Deck 17: Project Management Techniques

Full screen (f)
exit full mode
Question
​A milestone task always has a duration of zero days.
Use Space or
up arrow
down arrow
to flip the card.
Question
​The first step in NPV calculations is to determine the discount rate.
Question
Given the below figure,what is the Cumulative NPV after Year 2?
<strong>Given the below figure,what is the Cumulative NPV after Year 2?    </strong> A)$76, 760 B)​$15,140 C)​$5,380 D)-$44,200 <div style=padding-top: 35px>  

A)$76, 760
B)​$15,140
C)​$5,380
D)-$44,200
Question
​The most common way to determine the discount rate for NPV calculations is by _____.

A)using company policy
B)​using the federally published discount rates
C)​using the results of ROI calculations
D)​calculating current loan interest rates
Question
Given the below figure,what is the Net Present Value (NPV)for Year 2?
<strong>Given the below figure,what is the Net Present Value (NPV)for Year 2?  </strong> A)$55,800 B)​$59,340 C)$60,850 D)​$61,620 <div style=padding-top: 35px>

A)$55,800
B)​$59,340
C)$60,850
D)​$61,620
Question
​Given the below figure,when is the Breakeven point?
<strong>​Given the below figure,when is the Breakeven point?  </strong> A)637 days B)​538 days C)​458 days D)​272 days <div style=padding-top: 35px>

A)637 days
B)​538 days
C)​458 days
D)​272 days
Question
Given that the NPV at the end of year 3 was -$185,000 and it was +$265,00 at the end of year 4,what is the payback period?

A)Not enough information to calculate. 
B)​150 days
C)​Three years and 41 days
D)Three years and 150 days.
Question
​Given the below PERT/CPM chart,how many days does it take for the project to end?
<strong>​Given the below PERT/CPM chart,how many days does it take for the project to end?  </strong> A)15 days B)​13 days C)​12 days D)​9 days <div style=padding-top: 35px>

A)15 days
B)​13 days
C)​12 days
D)​9 days
Question
​The discount factor for 2 time periods at 10% discount rate is ______.

A).9090
B).8899
C)​.8264
D)​.7513
Question
​The objective of ____ is to determine a specific value based on a predetermined discount rate.

A)project evaluation and review technique (PERT) 
B)​return on investment (ROI) 
C)​cost/benefit analysis
D)net present value (NPV)
Question
​In Microsoft Project calculating and assigning the duration time to a summary task is usually fairly complex.
Question
​The present value of $200,000 development costs in year 0 assuming a 10% discount rate is:

A)$180,000
B)​$190,000
C)​$200,000
D)​$210,000
Question
​Given the below figure,what is the 2 year ROI without discount?
<strong>​Given the below figure,what is the 2 year ROI without discount?  </strong> A)129% B)182% C)​207% D)​238% <div style=padding-top: 35px>

A)129%
B)182%
C)​207%
D)​238%
Question
​A PERT/CPM is another name for a type of Gantt Chart.
Question
​Payback period is usually calculated for the same time period as the discount rate is applied.
Question
​In Microsoft Project a Tracking Gantt chart is useful to keep track of the resources on a project.
Question
​A(n)_____ chart is a chart for scheduling a project based on individual tasks or activities and their dependencies.

A)WBS
B)​PERT
C)PMBOK
D)​Project
Question
​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? 

A) <strong>​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? </strong> A)   B)   C)​   D)   <div style=padding-top: 35px>
B) <strong>​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? </strong> A)   B)   C)​   D)   <div style=padding-top: 35px>
C)​ <strong>​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? </strong> A)   B)   C)​   D)   <div style=padding-top: 35px>
D) <strong>​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? </strong> A)   B)   C)​   D)   <div style=padding-top: 35px>
Question
​To determine a percentage return on an initial investment,which of the following techniques should be used?

A)None of these will work 
B)Payback calculations
C)​Net present value
D)Return on investment
Question
​Which of the following is also referred to as the breakeven point?

A)Net present value (NPV)
B)​Payback period
C)​Return on Investment (ROI) 
D)​cost/benefit equalization
Question
​The three techniques used for Scope Management are Defining the scope,_______ ,and Controlling the scope.

