1
The camber recommended for water bound macadam roads in
A)1 in 24 to 1 in 30
B)1 in 30 to 1 in 48
C)1 in 48 to 1 in 60
D)1 in 60 to 1 in 80
A)1 in 24 to 1 in 30
B)1 in 30 to 1 in 48
C)1 in 48 to 1 in 60
D)1 in 60 to 1 in 80
1 in 30 to 1 in 48
2
The California bearing ratio (CBR) method of flexible pavement design gives an idean about
A)the quality of road making material
B)the traffic intensities
C)the characteristics of soil
D)all of these
A)the quality of road making material
B)the traffic intensities
C)the characteristics of soil
D)all of these
the quality of road making material
3
In snow-bound sections, the super-elevation on roads should not be more than
A)7%
B)8%
C)9%
D)10%
A)7%
B)8%
C)9%
D)10%
7%
4
The tongue and groove type of longitudinal joint do not help to control the differential uplift between the two adjacent edges.
A)Right
B)Wrong
A)Right
B)Wrong
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
An ideal vertical curve is a cubic spiral.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
According to Telford
A)the size of stone at the centre varied from 160 mm to 200 mm and gradually decreased to 75 mm to 125 mm towards the haunches
B)the central 6 metre width of the road was covered with two layers of stones about 100 mm and 50 mm respectively
C)the size of stone used was of 63 mm diameter
D)all of the above
A)the size of stone at the centre varied from 160 mm to 200 mm and gradually decreased to 75 mm to 125 mm towards the haunches
B)the central 6 metre width of the road was covered with two layers of stones about 100 mm and 50 mm respectively
C)the size of stone used was of 63 mm diameter
D)all of the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
Weight of a vehicle affects
A)passing sight distance
B)extra widening
C)pavement thickness
D)width of lanes
A)passing sight distance
B)extra widening
C)pavement thickness
D)width of lanes
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following statement is correct?
A)The sub-grade strength has only little influence upon the structural capacity of the rigid pavement.
B)The major factor in the design of rigid pavements is the flexural strength of concrete.
C)The temperature variations due to changes in atmospheric conditions do not produce stresses in flexible pavements.
D)all of the above
A)The sub-grade strength has only little influence upon the structural capacity of the rigid pavement.
B)The major factor in the design of rigid pavements is the flexural strength of concrete.
C)The temperature variations due to changes in atmospheric conditions do not produce stresses in flexible pavements.
D)all of the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
A curve whose radius gradually changes from an infinite value to a finite value or vice-versa for the purpose of giving easy change of direction of a road, is called a
A)circular curve
B)transition curve
C)simple curve
D)compound curve
A)circular curve
B)transition curve
C)simple curve
D)compound curve
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
Rolling terrain is a terrain with cross-slope of
A)upto 10%
B)10 to 25%
C)25% to 60%
D)greater than 60%
A)upto 10%
B)10 to 25%
C)25% to 60%
D)greater than 60%
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
At the end of the reconnaissance phase, the selected alignment is pegged by using about 2m high poles on which the
A)number of peg is marked
B)direction of proposed alignment is marked
C)distance between the two pegs is marked
D)all of these
A)number of peg is marked
B)direction of proposed alignment is marked
C)distance between the two pegs is marked
D)all of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
The width of parking spaces is effected by the
A)width
B)length
A)width
B)length
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
Formation width on straights for motorable road carrying a total load less than 100 tonnes per day, is
A)3 to 4.5 m
B)4.5 to 5 m
C)5 to 7.25 m
D)none of these
A)3 to 4.5 m
B)4.5 to 5 m
C)5 to 7.25 m
D)none of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
In scanty rainfall areas, the camber provided will be
A)flatter
B)steeper
C)zero
D)none of these
A)flatter
B)steeper
C)zero
D)none of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
Traffic engineering deals with the
A)traffic operation
B)design and application of control devices
C)analysis of traffic characteristics
D)all of these
A)traffic operation
B)design and application of control devices
C)analysis of traffic characteristics
D)all of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
The main disadvantage of concrete roads is that
A)the initial cost is high
B)it requires skilled personnel for construction
C)it requires cautious handling of the material
D)all of the above
A)the initial cost is high
B)it requires skilled personnel for construction
C)it requires cautious handling of the material
D)all of the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
For design purposes, average daily traffic should be considered.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
The main advantage of providing super-elevation is
A)to decrease the intensity of stresses on the foundation
B)to increase the stability of the fast moving vehicles, when they negotiate a horizontal curve
C)to achieve higher speed of vehicles
D)all of the above
A)to decrease the intensity of stresses on the foundation
B)to increase the stability of the fast moving vehicles, when they negotiate a horizontal curve
C)to achieve higher speed of vehicles
D)all of the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
The universally recognized factor which affects the flexible pavement design, is the
A)characteristics of the natural soil which underlies the pavement
B)volume and character of traffic that will use the highway
C)drainage condition of the area
D)all of the above
A)characteristics of the natural soil which underlies the pavement
B)volume and character of traffic that will use the highway
C)drainage condition of the area
D)all of the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
A track of width 1 to 1.2 m constructed along the selected alignment to facilitate access to the area for inspection and detailed survey is known as
A)inspection trace
B)terrain
C)trace out
D)all of these
A)inspection trace
B)terrain
C)trace out
D)all of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
In detailed survey of a hill road, the interval for plotting the contours at sharp curves is generally
A)1 m
B)2 m
C)4 m
D)6 m
A)1 m
B)2 m
C)4 m
D)6 m
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
The grand trunk (G.T.) road was constructed during
A)1440 to 1445 A.D.
B)1540 to 1545 A.D.
C)200 to 2500 B.C.
D)2500 to 3000 B.C.
A)1440 to 1445 A.D.
B)1540 to 1545 A.D.
C)200 to 2500 B.C.
D)2500 to 3000 B.C.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
The transverse contraction joints in unreinforced concrete pavements are provided at much closer intervals than the expansion joints.
A)Agree
B)Disagree
A)Agree
B)Disagree
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
The transverse joint may be a
A)expansion joint
B)contraction joint
C)warping joint
D)all of these
A)expansion joint
B)contraction joint
C)warping joint
D)all of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
The Indian Roads Congress (I.R.C.) was set up in
A)1930
B)1934
C)1948
D)1956
A)1930
B)1934
C)1948
D)1956