Deck 11: Project Planning and Project Management

Full screen (f)
exit full mode
Question
Agile project managers do not try to answer the question "How much will the project cost?"​
Use Space or
up arrow
down arrow
to flip the card.
Question
One important step in estimating the time required for a project is to try to identify all of the functional requirements of a the new system.​
Question
The System Vision Document consists of the problem description and the business benefits.​
Question
A major reason that software development projects to fail is due to poor project management.​
Question
Performing the risk analysis is part of Core Process 2,(Plan and monitor the project).​
Question
With Agile Cost Management it is important to control the costs,even more important than estimating the costs to get project approval.​
Question
Which of the following statements best defines what a project is?​

A)A planned activity consisting of defined tasks by a team of people.
B)​A sequence of steps with a scheduled completion.
C)A set of procedures that must be completed in a timely fashion.
D)​A planned undertaking with a start and stop and that produces a result.
Question
The final decision of project scope in an Agile project rests with the users.​
Question
It is usually impossible to make an accurate estimate of the time required to complete a development project.​
Question
Although most project status can be reported electronically,for most projects a periodic printed status report (such as a newsletter)is still critically important.​
Question
In Agile projects the easiest portions of the system are built in the first few iterations.​
Question
Which of the following best describes the reason why projects fail?​

A)Technological problems
B)​System is too complex
C)Wrong development methodology
D)​Undefined project management practices
Question
Newer iterative and Agile development paradigms have improved project success.However,these approaches still have one-third of all projects have problems delivering satisfactory results on time.​
Question
​Since the Agile philosophy embraces change,project scope management is not important for Agile projects.
Question
Projects are seldom initiated to solve immediate business problems.​
Question
One of the responsibilities of the project manager in getting a project approved is to try to predict the value of business benefits.​
Question
In adaptive,iterative projects there are usually two types of schedules created.​
Question
Ceremony refers to the official kick-off meeting to start a project.​
Question
A good project manager focuses his energy on the success of the project team and allows the oversight committee to monitor and report project status.​
Question
With Agile Time Management scheduling is only done on a micro level and not a macro level.​
Question
Which of the following is NOT one of the activities of the second core process to plan and monitor the project.​

A)Establish the work environment
B)​Build work schedules
C)Evaluate work processes
D)​Estimate the project length
Question
The time from the deployment of a new system until the break-even point is reached is sometimes called the ______.​

A)investment period
B)​net present value
C)return on investment
D)​payback period
Question
Project Quality Management is different for Agile projects because they place heavy emphasis in what additional area?​

A)The quality of the testing process.
B)​The quality of the project processes.
C)The quality of the deliverables.
D)​The quality of the team members.
Question
Which of the following is NOT a common question asked by the client before giving project approval?​

A)How much will it cost?​
B)​How long will it take?
C)Who is the project manager?
D)​What are the benefits?
Question
Which of the following principles of project management evaluates Requests for Proposals?​

A)Integration Management
B)​Quality Management
C)Human Resource Management
D)​Procurement Management
Question
What technique is used to control the scope in an Agile project?​

A)Not important to worry about scope.
B)​Freeze the requirements in an early iteration.
C)Keep a prioritized list of required functions.
D)​Let the client and the users worry about the scope.
Question
Which of the following is NOT a standard reason for initiating a system development project.​

A)To respond to an opportunity
B)​To reduce staffing requirements
C)To resolve a problem
D)​To respond to an external directive
Question
Which of the following is NOT one of the internal responsibilities of a project manager?​

A)Develop the project schedule
B)​Develop specifications
C)Assign work to team members
D)​Monitor project milestones
Question
Missing milestones on a project may be an indication of project that has high _______ risk.​

A)Schedule
B)​Resource
C)Deployment
D)​Technological
Question
Which of the following is also called a steering committee?​

A)Executive committee
B)​Strategic planning committee
C)Project approval committee
D)​Oversight committee
Question
Usually the highest cost for the development and deployment of a new system is _____.​

A)License fees for new software
B)​Salaries of the development team
C)Computer and network equipment
D)​Data center costs
Question
Which is NOT an activity associated with establishing the project environment?​

