If specific technical,technological,and production skill information can be transfered by written documents to company vendors,then they qualify as instances of explicit knowledge.
Use Space or
up arrow
down arrow
to flip the card.
Question
PERT and CPM differ regarding the notion of a critical path.
Question
For effective project design,more activities are better than few because that allows greater activity control.
Question
A Gantt project-planning chart is good for any project except those where visualizing the basic structure of the system is required.
Question
With really large and complex projects,the PERT calculations can be done by hand.
Question
One rule that applies to a company's new product selection is to choose products that have attributes that are familiar to management because of existing experiences.It is usually best to play to one's strengths (core competencies).
Question
Projects are time-based endeavors that bring together skills and technology to accomplish goals.
Question
PERT information systems show that team members are communicating with each other while monitoring progress.
Question
Knowledge management of complex systems is usually satisfied by explicit information alone.
Question
The Gantt project-planning chart for a manufacturing system starts with assembling,moves to planning,and ends with certification.
Question
When two or more arrows converge at a single node,choose the smallest value of EF among the converging arrows for the ES value of the next activity.
Question
PERT is the acronymic name for the shortest time-path from start to finish of the project.
Question
Gantt project-planning methods,based on graphical analysis,can lead to optimal resource utilization or provide sufficient project-tracking capability for the complex projects that now are undertaken by large organizations.
Question
Networks representations often consist of arrows and nodes.The arrows connect the nodes while providing a sense of direction by means of the arrow heads.
Question
Concurrent project management is characterized by production managers having the opportunity to work on marketing issues and then marketing has a lot of leeway to work on production problems.
Question
Change management projects are unique work configurations that demand specific capabilities including leadership and teamwork.
Question
In-person,classroom teaching remains one of the best ways to transfer tacit information.
Question
Engineering change orders often appear to be major alterations in the product design but turn out to be minor instead.
Question
Change management projects called (a) require planning,designing,building,testing,redesigning,and implementing the system.
Question
Slack (associated with an activity) describes the amount of time that can be treated as a safety buffer for slippage.
Question
To spend sensibly to decrease the length of the critical path,as a rule of thumb,select first those activities that provide the largest decrease in project time for the least amount of investment.
Question
Many projects move rapidly at the beginning while many ideas are being considered.
Question
The tactical aspect of resource leveling is that it can affect the entire system's timing without changing the budgets.
Question
Resource leveling is an excellent example of fancy bells and whistles which should only be used when the fundamentals of the project's design and analysis have been completed.
Question
Activity time estimation in the PERT system utilizes an optimistic estimate,a pessimistic estimate,and a most likely estimate of time required to complete each project activity.
Question
Crash time is associated with the minimum cost estimate and its time for accomplishment is based on "walk,don't run."
Question
Normal time is associated with the minimum necessary spending on project activities because there is no stress on completing the project as soon as possible.
Question
Resource leveling seeks to move people from understaffed activities to those that are overstaffed.
Question
Good resource allocation decisions are a P/OM project management responsibility.
Question
The fundamental idea of resource leveling is to switch extra resources from places where they are not essential to places where they could be used immediately.
Question
For managers responsible for multiple projects,the sharing of information in an efficient way is an opportunity for synergy and serendipity,through coordination of their efforts.
Question
Crashing is generally used to decrease the length of the critical path.
Question
Crash time is a minimum time estimate to accomplish an activity.Its cost is usually at or near the maximum expenditure level.
Question
Resource leveling provides the option to withdraw resources or to add new resources.
Question
Products have life cycle stages which means that the project environment is dynamic and challenging.
Question
Resource leveling cannot be used effectively to manage multiple projects.
Question
A challenge faced by managers of multiple projects is the need to be juggling ideas and schedules.
Question
The existence of slack is an important condition for resource leveling.
Question
When the variance of a noncritical project path is larger than the variance along the critical path,it is possible that the noncritical path will become critical.
Question
Normal time is associated with the minimum necessary spending on project activities because there is no great stress on completing the project as soon as possible.
Question
Companies that have the systems viewpoint lack the ability to achieve the level of cooperation necessary to win the race.
Question
Correct information gathering is the function of marketing intelligence.
Question
_____ is the interaction of elements that,when combined,produce a total effect that is greater than the sum of the individual elements.

