Deck 4: Periodic Testing

Full screen (f)
exit full mode
Question
3 documents on which the value of PFC should be recorded are?

A) Minor works certificate, Schedule of inspections, Schedule of test results
B) Minor works certificate, condition report schedule of inspections, Condition report schedule of test results
C) Electrical installation certificate, Electrical installation condition report, Generic Schedule of test results
D) Condition report inspection schedule, Electrical installation inspection schedule, Generic schedule of test results
Use Space or
up arrow
down arrow
to flip the card.
Question
Under which condition should a minor works certificate not be issued

A) Addition of a lighting point to an existing circuit
B) Replacement of a one way switch with a dimmer switch
C) Replacement of an existing socket outlet with an RCD protected socket
D) Replacement of a circuit breaker with an RCBO
Question
One statutory and two non statutory documents relating to the inspection and testing process for an electrical installation are?

A) GS 38, BS 7671 and GN3
B) EAWR 1989, HASWA 1974, GS 38
C) ESQCR 2002, EAWR 1989, BS7671
D) EAWR 1989, BS7671, GN3
Question
The human sense which would be most suitable for identifying an overloaded electric motor would be

A) Smell
B) Sight
C) Touch
D) Hearing
Question
A periodic inspection is to be carried out on the electrical installation in a shoe shop, what must be agreed with the client and recorded on the electrical installation condition report?

A) The cost of the work to be carried out
B) The duration of the work
C) Extent and limitations
D) Number of people carrying out the inspection
Question
Two methods which can be used to carry out continuity of circuit protective conductors which are not completely visible are

A) Method 1 (R1 + R2), and method 2 (long lead)
B) Visual inspection and long lead method
C) Method 1 and method 3
D) Visual and R1 + R2 method
Question
One consideration regarding test leads when carrying out a ring circuit test is

A) Leads comply with GS 38
B) The leads must be nulled or the resistance subtracted from the test result
C) Leads must be correctly coloured
D) They must be manufactured by the same company as the test instrument
Question
When conducting an earth fault loop impedance test on a final circuit

A) The leads must be nulled
B) The installation must be isolated and the earthing conductor disconnected
C) The earthing conductor must be disconnected and the installation energised
D) The earthing conductor must be connected and the circuit energised
Question
Three checks which must be carried out on an electrical installation before an installation resistance test is carried out on it are

A) Installation isolated, lamps removed, switches open
B) Lamps removed, installation energised and dimmers bypassed
C) Installation energised, all lamps in place and switches closed
D) Switches closed, installation isolated and lamps removed
Question
When carrying out a ring final circuit test the measured value of stages 2 and 3 are lower than the measured value of stage 1 because

A) The conductors are connected in parallel
B) The conductors are disconnected
C) The conductors are incorrectly connected
D) The cpc and the line conductors are the same size
Question
r2 is sometimes proportionally higher than r1 and rn because

A) It is longer
B) It has a larger cross sectional area
C) It has a smaller cross sectional area
D) It has been connected into the wrong terminal
Question
The best method of carrying out an insulation test on a circuit containing a dimmer switch which cannot be removed is to

A) Turn the switch off
B) Test between live conductors only
C) Carry out the test using a low resistance ohmmeter
D) Test between live conductors joined and earth
Question
IPXXB is the IP code for

A) A 12.5mm diameter hole
B) Standard finger protection
C) A 1mm diameter hole
D) Protection from ingress of dust
Question
When an IP code contains an X as the second number is means that

A) The hole must be completely blocked up
B) Nothing is specified for dust
C) Nothing is specified for liquids
D) It is waterproof
Question
When conducting a polarity test on a lighting circuit, it must be verified that

A) The switch is in the line conductor
B) The switch line is correctly identified
C) The switch is the right way up
D) The correct rating of protective device has been used
Question
Where a 300mA rcd to BS EN 61008 has been used for fire protection the following sequence of tests must be carried out to prove its correct operation

A) x1/2 x1 and x5
B) 150mA, 300mA and 1500mA
C) Operate the test button, 150mA and 300mA
D) 150mA, 300mA, operate the test button
Question
The maximum test current to be applied to a 100 mA rcd when it is being tested is

A) 0.1A
B) 0.01A
C) 500mA
D) 50mA
Question
The most suitable test instrument used to carry out a test on an earth electrode which is to be used for a generator is

A) An earth fault loop impedance tester
B) A high current tester
C) A low resistance ohmmeter
D) An earth electrode tester
Question
The recommended frequency for the inspection of privately owned domestic accommodation as given in GN3 is

A) 5 years
B) 10 years
C) 3 years
D) 7 years
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/19
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Periodic Testing
1
3 documents on which the value of PFC should be recorded are?