A)Record and communicate project information.
B)​Establish the working environment.
C)Establish team processes and procedures.
D)​Identify staffing requirements.
Question
Which of the following is NOT one of the PMBOK knowledge areas?​

A)Integration Management
B)​Documentation Management
C)Risk Management
D)​Procurement Management
Question
A ____ combines three components: the problem description,the business benefits,and the system capabilities.​

A)Project charter
B)​Proof-of-concept analysis
C)System vision document
D)​System scope document
Question
Which of the following is NOT one of the external responsibilities of a project manager?​

A)Report project status
B)​Assess project risks
C)Work with the client
D)​Identify resource needs
Question
Which is NOT one of the primary areas for risk and feasibility analysis?​

A)Organizational risks
B)Deployment risks​
C)Resource risks
D)​Schedule risks
Question
The net present value for a year is calculated by _______.​

A)combining benefits and costs for a defined number of years
B)​applying the discount rate to the combination of benefits and costs
C)determining when the benefits offset the costs
D)​applying the discount factor to the combination of benefits and costs
Question
According to the Dr Dobbs report on project success what is the approximate percent of Agile or iterative projects that can be considered completely successful?​

A)35%
B)​50%
C)65%
D)80%​
Question
The fear of using a computer (computer phobia)is a type of _______ risk.​

A)Technological risk
B)​Resource (people) risk
C)Organizational risk
D)​Deployment risk
Question
The organization and direction of other people to achieve a planned result within a predetermined schedule and budget is called what?​

A)Project delivery management
B)​Project integration management
C)Project human resource management
D)​Project management
Question
The required functions and capabilities of the new system that are developed in order to get approval for the development project are called the _______ ______.​
Question
The term "__________  __________" refers to the organization and direction of other people to achieve a planned result within a predetermined schedule and budget.​
Question
The level of formality of a project is often referred to as _______ .​
Question
​Estimating the effort required and identifying task dependencies is usually part of the work to create what?

A)The project iteration schedule
B)​The detailed work schedule
C)The project time estimate
D)​The critical path
Question
Which two of the following activities belong to the second core process of planning and monitoring the project?​

A)Establish the project environment
B)​​Estimate the project cost
C)Analyze project risk and feasibility​
D)​Determine project scope
E)Estimate the project length​
F)Staff and allocate resources
Question
Which two of the following questions (decision points)are important when monitoring project progress?​

A)Is the task on target?
B)​Is the task too large?
C)Is the task clearly defined?
D)​Is the variance significant?
E)Is the corrective action sufficient?​
F)Is the status complete?
Question
The person or group that funds the project is called the _____ .​
Question
The person or group that work directly with the system are called _______ .​
Question
A project management guide and standard of fundamental project management principles is referred to as the _______.​
Question
​Which would be the least desirable reason to initiate a new development project?

A)To take advantage of a new sales opportunity
B)​To solve an internal business problem
C)To respond to a legislative requirement​
D)​To take advantage of new technology
Question
Given a project schedule with all tasks connected with one-way arrows and task durations. The critical path is _____.​

A)the longest path through the network
B)​the shortest path through the network
C)neither the longest nor shortest path through the network
D)​it cannot be determined
Question
​When the project team asks "Are our working relationships with the user effective?" it is doing what?

A)An end of iteration review
B)​An end of project review
C)A performance review
D)​A work breakdown structure
Question
Which is NOT a criterion that is used to determine how to define tasks for a work breakdown structure.​

A)How to know when the task is complete.
B)​How to estimate the effort required.
C)A logical way to determine its predecessor.
D)​It should take one to five days.
Question
Which of the following is NOT one of the activities associated with staffing the project team?​

A)Conducting team-building exercises.
B)​Developing a resource plan.
C)Organizing work groups.
D)​Setting up programming rules and guidelines.
Question
The benefits that accrue to an organization,usually measured in dollars,from the deployment of a new system are called ______ ______.​
Question
​The present value of $200,000 development costs in year 0 assuming a 10% discount rate is:

A)$180,000
B)$190,000​
C)$200,000
D)​$210,000
Question
The _______  consists of clients and key manager who review the progress and direct the project.​
Question
A document to help define the scope of the new system is called a(n)  _____ _____ _____.​
Question
​The creation of a work breakdown structure is helpful in the development of what?