A)Synthesis
B)Synergism
C)Sympathetic empathy
D)none of the above
Question
Projects that are tracked by good information systems require more management time to produce controlled innovative success stories.
Question
Management generally relies upon its ability to estimate before hard data are available.
Question
_____ is responsible for managing the inventory of knowledge that exists in the company.This includes the ability to find,select,and absorb new knowledge to add to the prior encyclopedic storehouse.

A)Explicit knowledge
B)Knowledge management
C)New product management
D)Core competency
Question
Which of the following stages is NOT part of designing new products?

A)concept selection,development and testing
B)estimation and business modeling
C)plant construction
D)process specification and pilot plant
Question
Explicit knowledge is the description of what must be done to make things work.
Question
Explicit information requires synchronous transmission meaning that the teacher and the student must be in direct communication.
Question
Projects can include some repetitive activities.
Question
Unlike explicit knowledge,tacit knowledge never requires synchronous transmission.
Question
Good project-management methods do which of the following?

A)Keep track of what has been done.
B)Point to activities critical for completion.
C)Expedite activities that are slipping.
D)all of the above
Question
Body language is often mentioned as a clue to purpose and intention.
Question
The ultimate test of explicit information is whether it can be studied successfully using distance learning methods.
Question
Which of the following are considered to be part of the five project life-cycle stages?

A)describing the goals
B)planning the project
C)carrying out the project
D)completing the project
E)all of the above
Question
New products accomplish which of the following?

A)help increase the cash flow that sustains a company
B)replace old products that are becoming unprofitable
C)provide opportunities to extend the life of successful product lines
D)support marketing efforts
E)all of the above and more
Question
The project manager views activities with small amounts of slack as the activities that demand constant attention because slippage (especially when there is zero slack) results in project delay.
Question
The kinds of problems encountered in projects are different from those encountered in the job shop and flow shop.
Question
Which of the following is a form of knowledge that describes basic transferable information that is required to operate processes?

A)core knowledge
B)explicit knowledge
C)tacit knowledge
D)none of the above
Question
Which factors are important aspects of project management?

A)There is insufficient ROI until project completion.
B)Rapid completion is essential.
C)Project managers must be guided by strategic planning.
D)all of the above
Question
The _____ path is the longest time-path from start to finish of the project and determines the completion date of the project.

A)forward
B)backward
C)critical
D)economic
Question
In _____,project activities are the connecting arrows.Each arrow starts with a numbered node and ends with a larger numbered node.The arrow can be identified by these numbers.

A)AOL
B)AON
C)AOA
D)EOA
Question
_____ is associated with the minimum necessary spending on project activities because there is no urgency to complete the project as soon as possible.

A)Crash time
B)Normal time
C)Normal program
D)Abnormal time
Question
Which choice is one of the three different methods for obtaining estimates?

A)a person's opinion derived from his or her experiences
B)the pooling of a number of individuals' opinions (derived from their experiences)
C)several parameters of estimation requested from participants and combined
D)all of the above
Question
What does the control management process entail?

A)protecting the system with security and safety measuress
B)running the system
C)shielding the system from external disturbances
D)controlling the inputs,transformations and outputs
E)all of the above
Question
There are two main types of P/OM activities.One is the domain of project managers.The other is the domain of process managers.To highlight this difference,a and b are used to designate each type.Which is the beta type?

A)domain of process managers
B)domain of project managers
Question
Which are characteristics of good project managers?

A)They are accustomed to risk and coping with uncertainties.
B)Their goals are strategic and vitally important to top management and the success of the company.
C)They inspire rapid systems wide cooperation to resolve their problems quickly.
D)all of the above
Question
Which is the most essential rule that applies to project management?

A)Accurate time and cost estimates for all project activities are essential.
B)Backup redundancy of activities should be increased.
C)Expertise is not required to outline project activities and to sequence them correctly.
D)Multiple project leaders are preferred.
Question
_____ enables the project managers to determine how long it will take to complete the project.

