Question
An appropriate wiring method for a high-temperature installation in a boiler house is:

A) metal conduit installation
B) trunking and tray installation
C) FP200 cables
D) MI cables.
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following fixing methods would be suitable for securing a heavy electric motor to a concrete bed?

A) cable clip
B) Rawlbolt
C) screw fixing to plastic plug
D) spring toggle.
Question
Which of the following fixing methods would be suitable for holding a PVC insulated and sheathed cable onto a wood surface such as a ceiling joist?

A) cable clip
B) Rawlbolt
C) screw fixing to plastic plug
D) spring toggle.
Question
Which of the following fixing methods would be suitable for holding a medium-weight load onto a brick wall?

A) cable clip
B) Rawlbolt
C) screw fixing to plastic plug
D) spring toggle.
Question
Which of the following fixing methods would be suitable for holding a lightweight load on a plasterboard partition?

A) cable clip
B) Rawlbolt
C) screw fixing to plastic plug
D) spring toggle.
Question
A PVC conduit installation would be suitable for the following type of installation:

A) commercial
B) domestic
C) horticultural
D) industrial.
Question
A PVC insulated and sheathed wiring system would be suitable for the following type of installation:

A) commercial
B) domestic
C) horticultural
D) industrial.
Question
The protection provided by protective equipotential bonding and automatic disconnection of the supply is called:

A) overload protection
B) short-circuit protection
C) basic protection
D) fault protection.
Question
The protection provided by insulating the live parts of the electrical installation is called:

A) overload protection
B) short-circuit protection
C) basic protection
D) fault protection.
Question
The gas, water and central heating pipes of the building not forming a part of the electrical installation are called:

A) earth conductors
B) bonding conductors
C) exposed conductive parts
D) extraneous conductive parts.
Question
The conduit and trunking parts of the electrical installation are:

A) earth conductors
B) bonding conductors
C) exposed conductive parts
D) extraneous conductive parts.
Question
The linking together of the exposed or extraneous conductive parts of an installation for the purpose of safety is one definition of:

A) earthing
B) protective equipotential bonding
C) exposed conductive parts
D) extraneous conductive parts.
Question
The connection of the exposed conductive parts of an installation to the main protective earthing terminal of the installation is one definition of:

A) earthing
B) protective equipotential bonding
C) overload
D) short circuit.
Question
A scale drawing which shows the original intention for the position of electrical equipment is called a:

A) wiring diagram
B) detail assembly drawing
C) site plan or layout drawing
D) as-fitted drawing.
Question
A scale drawing which shows the actual position of the electrical equipment upon completion of the contract is called a:

A) wiring diagram
B) detail assembly drawing
C) site plan or layout drawing
D) as-fitted drawing.
Question
A steel trunking installation would be suitable for the following type of installation:

A) commercial
B) domestic
C) horticultural
D) industrial.
Question
A steel conduit installation would be suitable for the following type of installation:

A) commercial
B) domestic
C) horticultural
D) industrial.
Question
Electricity is distributed from the local substations by underground cables at:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Question
Electricity is transmitted at very high voltages because for a given power the:

A) current is reduced
B) current is increased
C) losses are reduced
D) losses are increased.
Question
An appropriate wiring system for a three-phase industrial installation would be:

A) PVC cables
B) PVC conduit
C) one which meets the requirements of Part 2 of the IET Regulations
D) one which meets the requirements of Part 5 of the IET Regulations
Question
The cables suspended from the transmission towers of the National Grid network are made from:

A) aluminium and porcelain.
B) copper and brass
C) copper with PVC insulation
D) aluminium and steel
Question
An appropriate wiring method for an underground feed to a remote building would be a:

A) metal conduit installation
B) trunking and tray installation
C) PVC cables
D) PVC/SWA cables
Question
An appropriate wiring method for a domestic installation would be a:

A) metal conduit installation
B) trunking and tray installation
C) PVC cables
D) PVC/SWA cables
Question
An electrical cable is made up of three parts which are:

A) conduction, convection and radiation
B) conductor, insulation and outer sheath
C) heating, magnetic and chemical
D) conductors and insulators.
Question
A diagram which shows most clearly how a circuit works, with all items represented by graphical symbols, is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
Question
A diagram which shows the detailed connections between individual items of equipment is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
Question
A scale drawing showing the position of equipment by graphical symbols is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
Question
An over-current resulting from a fault of negligible impedance is one definition of:

A) earthing
B) bonding
C) overload
D) short circuit.
Question
A current which exceeds the rated value in an otherwise healthy circuit is one definition of:

A) earthing
B) bonding
C) overload
D) short circuit.
Question
An appropriate wiring system for a three-phase industrial installation would be:

A) PVC cables
B) PVC conduit
C) one which meets the requirements of Part 2 of the IET Regulations
D) one which meets the requirements of Part 5 of the IET Regulations
Question
According to IET Regulation 411.3.2.2 all final circuits not exceeding 32 A in a building supplied with a 230 V TN supply shall have a maximum disconnection time not exceeding:

A) 0.2 s
B) 0.4 s
C) 5.0 s
D) unlimited.
Question
The weakest link in the circuit designed to melt when an over-current flows is one definition of:

A) fault protection
B) a circuit protective conductor
C) a fuse
D) a consumer unit.
Question
A current which exceeds the rated current in an otherwise healthy circuit is one definition of:

A) fault protection
B) an over-current
C) an overload current
D) a short-circuit current.
Question
Cutting off the electrical supply in order to ensure the safety of those working on the equipment is one definition of:

A) basic protection
B) fault protection
C) equipotential bonding
D) isolation switching.
Question
The protection provided by equipotential bonding and automatic disconnection of the supply is called:

A) extraneous conductive parts
B) basic protection
C) exposed conductive parts
D) fault protection.
Question
The metalwork of the building and other service pipes is called:

A) extraneous conductive parts
B) basic protection
C) exposed conductive parts
D) fault protection.
Question
The metalwork of the electrical installation is called:

A) extraneous conductive parts
B) basic protection
C) exposed conductive parts
D) fault protection.
Question
The protection provided by insulating live parts is called:

A) extraneous conductive parts
B) basic protection
C) exposed conductive parts
D) fault protection.
Question
The act of linking together the exposed and extraneous metal parts is called:

A) earthing
B) bonding
C) basic protection
D) fault protection.
Question
The act of connecting the exposed conductive parts of the installation to the main earthing terminal of the installation is called:

A) earth
B) earthing
C) bonding conductor
D) circuit protective conductor.
Question
A protective conductor connecting exposed and extraneous parts together is one definition of:

A) earth
B) earthing
C) bonding conductor
D) circuit protective conductor.
Question
A protective conductor connecting exposed conductive parts of equipment to the main earthing terminal is one definition of:

A) earth
B) earthing
C) bonding conductor
D) circuit protective conductor.
Question
To ensure the effective operation of the over-current protective devices, the earth fault loop path must have:

A) a 230 V supply
B) a very low resistance
C) fuses or MCBs in the live conductor
D) a very high resistance
Question
Electricity is generated in large commercial power-stations at:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Question
The cables suspended from the transmission towers of the National Grid network are made from:

A) copper and brass
B) copper with PVC insulation
C) aluminium and steel
D) aluminium and porcelain.
Question
An appropriate wiring method for a high-temperature installation in a boiler house is:

A) metal conduit installation
B) trunking and tray installation
C) FP 200 cables
D) MI cables.
Question
An appropriate wiring method for an underground feed to a remote building would be a:

A) metal conduit installation
B) trunking and tray installation
C) PVC cables
D) PVC/SWA cables.
Question
An appropriate wiring method for a domestic installation would be a:

A) metal conduit installation
B) trunking and tray installation
C) PVC cables
D) PVC/SWA cables.
Question
An electrical cable is made up of three parts which are:

A) conduction, convection and radiation
B) conductor, insulation and outer sheath
C) heating, magnetic and chemical
D) conductors and insulators.
Question
The phase current of a delta-connected load is 100 A. The line current will be:

A) 57.73 A
B) 101 A
C) 173.2 A
D) 231 A.
Question
The phase current of a star-connected load is 100 A. The line current will be:

A) 57.73 A
B) 100 A
C) 173.2 A
D) 230 A.
Question
The phase voltage of a delta-connected load is 100 V. The line voltage will be:

A) 57.73 V
B) 101 V
C) 173.2 V
D) 231 V.
Question
The phase voltage of a star-connected load is 100 V. The line voltage will be:

A) 57.73 V
B) 100 V
C) 173.2 V
D) 230 V.
Question
A load connected to phase and neutral of a star-connected three-phase four-wire supply system from the local substation would have a voltage of:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Question
A load connected to the three phases of a star-connected three-phase fourwire supply system from the local substation would have a voltage of:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Question
Transmission of electricity on the National Grid network takes place at:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Question
'The conductive mass of the earth' is one definition of:

A) earth
B) earthing
C) bonding conductor
D) circuit protective conductor.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/57
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Principles of Electrical Science
1
An appropriate wiring method for a high-temperature installation in a boiler house is:

A) metal conduit installation
B) trunking and tray installation
C) FP200 cables
D) MI cables.
FP200 cables
MI cables.
2
Which of the following fixing methods would be suitable for securing a heavy electric motor to a concrete bed?