A)Software testing plan.
B)Project iteration schedule.​
C)Detailed work schedule.
D)​Detailed effort estimates of work tasks.
Question
Which two of the following are activities belonging to the first core process?​

A)Schedule the work
B)​Perform risk and feasibility analysis
C)Choose the project manager
D)​Establish the project environment
E)Evaluate the work processes​
F)Quantify project approval factors
Question
An increased level of customer satisfaction is an example of a(n)_______ ______.​
Question
List the three primary reasons for initiating a software development project.​
Question
A project tracking tool that provides a summary of the status of various project items such as open tasks and expenditures is called a(n)______ ______.​
Question
The hierarchical list of activities of a project that is used to create work schedule is called the _____ ______ ______.​
Question
The point in time at which dollar benefits offset the dollar costs is called the _______ _____ _____ .​
Question
List several (at least four)reasons why projects fail.​
Question
What is the term that describes the time period after which the dollar benefits have offset the dollar costs?​
Question
The sequence of tasks in a schedule that cannot be delayed without delaying the project is called the _______ _____ .​
Question
A bar chart that portrays the schedule by the length of horizontal bars is called a _______ _____.​
Question
A benefit that can be measured in terms of dollars is called a(n)____ _____.​
Question
List three primary criteria to obtain approval for a project. These criteria are often three key questions asked by the client before giving approval.​
Question
List the four activities of the first core process: Identify the problem and obtain approval.​
Question
The deployment of a new system resulted in the reduction of the office staff from seven people to five people. This is an example of a(n)______ _______.​
Question
The meeting held at the end of an iteration to determine what was successful and what can be improved is called what?​
Question
List the three major external responsibilities of a project manager.​
Question
List the ten areas of the Project Management Body of Knowledge.​
Question
List four primary areas that are considered in risk and feasibility analysis.​
Question
The dollar value of benefits reduced by the dollar value of costs combined together and expressed in current dollars is called the ______ _____ _____.​
Question
What is the name given to the process of comparing costs and benefits to see whether investing in a new system will be beneficial?​
Question
List several (at least four)of the internal responsibilities of a project manager.​
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/82
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 11: Project Planning and Project Management
1
Agile project managers do not try to answer the question "How much will the project cost?"​
False
2
One important step in estimating the time required for a project is to try to identify all of the functional requirements of a the new system.​
True
3
The System Vision Document consists of the problem description and the business benefits.​
False
4
A major reason that software development projects to fail is due to poor project management.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
5
Performing the risk analysis is part of Core Process 2,(Plan and monitor the project).​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
6
With Agile Cost Management it is important to control the costs,even more important than estimating the costs to get project approval.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following statements best defines what a project is?​

A)A planned activity consisting of defined tasks by a team of people.
B)​A sequence of steps with a scheduled completion.
C)A set of procedures that must be completed in a timely fashion.
D)​A planned undertaking with a start and stop and that produces a result.
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
8
The final decision of project scope in an Agile project rests with the users.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
9
It is usually impossible to make an accurate estimate of the time required to complete a development project.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
10
Although most project status can be reported electronically,for most projects a periodic printed status report (such as a newsletter)is still critically important.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
11
In Agile projects the easiest portions of the system are built in the first few iterations.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following best describes the reason why projects fail?​

A)Technological problems
B)​System is too complex
C)Wrong development methodology
D)​Undefined project management practices
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
13
Newer iterative and Agile development paradigms have improved project success.However,these approaches still have one-third of all projects have problems delivering satisfactory results on time.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
14
​Since the Agile philosophy embraces change,project scope management is not important for Agile projects.
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
15
Projects are seldom initiated to solve immediate business problems.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
16
One of the responsibilities of the project manager in getting a project approved is to try to predict the value of business benefits.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
17
In adaptive,iterative projects there are usually two types of schedules created.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
18
Ceremony refers to the official kick-off meeting to start a project.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
19
A good project manager focuses his energy on the success of the project team and allows the oversight committee to monitor and report project status.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
20
With Agile Time Management scheduling is only done on a micro level and not a macro level.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following is NOT one of the activities of the second core process to plan and monitor the project.​