A)Forward pass rule
B)Backward pass rule
C)Slack
D)none of the above
Question
_____enables the critical path to be identified and permits the determination of slack.

A)Forward pass rule
B)Backward pass rule
C)Slack rule
D)none of the above
Question
Project redesign is often used to _____.

A)meet the budget
B)lengthening the critical path
C)lengthening completion time
D)all of the above
Question
In general,the most important dimension for evaluating project success is _____.

A)time for completion
B)total cost of the project
C)quality of the completed project
D)all of the above
Question
When using the equation Estimate - Actual result = Error to collect data,it is possible to evaluate estimators in terms of _____.

A)how close their total error is to zero
B)how dispersed are their errors
C)whether their errors tend to be biased
D)all of the above
Question
Every event node in the PERT network is identified with a four-part scorecard. Which of the following is the correct four-part scorecard?

A)EF ES LS LF
B)ES EF LS LF
C)ES EF LF LS
D)ES LF LS EF
Question
Which of the following selections is the set of activities that define the shortest time in which the project can be completed without slippage?

A)path of greatest slack
B)the critical path
C)path of max <strong>Which of the following selections is the set of activities that define the shortest time in which the project can be completed without slippage?</strong> A)path of greatest slack B)the critical path C)path of max   D)path of min   <div style=padding-top: 35px>
D)path of min <strong>Which of the following selections is the set of activities that define the shortest time in which the project can be completed without slippage?</strong> A)path of greatest slack B)the critical path C)path of max   D)path of min   <div style=padding-top: 35px>
Question
Which choice translates to allowable slippage in an activity's schedule along a slack path?

A)LS - ES > 0
B)LF - EF > 0
C)Slack > 0
D)all of the above
Question
_____ is when each activity will be done in the least possible or minimum time.

A)Normal
B)Peaking
C)Crashing
D)Least-time
Question
If you are going to crash one particular activity to get the most effect,which one should be chosen?

A)Choose the activity where Dc/Dt is smallest
B)Choose the activity where Dc/Dt is largest
C)Choose the activity where Dc/Dt = 1
D)Choose the activity where Dc/Dt = 0
Question
The largest value of EF and LF at the last node in the network is the

A)backward pass point of the project.
B)project completion time.
C)time-length of the critical path.
D)all of the above
Question
Which of the following is the first step required to utilize PERT-type network models?