A) cable clip
B) Rawlbolt
C) screw fixing to plastic plug
D) spring toggle.
Rawlbolt
3
Which of the following fixing methods would be suitable for holding a PVC insulated and sheathed cable onto a wood surface such as a ceiling joist?

A) cable clip
B) Rawlbolt
C) screw fixing to plastic plug
D) spring toggle.
cable clip
4
Which of the following fixing methods would be suitable for holding a medium-weight load onto a brick wall?

A) cable clip
B) Rawlbolt
C) screw fixing to plastic plug
D) spring toggle.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following fixing methods would be suitable for holding a lightweight load on a plasterboard partition?

A) cable clip
B) Rawlbolt
C) screw fixing to plastic plug
D) spring toggle.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
6
A PVC conduit installation would be suitable for the following type of installation:

A) commercial
B) domestic
C) horticultural
D) industrial.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
7
A PVC insulated and sheathed wiring system would be suitable for the following type of installation:

A) commercial
B) domestic
C) horticultural
D) industrial.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
8
The protection provided by protective equipotential bonding and automatic disconnection of the supply is called:

A) overload protection
B) short-circuit protection
C) basic protection
D) fault protection.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
9
The protection provided by insulating the live parts of the electrical installation is called:

A) overload protection
B) short-circuit protection
C) basic protection
D) fault protection.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
10
The gas, water and central heating pipes of the building not forming a part of the electrical installation are called:

A) earth conductors
B) bonding conductors
C) exposed conductive parts
D) extraneous conductive parts.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
11
The conduit and trunking parts of the electrical installation are:

A) earth conductors
B) bonding conductors
C) exposed conductive parts
D) extraneous conductive parts.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
12
The linking together of the exposed or extraneous conductive parts of an installation for the purpose of safety is one definition of:

A) earthing
B) protective equipotential bonding
C) exposed conductive parts
D) extraneous conductive parts.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
13
The connection of the exposed conductive parts of an installation to the main protective earthing terminal of the installation is one definition of:

A) earthing
B) protective equipotential bonding
C) overload
D) short circuit.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
14
A scale drawing which shows the original intention for the position of electrical equipment is called a:

A) wiring diagram
B) detail assembly drawing
C) site plan or layout drawing
D) as-fitted drawing.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
15
A scale drawing which shows the actual position of the electrical equipment upon completion of the contract is called a:

A) wiring diagram
B) detail assembly drawing
C) site plan or layout drawing
D) as-fitted drawing.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
16
A steel trunking installation would be suitable for the following type of installation:

A) commercial
B) domestic
C) horticultural
D) industrial.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
17
A steel conduit installation would be suitable for the following type of installation:

A) commercial
B) domestic
C) horticultural
D) industrial.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
18
Electricity is distributed from the local substations by underground cables at:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
19
Electricity is transmitted at very high voltages because for a given power the:

A) current is reduced
B) current is increased
C) losses are reduced
D) losses are increased.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
20
An appropriate wiring system for a three-phase industrial installation would be:

A) PVC cables
B) PVC conduit
C) one which meets the requirements of Part 2 of the IET Regulations
D) one which meets the requirements of Part 5 of the IET Regulations
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
21
The cables suspended from the transmission towers of the National Grid network are made from:

A) aluminium and porcelain.
B) copper and brass
C) copper with PVC insulation
D) aluminium and steel
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
22
An appropriate wiring method for an underground feed to a remote building would be a:

A) metal conduit installation
B) trunking and tray installation
C) PVC cables
D) PVC/SWA cables
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
23
An appropriate wiring method for a domestic installation would be a:

A) metal conduit installation
B) trunking and tray installation
C) PVC cables
D) PVC/SWA cables
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
24
An electrical cable is made up of three parts which are:

A) conduction, convection and radiation
B) conductor, insulation and outer sheath
C) heating, magnetic and chemical
D) conductors and insulators.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
25
A diagram which shows most clearly how a circuit works, with all items represented by graphical symbols, is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
26
A diagram which shows the detailed connections between individual items of equipment is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
27
A scale drawing showing the position of equipment by graphical symbols is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
28
An over-current resulting from a fault of negligible impedance is one definition of:

A) earthing
B) bonding
C) overload
D) short circuit.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
29
A current which exceeds the rated value in an otherwise healthy circuit is one definition of:

A) earthing
B) bonding
C) overload
D) short circuit.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
30
An appropriate wiring system for a three-phase industrial installation would be:

A) PVC cables
B) PVC conduit
C) one which meets the requirements of Part 2 of the IET Regulations
D) one which meets the requirements of Part 5 of the IET Regulations
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
31
According to IET Regulation 411.3.2.2 all final circuits not exceeding 32 A in a building supplied with a 230 V TN supply shall have a maximum disconnection time not exceeding:

A) 0.2 s
B) 0.4 s
C) 5.0 s
D) unlimited.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
32
The weakest link in the circuit designed to melt when an over-current flows is one definition of:

A) fault protection
B) a circuit protective conductor
C) a fuse
D) a consumer unit.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
33
A current which exceeds the rated current in an otherwise healthy circuit is one definition of:

A) fault protection
B) an over-current
C) an overload current
D) a short-circuit current.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
34
Cutting off the electrical supply in order to ensure the safety of those working on the equipment is one definition of:

A) basic protection
B) fault protection
C) equipotential bonding
D) isolation switching.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
35
The protection provided by equipotential bonding and automatic disconnection of the supply is called:

A) extraneous conductive parts
B) basic protection
C) exposed conductive parts
D) fault protection.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
36
The metalwork of the building and other service pipes is called:

A) extraneous conductive parts
B) basic protection
C) exposed conductive parts
D) fault protection.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
37
The metalwork of the electrical installation is called:

A) extraneous conductive parts
B) basic protection
C) exposed conductive parts
D) fault protection.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
38
The protection provided by insulating live parts is called:

A) extraneous conductive parts
B) basic protection
C) exposed conductive parts
D) fault protection.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
39
The act of linking together the exposed and extraneous metal parts is called:

A) earthing
B) bonding
C) basic protection
D) fault protection.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
40
The act of connecting the exposed conductive parts of the installation to the main earthing terminal of the installation is called:

A) earth
B) earthing
C) bonding conductor
D) circuit protective conductor.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
41
A protective conductor connecting exposed and extraneous parts together is one definition of:

A) earth
B) earthing
C) bonding conductor
D) circuit protective conductor.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
42
A protective conductor connecting exposed conductive parts of equipment to the main earthing terminal is one definition of:

A) earth
B) earthing
C) bonding conductor
D) circuit protective conductor.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
43
To ensure the effective operation of the over-current protective devices, the earth fault loop path must have:

A) a 230 V supply
B) a very low resistance
C) fuses or MCBs in the live conductor
D) a very high resistance
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
44
Electricity is generated in large commercial power-stations at:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
45
The cables suspended from the transmission towers of the National Grid network are made from:

A) copper and brass
B) copper with PVC insulation
C) aluminium and steel
D) aluminium and porcelain.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
46
An appropriate wiring method for a high-temperature installation in a boiler house is:

A) metal conduit installation
B) trunking and tray installation
C) FP 200 cables
D) MI cables.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
47
An appropriate wiring method for an underground feed to a remote building would be a:

A) metal conduit installation
B) trunking and tray installation
C) PVC cables
D) PVC/SWA cables.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
48
An appropriate wiring method for a domestic installation would be a:

A) metal conduit installation
B) trunking and tray installation
C) PVC cables
D) PVC/SWA cables.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
49
An electrical cable is made up of three parts which are:

A) conduction, convection and radiation
B) conductor, insulation and outer sheath
C) heating, magnetic and chemical
D) conductors and insulators.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
50
The phase current of a delta-connected load is 100 A. The line current will be:

A) 57.73 A
B) 101 A
C) 173.2 A
D) 231 A.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
51
The phase current of a star-connected load is 100 A. The line current will be:

A) 57.73 A
B) 100 A
C) 173.2 A
D) 230 A.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
52
The phase voltage of a delta-connected load is 100 V. The line voltage will be:

A) 57.73 V
B) 101 V
C) 173.2 V
D) 231 V.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
53
The phase voltage of a star-connected load is 100 V. The line voltage will be:

A) 57.73 V
B) 100 V
C) 173.2 V
D) 230 V.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
54
A load connected to phase and neutral of a star-connected three-phase four-wire supply system from the local substation would have a voltage of:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
55
A load connected to the three phases of a star-connected three-phase fourwire supply system from the local substation would have a voltage of:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
56
Transmission of electricity on the National Grid network takes place at:

A) 230 V
B) 400 V
C) 25 kV
D) 132 kV.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
57
'The conductive mass of the earth' is one definition of:

A) earth
B) earthing
C) bonding conductor
D) circuit protective conductor.
Unlock Deck
Unlock for access to all 57 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 57 flashcards in this deck.