A)Establish the work environment
B)​Build work schedules
C)Evaluate work processes
D)​Estimate the project length
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
22
The time from the deployment of a new system until the break-even point is reached is sometimes called the ______.​

A)investment period
B)​net present value
C)return on investment
D)​payback period
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
23
Project Quality Management is different for Agile projects because they place heavy emphasis in what additional area?​

A)The quality of the testing process.
B)​The quality of the project processes.
C)The quality of the deliverables.
D)​The quality of the team members.
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following is NOT a common question asked by the client before giving project approval?​

A)How much will it cost?​
B)​How long will it take?
C)Who is the project manager?
D)​What are the benefits?
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following principles of project management evaluates Requests for Proposals?​

A)Integration Management
B)​Quality Management
C)Human Resource Management
D)​Procurement Management
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
26
What technique is used to control the scope in an Agile project?​

A)Not important to worry about scope.
B)​Freeze the requirements in an early iteration.
C)Keep a prioritized list of required functions.
D)​Let the client and the users worry about the scope.
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following is NOT a standard reason for initiating a system development project.​

A)To respond to an opportunity
B)​To reduce staffing requirements
C)To resolve a problem
D)​To respond to an external directive
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following is NOT one of the internal responsibilities of a project manager?​

A)Develop the project schedule
B)​Develop specifications
C)Assign work to team members
D)​Monitor project milestones
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
29
Missing milestones on a project may be an indication of project that has high _______ risk.​

A)Schedule
B)​Resource
C)Deployment
D)​Technological
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following is also called a steering committee?​

A)Executive committee
B)​Strategic planning committee
C)Project approval committee
D)​Oversight committee
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
31
Usually the highest cost for the development and deployment of a new system is _____.​

A)License fees for new software
B)​Salaries of the development team
C)Computer and network equipment
D)​Data center costs
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
32
Which is NOT an activity associated with establishing the project environment?​

A)Record and communicate project information.
B)​Establish the working environment.
C)Establish team processes and procedures.
D)​Identify staffing requirements.
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following is NOT one of the PMBOK knowledge areas?​

A)Integration Management
B)​Documentation Management
C)Risk Management
D)​Procurement Management
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
34
A ____ combines three components: the problem description,the business benefits,and the system capabilities.​

A)Project charter
B)​Proof-of-concept analysis
C)System vision document
D)​System scope document
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following is NOT one of the external responsibilities of a project manager?​

A)Report project status
B)​Assess project risks
C)Work with the client
D)​Identify resource needs
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
36
Which is NOT one of the primary areas for risk and feasibility analysis?​

A)Organizational risks
B)Deployment risks​
C)Resource risks
D)​Schedule risks
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
37
The net present value for a year is calculated by _______.​

A)combining benefits and costs for a defined number of years
B)​applying the discount rate to the combination of benefits and costs
C)determining when the benefits offset the costs
D)​applying the discount factor to the combination of benefits and costs
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
38
According to the Dr Dobbs report on project success what is the approximate percent of Agile or iterative projects that can be considered completely successful?​

A)35%
B)​50%
C)65%
D)80%​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
39
The fear of using a computer (computer phobia)is a type of _______ risk.​

A)Technological risk
B)​Resource (people) risk
C)Organizational risk
D)​Deployment risk
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
40
The organization and direction of other people to achieve a planned result within a predetermined schedule and budget is called what?​

A)Project delivery management
B)​Project integration management
C)Project human resource management
D)​Project management
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
41
The required functions and capabilities of the new system that are developed in order to get approval for the development project are called the _______ ______.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
42
The term "__________  __________" refers to the organization and direction of other people to achieve a planned result within a predetermined schedule and budget.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
43
The level of formality of a project is often referred to as _______ .​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
44
​Estimating the effort required and identifying task dependencies is usually part of the work to create what?

