Deck 3: Software Development and Project Management
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/25
Play
Full screen (f)
Deck 3: Software Development and Project Management
1
__________ relates to the physical resources used when the software is executed.
A)functionality.
B)maintainability.
C)reliability.
D)efficiency.
A)functionality.
B)maintainability.
C)reliability.
D)efficiency.
efficiency.
2
Recruitment and training cost falls under _______ cost.
A)developmental.
B)data.
C)profit
D)setup.
A)developmental.
B)data.
C)profit
D)setup.
setup.
3
________ are commonly published as lists or charts.
A)resources.
B)work plans.
C)study plans.
D)budgets.
A)resources.
B)work plans.
C)study plans.
D)budgets.
work plans.
4
Which type of risk factor is most likely to cause problems for a software project developing commercial software?
A)inadequate user documentation.
B)litigation expense.
C)low productivity.
D)cancellation of project.
A)inadequate user documentation.
B)litigation expense.
C)low productivity.
D)cancellation of project.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
Defect prevention is defined as ____________.
A)finding and fixing errors after insertion.
B)finding and fixing errors before release but after insertion.
C)finding and fixing errors after release.
D)avoiding defect insertion.
A)finding and fixing errors after insertion.
B)finding and fixing errors before release but after insertion.
C)finding and fixing errors after release.
D)avoiding defect insertion.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
CPM is an acronym for _______.
A)control path method.
B)critical path method.
C)cohesion path method.
D)control path model.
A)control path method.
B)critical path method.
C)cohesion path method.
D)control path model.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
The time by which an activity may be delayed without affecting any subsequent activity is called _________.
A)action float.
B)terminal float.
C)free float
D)null float
A)action float.
B)terminal float.
C)free float
D)null float
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
The objective of ________ is to avoid or minimize the adverse effects of unforeseen events.
A)risk management.
B)risk maintenance.
C)risk taking.
D)risky job.
A)risk management.
B)risk maintenance.
C)risk taking.
D)risky job.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
Which form of software development model is most suited to a systemwhere all the requirements are known at the start of a project and remainstable throughout the project?
A)waterfall model.
B)incremental model.
C)evolutionary model.
D)spiral model.
A)waterfall model.
B)incremental model.
C)evolutionary model.
D)spiral model.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
__________ relates to the ability of the software to be transferred to a different environment.
A)portability.
B)maintainability.
C)reliability.
D)efficiency.
A)portability.
B)maintainability.
C)reliability.
D)efficiency.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is NOT part of a software quality assurance plan?
A)reference documents.
B)configuration action.
C)supplier control.
D)customer control.
A)reference documents.
B)configuration action.
C)supplier control.
D)customer control.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
Who is NOT usually present in a technical review?
A)user.
B)quality engineer.
C)the programming tools supplier.
D)specialist with knowledge of the application.
A)user.
B)quality engineer.
C)the programming tools supplier.
D)specialist with knowledge of the application.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
The expectancy theory of motivation will focus on ________.
A)instrumentality.
B)reliability.
C)reward.
D)assignment specification.
A)instrumentality.
B)reliability.
C)reward.
D)assignment specification.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
Herzberg's theory is ________.
A)3-factor theory.
B)6-factor theory.
C)2-factor theory.
D)1-factor theory.
A)3-factor theory.
B)6-factor theory.
C)2-factor theory.
D)1-factor theory.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
The saying "Cannot see the wood for the trees" is associated with ______.
A)information superhighway.
B)information overload.
C)information under load.
D)assumption.
A)information superhighway.
B)information overload.
C)information under load.
D)assumption.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
Closing the project involves _______.
A)identifying next project.
B)identifying the future ventures.
C)identifying the faults.
D)identifying follow-on actions.
A)identifying next project.
B)identifying the future ventures.
C)identifying the faults.
D)identifying follow-on actions.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
Ensuring that all the loose ends of a project are tied up is called as ___________.
A)demanding.
B)decomposing.
C)determining.
D)decommissioning.
A)demanding.
B)decomposing.
C)determining.
D)decommissioning.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
A Quality specification is otherwise known as ____________.
A)allocation specification.
B)alternate specification.
C)attribute specification.
D)assignment specification.
A)allocation specification.
B)alternate specification.
C)attribute specification.
D)assignment specification.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
USDP means ________.
A)unified software development process
B)uniform software development process
C)union software development process
D)union software deployment process
A)unified software development process
B)uniform software development process
C)union software development process
D)union software deployment process
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
The percentage of a particular time interval that a system is usable is called _____.
A)time interval.
B)availability.
C)utility.
D)mean time.
A)time interval.
B)availability.
C)utility.
D)mean time.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
BS EN ISO 9001:2000 is a _____.
A)external standard.
B)internal standard.
C)cmm standard.
D)tuv standard
A)external standard.
B)internal standard.
C)cmm standard.
D)tuv standard
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
CMM is acronym of __________.
A)capability maturity model.
B)calculative maturity model.
C)collaborative maturity model.
D)continuous maturity model.
A)capability maturity model.
B)calculative maturity model.
C)collaborative maturity model.
D)continuous maturity model.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
The inspection is led by ________, who has had specific training in the technique.
A)an evaluator.
B)a testing professional.
C)a moderator.
D)a reader.
A)an evaluator.
B)a testing professional.
C)a moderator.
D)a reader.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
Clean-room software development is created by _______.
A)henry mills.
B)henry ford.
C)john mills.
D)harlan mills.
A)henry mills.
B)henry ford.
C)john mills.
D)harlan mills.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
_________ is a technique particularly associated with quality circles.
A)quality plans.
B)fire- fighting.
C)quality checking.
D)brain storming.
A)quality plans.
B)fire- fighting.
C)quality checking.
D)brain storming.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck