Deck 6: Construction Services During Design
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
Play
Full screen (f)
Deck 6: Construction Services During Design
1
As project time moves on, the ability to cost-effectively influence changes ????
A) Increases while costs committed increase
B) Increases while costs committed decrease
C) Decreases while costs committed increase
D) Decreases while costs committed decrease
E) None of the above
A) Increases while costs committed increase
B) Increases while costs committed decrease
C) Decreases while costs committed increase
D) Decreases while costs committed decrease
E) None of the above
Decreases while costs committed increase
2
The process an owner should utilize in selecting a construction manager is comparable to the process of selecting an architect or an engineer: review past experience, collect references, and examine the résumés of the key people that will be assigned to the project.
True
3
Investigating and implementing up/down construction is an example of (a)????
A) Mitigation program
B) Constructability analysis
C) Life cycle costing
D) Feasibility study
E) None of the above
A) Mitigation program
B) Constructability analysis
C) Life cycle costing
D) Feasibility study
E) None of the above
Constructability analysis
4
A thorough investigation of the proposed area for construction should occur before ????
A) The determination of the bid package breakdown for the project
B) Detailed scheduling occurs
C) Detailed estimating occurs
D) Moving into the schematic design stage
E) All of the above
A) The determination of the bid package breakdown for the project
B) Detailed scheduling occurs
C) Detailed estimating occurs
D) Moving into the schematic design stage
E) All of the above
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
Selection of the designer must precede selection of the construction manager.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
The best time for a candidate construction management firm to learn the specifics of a proposed project is during the interview stage, as this allows the firm to begin to put together a construction management workplan.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
Identify the stage of design in which the following project activity would normally occur. Use each stage once only.
-Evaluate and finalize mechanical and electrical systems
A) Conceptual planning
B) Contract documents
C) Design development
D) Schematic design
-Evaluate and finalize mechanical and electrical systems
A) Conceptual planning
B) Contract documents
C) Design development
D) Schematic design
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
Identify the stage of design in which the following project activity would normally occur. Use each stage once only.
-Procure final building permit
A) Conceptual planning
B) Contract documents
C) Design development
D) Schematic design
-Procure final building permit
A) Conceptual planning
B) Contract documents
C) Design development
D) Schematic design
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
Identify the stage of design in which the following project activity would normally occur. Use each stage once only.
-Analyze alternate schemes and conduct engineering analysis
A) Conceptual planning
B) Contract documents
C) Design development
D) Schematic design
-Analyze alternate schemes and conduct engineering analysis
A) Conceptual planning
B) Contract documents
C) Design development
D) Schematic design
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
Identify the stage of design in which the following project activity would normally occur. Use each stage once only.
-Evaluate labor and trade contractor market
A) Conceptual planning
B) Contract documents
C) Design development
D) Schematic design
-Evaluate labor and trade contractor market
A) Conceptual planning
B) Contract documents
C) Design development
D) Schematic design
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck

