Question
The organization and direction of other people to achieve a planned result within a predetermined schedule and budget is called what?

A)Project delivery management"
B)Project integration management"
C)Project human resource management"
D)Project management"
Use Space or
up arrow
down arrow
to flip the card.
Question
Projects are seldom initiated to solve immediate business problems.
Question
In Agile projects the easiest portions of the system are built in the first few iterations.
Question
Which of the following best describes the reason why projects fail?

A)Technological problems"
B)System is too complex"
C)Wrong development methodology"
D)Undefined project management practices"
Question
Which of the following is NOT one of the external responsibilities of a project manager?

A)Report project status"
B)Assess project risks"
C)Work with the client"
D)Identify resource needs"
Question
According to the CHAOS report for 2009 what is the percent of projects that can be considered completely successful?

A)44%"
B)32%"
C)24%"
D)60%"
Question
Which of the following statements best defines what a project is?

A)A planned activity consisting of defined tasks by a team of people."
B)A sequence of steps with a scheduled completion."
C)A set of procedures that must be completed in a timely fashion."
D)A planned undertaking with a start and stop and that produces a result."
Question
A good project manager focuses his energy on the success of the project team and allows the oversight committee to monitor and report project status.
Question
Since the Agile philosophy embraces change,project scope management is not important for Agile projects.
Question
It is usually impossible to make an accurate estimate of the time required to complete a development project.
Question
One important step in estimating the time required for a project is to try to identify all of the functional requirements of a the new system.
Question
With Agile Time Management scheduling is only done on a micro level and not a macro level.
Question
In adaptive,iterative projects there are usually two types of schedules created.
Question
In 2009 almost over two-thirds of all software development projects had serious problems with delivering satisfactory results on time.
Question
With Agile Cost Management it is important to control the costs,even more important than estimating the costs to get project approval.
Question
One of the responsibilities of the project manager in getting a project approved is to try to predict the value of business benefits.
Question
The final decision of project scope in an Agile project rests with the users.
Question
Agile project managers do not try to answer the question "How much will the project cost?"
Question
Ceremony refers to the official kick-off meeting to start a project.
Question
A major reason that software development projects to fail is due to poor project management.
Question
Usually the highest cost for the development and deployment of a new system is _____.

A)License fees for new software"
B)Salaries of the development team"
C)Computer and network equipment"
D)Data center costs"
Question
Which of the following principles of project management identifies all stakeholders?

A)Risk Management"
B)Communications Management"
C)Human Resource Management"
D)Time Management"
Question
When the project team asks "Are our working relationships with the user effective?" it is doing what?

A)An end of iteration review"
B)An end of project review"
C)A performance review"
D)A work breakdown structure"
Question
The time from the deployment of a new system until the break-even point is reached is sometimes called the ______.

A)investment period"
B)net present value"
C)return on investment"
D)payback period"
Question
Missing milestones on a project may be an indication of project that has high _______ risk.

A)Schedule"
B)Resource"
C)Deployment"
D)Technological"
Question
What technique is used to control the scope in an Agile project?

A)Not important to worry about scope."
B)Freeze the requirements in an early iteration."
C)Keep a prioritized list of required functions."
D)Let the client and the users worry about the scope."
Question
Which is NOT an activity associated with establishing the project environment?

A)Record and communicate project information."
B)Establish the working environment."
C)Establish team processes and procedures."
D)Identify staffing requirements."
Question
Which of the following is also called a steering committee?

A)Executive committee"
B)Strategic planning committee"
C)Project approval committee"
D)Oversight committee"
Question
The creation of a work breakdown structure is helpful in the development of what?

A)Software testing plan."
B)Project iteration schedule."
C)Detailed work schedule."
D)Detailed effort estimates of work tasks."
Question
The fear of using a computer (computer phobia)is a type of _______ risk.

A)Technological risk"
B)Resource (people) risk"
C)Organizational risk"
D)Deployment risk"
Question
A ____ combines three components: the problem description,the business benefits,and the system capabilities.

A)Project charter"
B)Proof-of-concept analysis"
C)System vision document"
D)System scope document"
Question
Which of the following is NOT a common question asked by the client before giving project approval?

A)How much will it cost?"
B)How long will it take?"
C)Who is the project manager?"
D)What are the benefits?"
Question
Which of the following is NOT one of the PMBOK knowledge areas?

A)Integration Management"
B)Documentation Management"
C)Risk Management"
D)Procurement Management"
Question
Which of the following is NOT a standard reason for initiating a system development project.

A)To respond to an opportunity"
B)To reduce staffing requirements"
C)To resolve a problem"
D)To respond to an external directive"
Question
Which of the following is NOT one of the internal responsibilities of a project manager?

A)Develop the project schedule"
B)Develop specifications"
C)Assign work to team members"
D)Monitor project milestones"
Question
Project Quality Management is different for Agile projects because they place heavy emphasis in what additional area?

A)The quality of the testing process."
B)The quality of the project processes."
C)The quality of the deliverables."
D)The quality of the team members."
Question
Which is NOT one of the primary areas for risk and feasibility analysis?

A)Organizational risks"
B)Deployment risks"
C)Schedule risks"
D)Resource risks"
Question
The net present value for a year is calculated by _______.

A)combining benefits and costs for a defined number of years"
B)applying the discount rate to the combination of benefits and costs"
C)determining when the benefits offset the costs"
D)applying the discount factor to the combination of benefits and costs"
Question
Estimating the effort required and identifying task dependencies is usually part of the work to create what?

A)The project iteration schedule"
B)The detailed work schedule"
C)The project time estimate"
D)The critical path"
Question
Which of the following is NOT one of the activities of the second core process to plan and monitor the project.

A)Establish the work environment"
B)Build work schedules"
C)Evaluate work processes"
D)Estimate the project length"
Question
The person or group that funds the project is called the _____ .
Question
The present value of $200,000 development costs in year 0 assuming a 10% discount rate is:

A)$180,000"
B)$190,000"
C)$200,000"
D)$210,000"
Question
Which is NOT a criterion that is used to determine how to define tasks for a work breakdown structure.

A)How to know when the task is complete."
B)How to estimate the effort required."
C)A logical way to determine its predecessor."
D)It should take one to five days."
Question
The _______ consists of clients and key manager who review the progress and direct the project.
Question
What is the term that describes the time period after which the dollar benefits have offset the dollar costs?
Question
The dollar value of benefits reduced by the dollar value of costs combined together and expressed in current dollars is called the ______.
Question
Which two of the following questions (decision points)are important when monitoring project progress?

A)Is the task on target?"
B)Is the task too large?"
C)Is the task clearly defined?"
D)Is the variance significant?"
E)Is the corrective action sufficient?"
F)Is the status complete?
Question
Which two of the following are activities belonging to the first core process?

A)Schedule the work"
B)Perform risk and feasibility analysis"
C)Choose the project manager"
D)Establish the project environment"
E)Evaluate the work processes"
F)Quantify project approval factors
Question
The term "____________________" refers to the organization and direction of other people to achieve a planned result within a predetermined schedule and budget.
Question
The person or group that work directly with the system are called _______ .
Question
Given a project schedule with all tasks connected with one-way arrows and task durations.The critical path is _____.

A)the longest path through the network"
B)the shortest path through the network"
C)neither the longest nor shortest path through the network"
D)it cannot be determined"
Question
Which of the following is NOT one of the activities associated with staffing the project team?

A)Conducting team-building exercises."
B)Developing a resource plan."
C)Organizing work groups."
D)Setting up programming rules and guidelines."
Question
Which two of the following activities belong to the second core process of planning and monitoring the project?

A)Establish the project environment"
B)Estimate the project cost"
C)Analyze project risk and feasibility"
D)Determine project scope"
E)Estimate the project length"
F)Staff and allocate resources
Question
The point in time at which dollar benefits offset the dollar costs is called the _______ .
Question
What is the name given to the process of comparing costs and benefits to see whether investing in a new system will be beneficial?
Question
The required functions and capabilities of the new system that are developed in order to get approval for the development project are called the _______.
Question
A project management guide and standard of fundamental project management principles is referred to as the _______.
Question
A document to help define the scope of the new system is called a _____.
Question
The level of formality of a project is often referred to as _______ .
Question
The benefits that accrue to an organization,usually measured in dollars,from the deployment of a new system are called ______.
Question
An increased level of customer satisfaction is an example of a(n)_______ benefit.
Question
List four primary areas that are considered in risk and feasibility analysis.
Question
List the four activities of the first core process: Identify the problem and obtain approval.
Question
List several (at least four)reasons why projects fail as determined by the CHAOS report.
Question
List several (at least four)of the internal responsibilities of a project manager.
Question
A bar chart that portrays the schedule by the length of horizontal bars is called a _______.
Question
List the three major external responsibilities of a project manager.
Question
List the nine areas of the Project Management Body of Knowledge.
Question
List the three steps required to develop a detailed schedule of the work to be done within an iteration.
Question
List the five activities of the second core process: Plan and monitor the project.
Question
The meeting held at the end of an iteration to determine what was successful and what can be improved is called what?
Question
List the three primary reasons for initiating a software development project.
Question
List three primary criteria to obtain approval for a project.These criteria are often three key questions asked by the client before giving approval.
Question
The hierarchical list of activities of a project that is used to create work schedule is called the _____.
Question
The sequence of tasks in a schedule that cannot be delayed without delaying the project is called the _______ .
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/75
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 9: Project Planning and Project Management
1
The organization and direction of other people to achieve a planned result within a predetermined schedule and budget is called what?

