasks performed by a project manager.​
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
68
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Tasks that must be completed one after another
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
69
The _____ are time estimates made by project managers for a task.

A) best-case estimate
B) worst-case estimate
C) dominant-case estimate
D) probable-case estimate
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
70
Structured walk-throughs take place throughout the SDLC and are called _____ reviews, depending on the phase in which they occur.

A) technical
B) design
C) code
D) testing
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
71
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
An important value assigned to an estimate
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
72
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Usually a senior systems analyst or an IT department manager, if the project is large
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
73
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Tasks that must be completed before another task can start.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
74
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
The process of planning, scheduling, monitoring, and reporting on the development of an information system
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
75
Project managers typically perform the tasks of _____.​

A) project planning
B) project scheduling
C) project monitoring
D) project testing
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
76
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
Defines the tasks that can start at the same time
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
77
Define risk and give a basic list of risk management steps.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
78
Matching
Identify the letters of the choices that best match the phrases or definitions.​
a. ​Project management
b. ​Project coordinator
c. ​Project leader
d. ​Milestone
e. ​Constraint
f. Weight
g. Program Evaluation Review Technique (PERT)
h. dependent
i. Concurrent tasks
j. Predecessor tasks
A recognizable reference point that can be used to monitor progress and manage a project
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 78 flashcards in this deck.