A)Draw a precedence diagram.
B)Estimate the time to perform each activity.
C)Detail all of the activities.
D)Meet with suppliers.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/110
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 18: Project Management for New Products and Processes
1
If specific technical,technological,and production skill information can be transfered by written documents to company vendors,then they qualify as instances of explicit knowledge.
True
2
PERT and CPM differ regarding the notion of a critical path.
False
3
For effective project design,more activities are better than few because that allows greater activity control.
True
4
A Gantt project-planning chart is good for any project except those where visualizing the basic structure of the system is required.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
5
With really large and complex projects,the PERT calculations can be done by hand.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
6
One rule that applies to a company's new product selection is to choose products that have attributes that are familiar to management because of existing experiences.It is usually best to play to one's strengths (core competencies).
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
7
Projects are time-based endeavors that bring together skills and technology to accomplish goals.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
8
PERT information systems show that team members are communicating with each other while monitoring progress.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
9
Knowledge management of complex systems is usually satisfied by explicit information alone.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
10
The Gantt project-planning chart for a manufacturing system starts with assembling,moves to planning,and ends with certification.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
11
When two or more arrows converge at a single node,choose the smallest value of EF among the converging arrows for the ES value of the next activity.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
12
PERT is the acronymic name for the shortest time-path from start to finish of the project.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
13
Gantt project-planning methods,based on graphical analysis,can lead to optimal resource utilization or provide sufficient project-tracking capability for the complex projects that now are undertaken by large organizations.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
14
Networks representations often consist of arrows and nodes.The arrows connect the nodes while providing a sense of direction by means of the arrow heads.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
15
Concurrent project management is characterized by production managers having the opportunity to work on marketing issues and then marketing has a lot of leeway to work on production problems.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
16
Change management projects are unique work configurations that demand specific capabilities including leadership and teamwork.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
17
In-person,classroom teaching remains one of the best ways to transfer tacit information.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
18
Engineering change orders often appear to be major alterations in the product design but turn out to be minor instead.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
19
Change management projects called (a) require planning,designing,building,testing,redesigning,and implementing the system.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
20
Slack (associated with an activity) describes the amount of time that can be treated as a safety buffer for slippage.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
21
To spend sensibly to decrease the length of the critical path,as a rule of thumb,select first those activities that provide the largest decrease in project time for the least amount of investment.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
22
Many projects move rapidly at the beginning while many ideas are being considered.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
23
The tactical aspect of resource leveling is that it can affect the entire system's timing without changing the budgets.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
24
Resource leveling is an excellent example of fancy bells and whistles which should only be used when the fundamentals of the project's design and analysis have been completed.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
25
Activity time estimation in the PERT system utilizes an optimistic estimate,a pessimistic estimate,and a most likely estimate of time required to complete each project activity.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
26
Crash time is associated with the minimum cost estimate and its time for accomplishment is based on "walk,don't run."
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
27
Normal time is associated with the minimum necessary spending on project activities because there is no stress on completing the project as soon as possible.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
28
Resource leveling seeks to move people from understaffed activities to those that are overstaffed.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
29
Good resource allocation decisions are a P/OM project management responsibility.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
30
The fundamental idea of resource leveling is to switch extra resources from places where they are not essential to places where they could be used immediately.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
31
For managers responsible for multiple projects,the sharing of information in an efficient way is an opportunity for synergy and serendipity,through coordination of their efforts.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
32
Crashing is generally used to decrease the length of the critical path.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
33
Crash time is a minimum time estimate to accomplish an activity.Its cost is usually at or near the maximum expenditure level.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
34
Resource leveling provides the option to withdraw resources or to add new resources.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
35
Products have life cycle stages which means that the project environment is dynamic and challenging.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
36
Resource leveling cannot be used effectively to manage multiple projects.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
37
A challenge faced by managers of multiple projects is the need to be juggling ideas and schedules.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
38
The existence of slack is an important condition for resource leveling.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
39
When the variance of a noncritical project path is larger than the variance along the critical path,it is possible that the noncritical path will become critical.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
40
Normal time is associated with the minimum necessary spending on project activities because there is no great stress on completing the project as soon as possible.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
41
Companies that have the systems viewpoint lack the ability to achieve the level of cooperation necessary to win the race.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
42
Correct information gathering is the function of marketing intelligence.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
43
_____ is the interaction of elements that,when combined,produce a total effect that is greater than the sum of the individual elements.

A)Synthesis
B)Synergism
C)Sympathetic empathy
D)none of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
44
Projects that are tracked by good information systems require more management time to produce controlled innovative success stories.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
45
Management generally relies upon its ability to estimate before hard data are available.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
46
_____ is responsible for managing the inventory of knowledge that exists in the company.This includes the ability to find,select,and absorb new knowledge to add to the prior encyclopedic storehouse.

A)Explicit knowledge
B)Knowledge management
C)New product management
D)Core competency
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following stages is NOT part of designing new products?

A)concept selection,development and testing
B)estimation and business modeling
C)plant construction
D)process specification and pilot plant
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
48
Explicit knowledge is the description of what must be done to make things work.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
49
Explicit information requires synchronous transmission meaning that the teacher and the student must be in direct communication.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
50
Projects can include some repetitive activities.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
51
Unlike explicit knowledge,tacit knowledge never requires synchronous transmission.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
52
Good project-management methods do which of the following?

A)Keep track of what has been done.
B)Point to activities critical for completion.
C)Expedite activities that are slipping.
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
53
Body language is often mentioned as a clue to purpose and intention.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
54
The ultimate test of explicit information is whether it can be studied successfully using distance learning methods.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
55
Which of the following are considered to be part of the five project life-cycle stages?

A)describing the goals
B)planning the project
C)carrying out the project
D)completing the project
E)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
56
New products accomplish which of the following?