A) Minor works certificate, Schedule of inspections, Schedule of test results
B) Minor works certificate, condition report schedule of inspections, Condition report schedule of test results
C) Electrical installation certificate, Electrical installation condition report, Generic Schedule of test results
D) Condition report inspection schedule, Electrical installation inspection schedule, Generic schedule of test results
C
2
Under which condition should a minor works certificate not be issued

A) Addition of a lighting point to an existing circuit
B) Replacement of a one way switch with a dimmer switch
C) Replacement of an existing socket outlet with an RCD protected socket
D) Replacement of a circuit breaker with an RCBO
D
3
One statutory and two non statutory documents relating to the inspection and testing process for an electrical installation are?

A) GS 38, BS 7671 and GN3
B) EAWR 1989, HASWA 1974, GS 38
C) ESQCR 2002, EAWR 1989, BS7671
D) EAWR 1989, BS7671, GN3
D
4
The human sense which would be most suitable for identifying an overloaded electric motor would be

A) Smell
B) Sight
C) Touch
D) Hearing
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
5
A periodic inspection is to be carried out on the electrical installation in a shoe shop, what must be agreed with the client and recorded on the electrical installation condition report?

A) The cost of the work to be carried out
B) The duration of the work
C) Extent and limitations
D) Number of people carrying out the inspection
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
6
Two methods which can be used to carry out continuity of circuit protective conductors which are not completely visible are

A) Method 1 (R1 + R2), and method 2 (long lead)
B) Visual inspection and long lead method
C) Method 1 and method 3
D) Visual and R1 + R2 method
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
7
One consideration regarding test leads when carrying out a ring circuit test is

A) Leads comply with GS 38
B) The leads must be nulled or the resistance subtracted from the test result
C) Leads must be correctly coloured
D) They must be manufactured by the same company as the test instrument
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
8
When conducting an earth fault loop impedance test on a final circuit

A) The leads must be nulled
B) The installation must be isolated and the earthing conductor disconnected
C) The earthing conductor must be disconnected and the installation energised
D) The earthing conductor must be connected and the circuit energised
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
9
Three checks which must be carried out on an electrical installation before an installation resistance test is carried out on it are

A) Installation isolated, lamps removed, switches open
B) Lamps removed, installation energised and dimmers bypassed
C) Installation energised, all lamps in place and switches closed
D) Switches closed, installation isolated and lamps removed
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
10
When carrying out a ring final circuit test the measured value of stages 2 and 3 are lower than the measured value of stage 1 because

A) The conductors are connected in parallel
B) The conductors are disconnected
C) The conductors are incorrectly connected
D) The cpc and the line conductors are the same size
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
11
r2 is sometimes proportionally higher than r1 and rn because

A) It is longer
B) It has a larger cross sectional area
C) It has a smaller cross sectional area
D) It has been connected into the wrong terminal
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
12
The best method of carrying out an insulation test on a circuit containing a dimmer switch which cannot be removed is to

A) Turn the switch off
B) Test between live conductors only
C) Carry out the test using a low resistance ohmmeter
D) Test between live conductors joined and earth
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
13
IPXXB is the IP code for

A) A 12.5mm diameter hole
B) Standard finger protection
C) A 1mm diameter hole
D) Protection from ingress of dust
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
14
When an IP code contains an X as the second number is means that

A) The hole must be completely blocked up
B) Nothing is specified for dust
C) Nothing is specified for liquids
D) It is waterproof
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
15
When conducting a polarity test on a lighting circuit, it must be verified that

A) The switch is in the line conductor
B) The switch line is correctly identified
C) The switch is the right way up
D) The correct rating of protective device has been used
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
16
Where a 300mA rcd to BS EN 61008 has been used for fire protection the following sequence of tests must be carried out to prove its correct operation

A) x1/2 x1 and x5
B) 150mA, 300mA and 1500mA
C) Operate the test button, 150mA and 300mA
D) 150mA, 300mA, operate the test button
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
17
The maximum test current to be applied to a 100 mA rcd when it is being tested is

A) 0.1A
B) 0.01A
C) 500mA
D) 50mA
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
18
The most suitable test instrument used to carry out a test on an earth electrode which is to be used for a generator is

A) An earth fault loop impedance tester
B) A high current tester
C) A low resistance ohmmeter
D) An earth electrode tester
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
19
The recommended frequency for the inspection of privately owned domestic accommodation as given in GN3 is

A) 5 years
B) 10 years
C) 3 years
D) 7 years
Unlock Deck
Unlock for access to all 19 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 19 flashcards in this deck.