A)The project iteration schedule
B)​The detailed work schedule
C)The project time estimate
D)​The critical path
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
45
Which two of the following activities belong to the second core process of planning and monitoring the project?​

A)Establish the project environment
B)​​Estimate the project cost
C)Analyze project risk and feasibility​
D)​Determine project scope
E)Estimate the project length​
F)Staff and allocate resources
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
46
Which two of the following questions (decision points)are important when monitoring project progress?​

A)Is the task on target?
B)​Is the task too large?
C)Is the task clearly defined?
D)​Is the variance significant?
E)Is the corrective action sufficient?​
F)Is the status complete?
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
47
The person or group that funds the project is called the _____ .​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
48
The person or group that work directly with the system are called _______ .​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
49
A project management guide and standard of fundamental project management principles is referred to as the _______.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
50
​Which would be the least desirable reason to initiate a new development project?

A)To take advantage of a new sales opportunity
B)​To solve an internal business problem
C)To respond to a legislative requirement​
D)​To take advantage of new technology
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
51
Given a project schedule with all tasks connected with one-way arrows and task durations. The critical path is _____.​

A)the longest path through the network
B)​the shortest path through the network
C)neither the longest nor shortest path through the network
D)​it cannot be determined
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
52
​When the project team asks "Are our working relationships with the user effective?" it is doing what?

A)An end of iteration review
B)​An end of project review
C)A performance review
D)​A work breakdown structure
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
53
Which is NOT a criterion that is used to determine how to define tasks for a work breakdown structure.​

A)How to know when the task is complete.
B)​How to estimate the effort required.
C)A logical way to determine its predecessor.
D)​It should take one to five days.
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following is NOT one of the activities associated with staffing the project team?​

A)Conducting team-building exercises.
B)​Developing a resource plan.
C)Organizing work groups.
D)​Setting up programming rules and guidelines.
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
55
The benefits that accrue to an organization,usually measured in dollars,from the deployment of a new system are called ______ ______.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
56
​The present value of $200,000 development costs in year 0 assuming a 10% discount rate is:

A)$180,000
B)$190,000​
C)$200,000
D)​$210,000
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
57
The _______  consists of clients and key manager who review the progress and direct the project.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
58
A document to help define the scope of the new system is called a(n)  _____ _____ _____.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
59
​The creation of a work breakdown structure is helpful in the development of what?

A)Software testing plan.
B)Project iteration schedule.​
C)Detailed work schedule.
D)​Detailed effort estimates of work tasks.
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
60
Which two of the following are activities belonging to the first core process?​

A)Schedule the work
B)​Perform risk and feasibility analysis
C)Choose the project manager
D)​Establish the project environment
E)Evaluate the work processes​
F)Quantify project approval factors
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
61
An increased level of customer satisfaction is an example of a(n)_______ ______.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
62
List the three primary reasons for initiating a software development project.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
63
A project tracking tool that provides a summary of the status of various project items such as open tasks and expenditures is called a(n)______ ______.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
64
The hierarchical list of activities of a project that is used to create work schedule is called the _____ ______ ______.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
65
The point in time at which dollar benefits offset the dollar costs is called the _______ _____ _____ .​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
66
List several (at least four)reasons why projects fail.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
67
What is the term that describes the time period after which the dollar benefits have offset the dollar costs?​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
68
The sequence of tasks in a schedule that cannot be delayed without delaying the project is called the _______ _____ .​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
69
A bar chart that portrays the schedule by the length of horizontal bars is called a _______ _____.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
70
A benefit that can be measured in terms of dollars is called a(n)____ _____.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
71
List three primary criteria to obtain approval for a project. These criteria are often three key questions asked by the client before giving approval.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
72
List the four activities of the first core process: Identify the problem and obtain approval.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
73
The deployment of a new system resulted in the reduction of the office staff from seven people to five people. This is an example of a(n)______ _______.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
74
The meeting held at the end of an iteration to determine what was successful and what can be improved is called what?​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
75
List the three major external responsibilities of a project manager.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
76
List the ten areas of the Project Management Body of Knowledge.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
77
List four primary areas that are considered in risk and feasibility analysis.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
78
The dollar value of benefits reduced by the dollar value of costs combined together and expressed in current dollars is called the ______ _____ _____.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
79
What is the name given to the process of comparing costs and benefits to see whether investing in a new system will be beneficial?​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
80
List several (at least four)of the internal responsibilities of a project manager.​
Unlock Deck
Unlock for access to all 82 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 82 flashcards in this deck.