Question
The notice inviting tender should published in minimum........ daily news paper

A)3
B)2
C)4
D)5
Use Space or
up arrow
down arrow
to flip the card.
Question
Who will sign the contract deed on behalf of government

A)Chief engineer
B)Superintendent engineer
C)Executive engineer
D)Head clerk
Question
Who will draft contract agreement?

A)Chief engineer
B)Divisional head clerk
C)Executive engineer
D)None of the above
Question
Which are the criteria to be checked for pre- qualification of contractor

A)Financial strength
B)Past five year experience
C)Technical personnel engaged
D)All of the above
Question
How many envelops are required to submitted Tender form

A)3
B)1
C)4
D)2
Question
Total no of grades for registration of contractor with governments are

A)3
B)5
C)7
D)4
Question
Contract is terminated in case of

A)Slow progress and time limit exceeds
B)Work is not being executed as per specifications and instruction of EIC
C)Contractor tries to admit sub-contractor
D)All of the above
Question
Form no .........is used for material at site account

A)35
B)28
C)16
D)9
Question
Mobilization advance

A)Shall be 2 to 5 % of project cost.
B)Shall be 3 to 7 % of project cost.
C)Shall be 10 to 15 % of project cost.
D)Shall be 12 to 18 % of project cost.
Question
PERT analysis is based upon

A)Optimistic time
B)Pessimistic time
C)Most likely time
D)All of the above
Question
The time activity consumes in most adverse conditions is

A)Optimistic time
B)Pessimistic time
C)Most likely time
D)All of the above
Question
The time activity consumes in normal conditions is

A)Optimistic time
B)Pessimistic time
C)Most likely time
D)All of the above
Question
The difference between the total float and free float is called

A)Duration
B)Interfering float
C)Critical activity
D)None of the above
Question
The critical path is

A)The longest path of the network
B)The shortest path of the network
C)The average duration path of the network
D)None of the above
Question
The float of critical activity is always

A)Maximum
B)Minimum
C)Zero
D)None of the above
Question
A dummy activity in a network

A)Is represented by dotted line
B)Is an artificial activity
C)Does not consume time and resources
D)All of the above
Question
Activity starts from

A)Head event
B)Tail event
C)Dual role event
D)None of the above
Question
Which of the following is an activity

A)Excavation
B)Curing
C)Laying concrete
D)All of the above
Question
Earliest start time of activity equals to

A)TE of tail event of an activity
B)TE of head event of an activity
C)Average time of TE of tail event and head event
D)None of the above
Question
................is provided to safeguard scaffolding against overturning.

A)Standards
B)Inclined rackers
C)Put-logs
D)Rails
Question
Ladder leading to landing should be extended at least ....... meter above the landing

A)1.2
B)1.5
C)1
D)1.8
Question
While using ladder one should not lean sideways more than......... cms.

A)40
B)60
C)30
D)45
Question
Wooden ladders should be inspected at least........... a month.

A)Once
B)Twice
C)Three times
D)Four times
Question
In sheds for ceiling works, ......................... scaffolding is economical.

A)Suspended
B)Needle
C)Ordinary
D)None of the above
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/24
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Construction Tendering and Contract Management
1
The notice inviting tender should published in minimum........ daily news paper

A)3
B)2
C)4
D)5
2
2
Who will sign the contract deed on behalf of government

A)Chief engineer
B)Superintendent engineer
C)Executive engineer
D)Head clerk
Executive engineer
3
Who will draft contract agreement?

A)Chief engineer
B)Divisional head clerk
C)Executive engineer
D)None of the above
Divisional head clerk
4
Which are the criteria to be checked for pre- qualification of contractor

A)Financial strength
B)Past five year experience
C)Technical personnel engaged
D)All of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
5
How many envelops are required to submitted Tender form

A)3
B)1
C)4
D)2
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
6
Total no of grades for registration of contractor with governments are

A)3
B)5
C)7
D)4
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
7
Contract is terminated in case of

A)Slow progress and time limit exceeds
B)Work is not being executed as per specifications and instruction of EIC
C)Contractor tries to admit sub-contractor
D)All of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
8
Form no .........is used for material at site account

A)35
B)28
C)16
D)9
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
9
Mobilization advance

A)Shall be 2 to 5 % of project cost.
B)Shall be 3 to 7 % of project cost.
C)Shall be 10 to 15 % of project cost.
D)Shall be 12 to 18 % of project cost.
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
10
PERT analysis is based upon

A)Optimistic time
B)Pessimistic time
C)Most likely time
D)All of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
11
The time activity consumes in most adverse conditions is

A)Optimistic time
B)Pessimistic time
C)Most likely time
D)All of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
12
The time activity consumes in normal conditions is

A)Optimistic time
B)Pessimistic time
C)Most likely time
D)All of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
13
The difference between the total float and free float is called

A)Duration
B)Interfering float
C)Critical activity
D)None of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
14
The critical path is

A)The longest path of the network
B)The shortest path of the network
C)The average duration path of the network
D)None of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
15
The float of critical activity is always

A)Maximum
B)Minimum
C)Zero
D)None of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
16
A dummy activity in a network

A)Is represented by dotted line
B)Is an artificial activity
C)Does not consume time and resources
D)All of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
17
Activity starts from

A)Head event
B)Tail event
C)Dual role event
D)None of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following is an activity

A)Excavation
B)Curing
C)Laying concrete
D)All of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
19
Earliest start time of activity equals to

A)TE of tail event of an activity
B)TE of head event of an activity
C)Average time of TE of tail event and head event
D)None of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
20
................is provided to safeguard scaffolding against overturning.

A)Standards
B)Inclined rackers
C)Put-logs
D)Rails
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
21
Ladder leading to landing should be extended at least ....... meter above the landing

A)1.2
B)1.5
C)1
D)1.8
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
22
While using ladder one should not lean sideways more than......... cms.

A)40
B)60
C)30
D)45
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
23
Wooden ladders should be inspected at least........... a month.

A)Once
B)Twice
C)Three times
D)Four times
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
24
In sheds for ceiling works, ......................... scaffolding is economical.

A)Suspended
B)Needle
C)Ordinary
D)None of the above
Unlock Deck
Unlock for access to all 24 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 24 flashcards in this deck.