A)Project delivery management"
B)Project integration management"
C)Project human resource management"
D)Project management"
D
2
Projects are seldom initiated to solve immediate business problems.
False
3
In Agile projects the easiest portions of the system are built in the first few iterations.
False
4
Which of the following best describes the reason why projects fail?

A)Technological problems"
B)System is too complex"
C)Wrong development methodology"
D)Undefined project management practices"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following is NOT one of the external responsibilities of a project manager?

A)Report project status"
B)Assess project risks"
C)Work with the client"
D)Identify resource needs"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
6
According to the CHAOS report for 2009 what is the percent of projects that can be considered completely successful?

A)44%"
B)32%"
C)24%"
D)60%"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following statements best defines what a project is?

A)A planned activity consisting of defined tasks by a team of people."
B)A sequence of steps with a scheduled completion."
C)A set of procedures that must be completed in a timely fashion."
D)A planned undertaking with a start and stop and that produces a result."
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
8
A good project manager focuses his energy on the success of the project team and allows the oversight committee to monitor and report project status.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
9
Since the Agile philosophy embraces change,project scope management is not important for Agile projects.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
10
It is usually impossible to make an accurate estimate of the time required to complete a development project.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
11
One important step in estimating the time required for a project is to try to identify all of the functional requirements of a the new system.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
12
With Agile Time Management scheduling is only done on a micro level and not a macro level.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
13
In adaptive,iterative projects there are usually two types of schedules created.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
14
In 2009 almost over two-thirds of all software development projects had serious problems with delivering satisfactory results on time.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
15
With Agile Cost Management it is important to control the costs,even more important than estimating the costs to get project approval.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
16
One of the responsibilities of the project manager in getting a project approved is to try to predict the value of business benefits.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
17
The final decision of project scope in an Agile project rests with the users.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
18
Agile project managers do not try to answer the question "How much will the project cost?"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
19
Ceremony refers to the official kick-off meeting to start a project.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
20
A major reason that software development projects to fail is due to poor project management.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
21
Usually the highest cost for the development and deployment of a new system is _____.

A)License fees for new software"
B)Salaries of the development team"
C)Computer and network equipment"
D)Data center costs"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following principles of project management identifies all stakeholders?

A)Risk Management"
B)Communications Management"
C)Human Resource Management"
D)Time Management"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
23
When the project team asks "Are our working relationships with the user effective?" it is doing what?

A)An end of iteration review"
B)An end of project review"
C)A performance review"
D)A work breakdown structure"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
24
The time from the deployment of a new system until the break-even point is reached is sometimes called the ______.

A)investment period"
B)net present value"
C)return on investment"
D)payback period"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
25
Missing milestones on a project may be an indication of project that has high _______ risk.

A)Schedule"
B)Resource"
C)Deployment"
D)Technological"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
26
What technique is used to control the scope in an Agile project?

A)Not important to worry about scope."
B)Freeze the requirements in an early iteration."
C)Keep a prioritized list of required functions."
D)Let the client and the users worry about the scope."
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
27
Which is NOT an activity associated with establishing the project environment?

A)Record and communicate project information."
B)Establish the working environment."
C)Establish team processes and procedures."
D)Identify staffing requirements."
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following is also called a steering committee?

A)Executive committee"
B)Strategic planning committee"
C)Project approval committee"
D)Oversight committee"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
29
The creation of a work breakdown structure is helpful in the development of what?

A)Software testing plan."
B)Project iteration schedule."
C)Detailed work schedule."
D)Detailed effort estimates of work tasks."
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
30
The fear of using a computer (computer phobia)is a type of _______ risk.

A)Technological risk"
B)Resource (people) risk"
C)Organizational risk"
D)Deployment risk"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
31
A ____ combines three components: the problem description,the business benefits,and the system capabilities.

A)Project charter"
B)Proof-of-concept analysis"
C)System vision document"
D)System scope document"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following is NOT a common question asked by the client before giving project approval?

A)How much will it cost?"
B)How long will it take?"
C)Who is the project manager?"
D)What are the benefits?"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following is NOT one of the PMBOK knowledge areas?

A)Integration Management"
B)Documentation Management"
C)Risk Management"
D)Procurement Management"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following is NOT a standard reason for initiating a system development project.

A)To respond to an opportunity"
B)To reduce staffing requirements"
C)To resolve a problem"
D)To respond to an external directive"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following is NOT one of the internal responsibilities of a project manager?

A)Develop the project schedule"
B)Develop specifications"
C)Assign work to team members"
D)Monitor project milestones"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
36
Project Quality Management is different for Agile projects because they place heavy emphasis in what additional area?

A)The quality of the testing process."
B)The quality of the project processes."
C)The quality of the deliverables."
D)The quality of the team members."
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
37
Which is NOT one of the primary areas for risk and feasibility analysis?

A)Organizational risks"
B)Deployment risks"
C)Schedule risks"
D)Resource risks"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
38
The net present value for a year is calculated by _______.

A)combining benefits and costs for a defined number of years"
B)applying the discount rate to the combination of benefits and costs"
C)determining when the benefits offset the costs"
D)applying the discount factor to the combination of benefits and costs"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
39
Estimating the effort required and identifying task dependencies is usually part of the work to create what?

A)The project iteration schedule"
B)The detailed work schedule"
C)The project time estimate"
D)The critical path"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
40
Which of the following is NOT one of the activities of the second core process to plan and monitor the project.

A)Establish the work environment"
B)Build work schedules"
C)Evaluate work processes"
D)Estimate the project length"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
41
The person or group that funds the project is called the _____ .
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
42
The present value of $200,000 development costs in year 0 assuming a 10% discount rate is:

A)$180,000"
B)$190,000"
C)$200,000"
D)$210,000"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
43
Which is NOT a criterion that is used to determine how to define tasks for a work breakdown structure.

A)How to know when the task is complete."
B)How to estimate the effort required."
C)A logical way to determine its predecessor."
D)It should take one to five days."
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
44
The _______ consists of clients and key manager who review the progress and direct the project.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
45
What is the term that describes the time period after which the dollar benefits have offset the dollar costs?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
46
The dollar value of benefits reduced by the dollar value of costs combined together and expressed in current dollars is called the ______.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
47
Which two of the following questions (decision points)are important when monitoring project progress?

A)Is the task on target?"
B)Is the task too large?"
C)Is the task clearly defined?"
D)Is the variance significant?"
E)Is the corrective action sufficient?"
F)Is the status complete?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
48
Which two of the following are activities belonging to the first core process?

A)Schedule the work"
B)Perform risk and feasibility analysis"
C)Choose the project manager"
D)Establish the project environment"
E)Evaluate the work processes"
F)Quantify project approval factors
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
49
The term "____________________" refers to the organization and direction of other people to achieve a planned result within a predetermined schedule and budget.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
50
The person or group that work directly with the system are called _______ .
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
51
Given a project schedule with all tasks connected with one-way arrows and task durations.The critical path is _____.

A)the longest path through the network"
B)the shortest path through the network"
C)neither the longest nor shortest path through the network"
D)it cannot be determined"
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is NOT one of the activities associated with staffing the project team?

A)Conducting team-building exercises."
B)Developing a resource plan."
C)Organizing work groups."
D)Setting up programming rules and guidelines."
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
53
Which two of the following activities belong to the second core process of planning and monitoring the project?

A)Establish the project environment"
B)Estimate the project cost"
C)Analyze project risk and feasibility"
D)Determine project scope"
E)Estimate the project length"
F)Staff and allocate resources
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
54
The point in time at which dollar benefits offset the dollar costs is called the _______ .
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
55
What is the name given to the process of comparing costs and benefits to see whether investing in a new system will be beneficial?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
56
The required functions and capabilities of the new system that are developed in order to get approval for the development project are called the _______.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
57
A project management guide and standard of fundamental project management principles is referred to as the _______.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
58
A document to help define the scope of the new system is called a _____.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
59
The level of formality of a project is often referred to as _______ .
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
60
The benefits that accrue to an organization,usually measured in dollars,from the deployment of a new system are called ______.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
61
An increased level of customer satisfaction is an example of a(n)_______ benefit.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
62
List four primary areas that are considered in risk and feasibility analysis.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
63
List the four activities of the first core process: Identify the problem and obtain approval.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
64
List several (at least four)reasons why projects fail as determined by the CHAOS report.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
65
List several (at least four)of the internal responsibilities of a project manager.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
66
A bar chart that portrays the schedule by the length of horizontal bars is called a _______.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
67
List the three major external responsibilities of a project manager.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
68
List the nine areas of the Project Management Body of Knowledge.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
69
List the three steps required to develop a detailed schedule of the work to be done within an iteration.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
70
List the five activities of the second core process: Plan and monitor the project.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
71
The meeting held at the end of an iteration to determine what was successful and what can be improved is called what?
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
72
List the three primary reasons for initiating a software development project.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
73
List three primary criteria to obtain approval for a project.These criteria are often three key questions asked by the client before giving approval.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
74
The hierarchical list of activities of a project that is used to create work schedule is called the _____.
Unlock Deck
Unlock for access to all 75 flashcards in this deck.
Unlock Deck
k this deck
75
The sequence of tasks in a schedule that cannot be delayed without delaying the project is called the _______ .