Deck 4: Software Development and Design

Full screen (f)
exit full mode
Question
_________ assesses the quality of a software product.

A)acquirers.
B)developers.
C)independent evaluators.
D)software designers.
Use Space or
up arrow
down arrow
to flip the card.
Question
In PRINCE 2, 2 is meant for ______.

A)number of clients.
B)number of standards.
C)version.
D)edition.
Question
________ is needed to ensure that the project remains under control and that it continues to meet its business justification.

A)yellow tape.
B)white tape.
C)red tape.
D)black tape.
Question
Cost Benefit Analysis is done for ___________ feasibility.

A)social
B)technical.
C)process.
D)economical.
Question
_______ is classified into Functional and Non-functional.

A)project.
B)requirements.
C)start date. .
D)risk
Question
________ is some thing that is described by a set of attributes (data items) and that will be manipulated within the software (system).

A)instance.
B)class.
C)object.
D)data.
Question
A _________ contains a set of attributes that act as an aspect, quality, characteristic, or descriptor of the object.

A)ordinary object.
B)data object.
C)template.
D)instance.
Question
________ is the diagrammatic form for Flow oriented Modelling.

A)functional diagrams.
B)er diagrams.
C)data flow diagrams.
D)system flow diagrams.
Question
_________ is the sub-characteristics of efficiency.

A)understandability.
B)learnability.
C)resource utilization.
D)accuracy.
Question
Level 0 data flow diagrams are otherwise known as _______ .

A)functional diagrams.
B)er diagrams.
C)data flow diagrams.
D)context flow diagrams.
Question
_______ refers to the ability of the software to interact with other systems.

A)interoperability.
B)reliability.
C)functionality.
D)efficiency.
Question
_______ is a modular building block for computer software.

A)control.
B)flow.
C)process.
D)component.
Question
A ________ specification is concerned with how much is to spent on the system.

A)functional.
B)quality.
C)resource.
D)scope.
Question
A ________ specification is concerned with how well the functions are to operate.

A)functional.
B)quality.
C)resource.
D)scope.
Question
_______ is a qualitative measure of the degree to which classes are connected to one another.

A)cohesion.
B)coupling.
C)control.
D)coordination.
Question
In _________ stage, the entry, exit and process requirements are identified for each activity.

A)review and publicize plan.
B)identify project scope and objectives.
C)analyse project.
D)identify the products and activities of the project.
Question
___________ is also a part of design modelling.

A)user interface design.
B)testing.
C)behaviour model.
D)analysis.
Question
Deployment diagrams illustrate the ________ view of the system.

A)dynamic.
B)behavioural.
C)activities.
D)static.
Question
The problems experienced in the survey of managers published by Thayer, Pyster and Wood include_________.

A)poor estimates and plans.
B)poor role definition.
C)poor quality control.
D)both a and b.
Question
PRINCE means _____________

A)projects in combined energy
B)projects in controlled energy
C)projects in combined environments.
D)projects in controlled environments
Question
Which forms the basis for management control of software project?

A)methods.
B)tools.
C)process.
D)quality focus.
Question
Requirements engineering provides the mechanism for _________.

A)understanding custom needs.
B)assessing facility.
C)analyzing need.
D)all of the above .
Question
When a customer does not identify a detailed input, processing or output requirements, _______ model is used.

A)prototyping.
B)rad.
C)incremental.
D)spiral.
Question
Projects lies between ___________.

A)job & exploration
B)methods & process
C)quality & quantity
D)tool& process
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/24
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Software Development and Design
1
_________ assesses the quality of a software product.

A)acquirers.
B)developers.
C)independent evaluators.
D)software designers.
independent evaluators.
2
In PRINCE 2, 2 is meant for ______.

A)number of clients.
B)number of standards.
C)version.
D)edition.
version.
3
________ is needed to ensure that the project remains under control and that it continues to meet its business justification.

A)yellow tape.
B)white tape.
C)red tape.
D)black tape.
red tape.
4
Cost Benefit Analysis is done for ___________ feasibility.

A)social
B)technical.
C)process.
D)economical.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
5
_______ is classified into Functional and Non-functional.

A)project.
B)requirements.
C)start date. .
D)risk
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
6
________ is some thing that is described by a set of attributes (data items) and that will be manipulated within the software (system).

A)instance.
B)class.
C)object.
D)data.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
7
A _________ contains a set of attributes that act as an aspect, quality, characteristic, or descriptor of the object.

A)ordinary object.
B)data object.
C)template.
D)instance.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
8
________ is the diagrammatic form for Flow oriented Modelling.

A)functional diagrams.
B)er diagrams.
C)data flow diagrams.
D)system flow diagrams.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
9
_________ is the sub-characteristics of efficiency.

A)understandability.
B)learnability.
C)resource utilization.
D)accuracy.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
10
Level 0 data flow diagrams are otherwise known as _______ .

A)functional diagrams.
B)er diagrams.
C)data flow diagrams.
D)context flow diagrams.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
11
_______ refers to the ability of the software to interact with other systems.

A)interoperability.
B)reliability.
C)functionality.
D)efficiency.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
12
_______ is a modular building block for computer software.

A)control.
B)flow.
C)process.
D)component.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
13
A ________ specification is concerned with how much is to spent on the system.

A)functional.
B)quality.
C)resource.
D)scope.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
14
A ________ specification is concerned with how well the functions are to operate.

A)functional.
B)quality.
C)resource.
D)scope.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
15
_______ is a qualitative measure of the degree to which classes are connected to one another.

A)cohesion.
B)coupling.
C)control.
D)coordination.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
16
In _________ stage, the entry, exit and process requirements are identified for each activity.

A)review and publicize plan.
B)identify project scope and objectives.
C)analyse project.
D)identify the products and activities of the project.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
17
___________ is also a part of design modelling.

A)user interface design.
B)testing.
C)behaviour model.
D)analysis.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
18
Deployment diagrams illustrate the ________ view of the system.

A)dynamic.
B)behavioural.
C)activities.
D)static.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
19
The problems experienced in the survey of managers published by Thayer, Pyster and Wood include_________.

A)poor estimates and plans.
B)poor role definition.
C)poor quality control.
D)both a and b.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
20
PRINCE means _____________

A)projects in combined energy
B)projects in controlled energy
C)projects in combined environments.
D)projects in controlled environments
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
21
Which forms the basis for management control of software project?

A)methods.
B)tools.
C)process.
D)quality focus.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
22
Requirements engineering provides the mechanism for _________.

A)understanding custom needs.
B)assessing facility.
C)analyzing need.
D)all of the above .
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
23
When a customer does not identify a detailed input, processing or output requirements, _______ model is used.

A)prototyping.
B)rad.
C)incremental.
D)spiral.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
24
Projects lies between ___________.

A)job & exploration
B)methods & process
C)quality & quantity
D)tool& process
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 24 flashcards in this deck.