A)Reducing the scope
B)​Approving the scope
C)Monitoring the scope​
D)​Verifying the scope
Question
​The method used in Microsoft Project for making summary tasks is by _______ the detailed tasks.

A)leveling
B)​subtasking
C)​promoting
D)​demoting
Question
​A project manager has purchased some training classes for JAVA programming for new members of his team.This would be considered to be part of which PM management area?

A)Time management
B)​Communication management
C)​Human resource management
D)​Procurement management
Question
​Which of the following equations is correct for calculating early start time?

A) <strong>​Which of the following equations is correct for calculating early start time?</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
B) <strong>​Which of the following equations is correct for calculating early start time?</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
C) <strong>​Which of the following equations is correct for calculating early start time?</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
D) <strong>​Which of the following equations is correct for calculating early start time?</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
Question
​Which of the following is NOT a type of dependency between tasks on a PERT/CPM chart?

A)Resource mandatory
B)​Project mandatory
C)​External mandatory
D)​Discretionary
Question
​For a particular project the new system requires the installation of new servers.Managing this activity fits best in which project management area?

A)Quality management
B)​Time management
C)​Cost management 
D)​Procurement management
Question
​The annual percentage rate that an amount of money is discounted to bring to a present value is called the _____.
Question
​Setting up a change control log to keep track of new system requirements is part of what PMBOK area?

A)Cost Management
B)​Quality Management
C)​Time Management
D)​Scope Management
Question
​Good Project Communication Management requires techniques in three important areas: (1)gathering information (2)disseminating information and (3)________ .

A)managing internal communications
B)​managing stakeholder information
C)​managing the database of information
D)​managing the project documentation
Question
​Which is NOT one of the characteristics of a quality software system?

A)Fit for intended purpose
B)​Robust
C)​Secure
D)Easy to install
Question
​Which of the following equations is correct for calculating late start times with concurrent tasks?

A) <strong>​Which of the following equations is correct for calculating late start times with concurrent tasks?</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
B) <strong>​Which of the following equations is correct for calculating late start times with concurrent tasks?</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
C) <strong>​Which of the following equations is correct for calculating late start times with concurrent tasks?</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
D) <strong>​Which of the following equations is correct for calculating late start times with concurrent tasks?</strong> A)   B)   C)   D)   <div style=padding-top: 35px>
Question
​Given the below figure what tasks are included in the critical path?
<strong>​Given the below figure what tasks are included in the critical path?  </strong> A)1, 2, 3, 4, 5, 6, 7 B)​1, 2, 3, 6, 7 C) 1, 2, 4, 6, 7 D)​1, 2, 5, 6, 7 <div style=padding-top: 35px>

A)1, 2, 3, 4, 5, 6, 7
B)​1, 2, 3, 6, 7
C) 1, 2, 4, 6, 7
D)​1, 2, 5, 6, 7
Question
​In Microsoft Project if task B need to begin two days after task A started,you would use a task dependency of _______.

A)FS + 2 days
B)SS + 2 days
C)​FS - 2 days
D)​SS - 2 days
Question
​Given the below figure,what is the early start time of task number 6?
<strong>​Given the below figure,what is the early start time of task number 6?  </strong> A)6 days B)7 days C)​8 days D)​9 days <div style=padding-top: 35px>

A)6 days
B)7 days
C)​8 days
D)​9 days
Question
​To ensure that the project schedule accurately accommodates the necessary work is part of the objective of which PMBOK management area?

A)Schedule management
B)​Time management
C)​Quality management
D)​Resource management
Question
​Given a project schedule with all tasks connected via one way arrows and with task durations. The critical path is ______.

A)the longest path through the network
B)​the shortest path through the network
C)​neither the longest nor the shortest path through the network
D)​it cannot be determined
Question
​In a PERT/CPM chart the lag time represents _____.

A)a dead time between tasks
B)​the difference between the early start time and the late start time
C)​the delay between the projected completion and actual completion of a task
D)​the time required to coordinate tasks on separate paths
Question
​In a PERT/CPM chart when several tasks are in sequence to form a path segment but are not on the critical path the total slack time is _____?

A)the same for each one
B)​the sum of the individual slack times
C)​equal to the greatest slack time  
D)​equal to the smallest slack time
Question
​A split screen in Microsoft Project is an effective way to ______ .

A)view multiple projects at the same time
B)​view both summary information and detailed task information
C)​view the Gantt chart and the Resource sheet at the same time
D)​view the planning chart view and the tracking chart view at the same time
Question
Given the below figure,what is the late start time for task number 5?
<strong>Given the below figure,what is the late start time for task number 5?  </strong> A)6 days B)​7 days C)​8 days D)9 days <div style=padding-top: 35px>

A)6 days
B)​7 days
C)​8 days
D)9 days
Question
​List and briefly explain six characteristics of a quality system.
Question
​Briefly identify and explain the three primary objectives of Project Scope Management.
Question
​The latest time that a task can start on a project schedule without negative impacts to the overall schedule is called the ______.
Question
​The amount of time a task or sequence of tasks can be delayed without impacting the project is called the _____.
Question
​List the nine PMBOK knowledge areas.
Question
​The accumulation of yearly discounts based on a discount rate is called the ______.
Question
​List and briefly describe the objectives of Project Procurement Management.
Question
​List and briefly describe the four objectives of Project Communication Management.
Question
​Briefly identify and explain the three objectives of Project Time Management.
Question
​In Microsoft Project the process (either manual or automated)which resolves resource conflicts is called ______.
Question
​List and briefly explain at least four of the six objectives of Human Resource Management.
Question
​The earliest time that a task can start on a project schedule is called its _____.
Question
​In Microsoft Project a task that indicates the completion of a deliverable or some other completion item is called a _____  task.
Question
​In Microsoft Project a PERT/CPM chart view is called a _____  diagram.
Question
​The _____ is the point at which the increased cash flow exactly pays off the costs of development and operation.
Question
​Briefly identify and explain the four objectives of Project Cost Management.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/56
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 17: Project Management Techniques
1
​A milestone task always has a duration of zero days.
True
2
​The first step in NPV calculations is to determine the discount rate.
True
3
Given the below figure,what is the Cumulative NPV after Year 2?
<strong>Given the below figure,what is the Cumulative NPV after Year 2?    </strong> A)$76, 760 B)​$15,140 C)​$5,380 D)-$44,200  

A)$76, 760
B)​$15,140
C)​$5,380
D)-$44,200
B
4
​The most common way to determine the discount rate for NPV calculations is by _____.

A)using company policy
B)​using the federally published discount rates
C)​using the results of ROI calculations
D)​calculating current loan interest rates
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
5
Given the below figure,what is the Net Present Value (NPV)for Year 2?
<strong>Given the below figure,what is the Net Present Value (NPV)for Year 2?  </strong> A)$55,800 B)​$59,340 C)$60,850 D)​$61,620

A)$55,800
B)​$59,340
C)$60,850
D)​$61,620
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
6
​Given the below figure,when is the Breakeven point?
<strong>​Given the below figure,when is the Breakeven point?  </strong> A)637 days B)​538 days C)​458 days D)​272 days

A)637 days
B)​538 days
C)​458 days
D)​272 days
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
7
Given that the NPV at the end of year 3 was -$185,000 and it was +$265,00 at the end of year 4,what is the payback period?

A)Not enough information to calculate. 
B)​150 days
C)​Three years and 41 days
D)Three years and 150 days.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
8
​Given the below PERT/CPM chart,how many days does it take for the project to end?
<strong>​Given the below PERT/CPM chart,how many days does it take for the project to end?  </strong> A)15 days B)​13 days C)​12 days D)​9 days

A)15 days
B)​13 days
C)​12 days
D)​9 days
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
9
​The discount factor for 2 time periods at 10% discount rate is ______.

A).9090
B).8899
C)​.8264
D)​.7513
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
10
​The objective of ____ is to determine a specific value based on a predetermined discount rate.

A)project evaluation and review technique (PERT) 
B)​return on investment (ROI) 
C)​cost/benefit analysis
D)net present value (NPV)
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
11
​In Microsoft Project calculating and assigning the duration time to a summary task is usually fairly complex.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
12
​The present value of $200,000 development costs in year 0 assuming a 10% discount rate is:

A)$180,000
B)​$190,000
C)​$200,000
D)​$210,000
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
13
​Given the below figure,what is the 2 year ROI without discount?
<strong>​Given the below figure,what is the 2 year ROI without discount?  </strong> A)129% B)182% C)​207% D)​238%

A)129%
B)182%
C)​207%
D)​238%
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
14
​A PERT/CPM is another name for a type of Gantt Chart.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
15
​Payback period is usually calculated for the same time period as the discount rate is applied.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
16
​In Microsoft Project a Tracking Gantt chart is useful to keep track of the resources on a project.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
17
​A(n)_____ chart is a chart for scheduling a project based on individual tasks or activities and their dependencies.

A)WBS
B)​PERT
C)PMBOK
D)​Project
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
18
​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? 

A) <strong>​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? </strong> A)   B)   C)​   D)
B) <strong>​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? </strong> A)   B)   C)​   D)
C)​ <strong>​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? </strong> A)   B)   C)​   D)
D) <strong>​Which of the following equations represents the present value (PV)of a discounted future amount (FA)at a discount rate (i)for multiple periods (n)? </strong> A)   B)   C)​   D)
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
19
​To determine a percentage return on an initial investment,which of the following techniques should be used?

A)None of these will work 
B)Payback calculations
C)​Net present value
D)Return on investment
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
20
​Which of the following is also referred to as the breakeven point?

A)Net present value (NPV)
B)​Payback period
C)​Return on Investment (ROI) 
D)​cost/benefit equalization
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
21
​The three techniques used for Scope Management are Defining the scope,_______ ,and Controlling the scope.

A)Reducing the scope
B)​Approving the scope
C)Monitoring the scope​
D)​Verifying the scope
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
22
​The method used in Microsoft Project for making summary tasks is by _______ the detailed tasks.

A)leveling
B)​subtasking
C)​promoting
D)​demoting
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
23
​A project manager has purchased some training classes for JAVA programming for new members of his team.This would be considered to be part of which PM management area?

A)Time management
B)​Communication management
C)​Human resource management
D)​Procurement management
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
24
​Which of the following equations is correct for calculating early start time?

A) <strong>​Which of the following equations is correct for calculating early start time?</strong> A)   B)   C)   D)
B) <strong>​Which of the following equations is correct for calculating early start time?</strong> A)   B)   C)   D)
C) <strong>​Which of the following equations is correct for calculating early start time?</strong> A)   B)   C)   D)
D) <strong>​Which of the following equations is correct for calculating early start time?</strong> A)   B)   C)   D)
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
25
​Which of the following is NOT a type of dependency between tasks on a PERT/CPM chart?

A)Resource mandatory
B)​Project mandatory
C)​External mandatory
D)​Discretionary
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
26
​For a particular project the new system requires the installation of new servers.Managing this activity fits best in which project management area?

A)Quality management
B)​Time management
C)​Cost management 
D)​Procurement management
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
27
​The annual percentage rate that an amount of money is discounted to bring to a present value is called the _____.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
28
​Setting up a change control log to keep track of new system requirements is part of what PMBOK area?

A)Cost Management
B)​Quality Management
C)​Time Management
D)​Scope Management
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
29
​Good Project Communication Management requires techniques in three important areas: (1)gathering information (2)disseminating information and (3)________ .

A)managing internal communications
B)​managing stakeholder information
C)​managing the database of information
D)​managing the project documentation
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
30
​Which is NOT one of the characteristics of a quality software system?

A)Fit for intended purpose
B)​Robust
C)​Secure
D)Easy to install
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
31
​Which of the following equations is correct for calculating late start times with concurrent tasks?

A) <strong>​Which of the following equations is correct for calculating late start times with concurrent tasks?</strong> A)   B)   C)   D)
B) <strong>​Which of the following equations is correct for calculating late start times with concurrent tasks?</strong> A)   B)   C)   D)
C) <strong>​Which of the following equations is correct for calculating late start times with concurrent tasks?</strong> A)   B)   C)   D)
D) <strong>​Which of the following equations is correct for calculating late start times with concurrent tasks?</strong> A)   B)   C)   D)
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
32
​Given the below figure what tasks are included in the critical path?
<strong>​Given the below figure what tasks are included in the critical path?  </strong> A)1, 2, 3, 4, 5, 6, 7 B)​1, 2, 3, 6, 7 C) 1, 2, 4, 6, 7 D)​1, 2, 5, 6, 7

A)1, 2, 3, 4, 5, 6, 7
B)​1, 2, 3, 6, 7
C) 1, 2, 4, 6, 7
D)​1, 2, 5, 6, 7
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
33
​In Microsoft Project if task B need to begin two days after task A started,you would use a task dependency of _______.

A)FS + 2 days
B)SS + 2 days
C)​FS - 2 days
D)​SS - 2 days
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
34
​Given the below figure,what is the early start time of task number 6?
<strong>​Given the below figure,what is the early start time of task number 6?  </strong> A)6 days B)7 days C)​8 days D)​9 days

A)6 days
B)7 days
C)​8 days
D)​9 days
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
35
​To ensure that the project schedule accurately accommodates the necessary work is part of the objective of which PMBOK management area?

A)Schedule management
B)​Time management
C)​Quality management
D)​Resource management
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
36
​Given a project schedule with all tasks connected via one way arrows and with task durations. The critical path is ______.

A)the longest path through the network
B)​the shortest path through the network
C)​neither the longest nor the shortest path through the network
D)​it cannot be determined
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
37
​In a PERT/CPM chart the lag time represents _____.

A)a dead time between tasks
B)​the difference between the early start time and the late start time
C)​the delay between the projected completion and actual completion of a task
D)​the time required to coordinate tasks on separate paths
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
38
​In a PERT/CPM chart when several tasks are in sequence to form a path segment but are not on the critical path the total slack time is _____?

A)the same for each one
B)​the sum of the individual slack times
C)​equal to the greatest slack time  
D)​equal to the smallest slack time
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
39
​A split screen in Microsoft Project is an effective way to ______ .

A)view multiple projects at the same time
B)​view both summary information and detailed task information
C)​view the Gantt chart and the Resource sheet at the same time
D)​view the planning chart view and the tracking chart view at the same time
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
40
Given the below figure,what is the late start time for task number 5?
<strong>Given the below figure,what is the late start time for task number 5?  </strong> A)6 days B)​7 days C)​8 days D)9 days

A)6 days
B)​7 days
C)​8 days
D)9 days
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
41
​List and briefly explain six characteristics of a quality system.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
42
​Briefly identify and explain the three primary objectives of Project Scope Management.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
43
​The latest time that a task can start on a project schedule without negative impacts to the overall schedule is called the ______.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
44
​The amount of time a task or sequence of tasks can be delayed without impacting the project is called the _____.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
45
​List the nine PMBOK knowledge areas.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
46
​The accumulation of yearly discounts based on a discount rate is called the ______.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
47
​List and briefly describe the objectives of Project Procurement Management.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
48
​List and briefly describe the four objectives of Project Communication Management.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
49
​Briefly identify and explain the three objectives of Project Time Management.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
50
​In Microsoft Project the process (either manual or automated)which resolves resource conflicts is called ______.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
51
​List and briefly explain at least four of the six objectives of Human Resource Management.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
52
​The earliest time that a task can start on a project schedule is called its _____.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
53
​In Microsoft Project a task that indicates the completion of a deliverable or some other completion item is called a _____  task.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
54
​In Microsoft Project a PERT/CPM chart view is called a _____  diagram.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
55
​The _____ is the point at which the increased cash flow exactly pays off the costs of development and operation.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
56
​Briefly identify and explain the four objectives of Project Cost Management.
Unlock Deck
Unlock for access to all 56 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 56 flashcards in this deck.