A)help increase the cash flow that sustains a company
B)replace old products that are becoming unprofitable
C)provide opportunities to extend the life of successful product lines
D)support marketing efforts
E)all of the above and more
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
57
The project manager views activities with small amounts of slack as the activities that demand constant attention because slippage (especially when there is zero slack) results in project delay.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
58
The kinds of problems encountered in projects are different from those encountered in the job shop and flow shop.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
59
Which of the following is a form of knowledge that describes basic transferable information that is required to operate processes?

A)core knowledge
B)explicit knowledge
C)tacit knowledge
D)none of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
60
Which factors are important aspects of project management?

A)There is insufficient ROI until project completion.
B)Rapid completion is essential.
C)Project managers must be guided by strategic planning.
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
61
The _____ path is the longest time-path from start to finish of the project and determines the completion date of the project.

A)forward
B)backward
C)critical
D)economic
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
62
In _____,project activities are the connecting arrows.Each arrow starts with a numbered node and ends with a larger numbered node.The arrow can be identified by these numbers.

A)AOL
B)AON
C)AOA
D)EOA
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
63
_____ is associated with the minimum necessary spending on project activities because there is no urgency to complete the project as soon as possible.

A)Crash time
B)Normal time
C)Normal program
D)Abnormal time
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
64
Which choice is one of the three different methods for obtaining estimates?

A)a person's opinion derived from his or her experiences
B)the pooling of a number of individuals' opinions (derived from their experiences)
C)several parameters of estimation requested from participants and combined
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
65
What does the control management process entail?

A)protecting the system with security and safety measuress
B)running the system
C)shielding the system from external disturbances
D)controlling the inputs,transformations and outputs
E)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
66
There are two main types of P/OM activities.One is the domain of project managers.The other is the domain of process managers.To highlight this difference,a and b are used to designate each type.Which is the beta type?

A)domain of process managers
B)domain of project managers
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
67
Which are characteristics of good project managers?

A)They are accustomed to risk and coping with uncertainties.
B)Their goals are strategic and vitally important to top management and the success of the company.
C)They inspire rapid systems wide cooperation to resolve their problems quickly.
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
68
Which is the most essential rule that applies to project management?

A)Accurate time and cost estimates for all project activities are essential.
B)Backup redundancy of activities should be increased.
C)Expertise is not required to outline project activities and to sequence them correctly.
D)Multiple project leaders are preferred.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
69
_____ enables the project managers to determine how long it will take to complete the project.

A)Forward pass rule
B)Backward pass rule
C)Slack
D)none of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
70
_____enables the critical path to be identified and permits the determination of slack.

A)Forward pass rule
B)Backward pass rule
C)Slack rule
D)none of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
71
Project redesign is often used to _____.

A)meet the budget
B)lengthening the critical path
C)lengthening completion time
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
72
In general,the most important dimension for evaluating project success is _____.

A)time for completion
B)total cost of the project
C)quality of the completed project
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
73
When using the equation Estimate - Actual result = Error to collect data,it is possible to evaluate estimators in terms of _____.

A)how close their total error is to zero
B)how dispersed are their errors
C)whether their errors tend to be biased
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
74
Every event node in the PERT network is identified with a four-part scorecard. Which of the following is the correct four-part scorecard?

A)EF ES LS LF
B)ES EF LS LF
C)ES EF LF LS
D)ES LF LS EF
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
75
Which of the following selections is the set of activities that define the shortest time in which the project can be completed without slippage?

A)path of greatest slack
B)the critical path
C)path of max <strong>Which of the following selections is the set of activities that define the shortest time in which the project can be completed without slippage?</strong> A)path of greatest slack B)the critical path C)path of max   D)path of min
D)path of min <strong>Which of the following selections is the set of activities that define the shortest time in which the project can be completed without slippage?</strong> A)path of greatest slack B)the critical path C)path of max   D)path of min
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
76
Which choice translates to allowable slippage in an activity's schedule along a slack path?

A)LS - ES > 0
B)LF - EF > 0
C)Slack > 0
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
77
_____ is when each activity will be done in the least possible or minimum time.

A)Normal
B)Peaking
C)Crashing
D)Least-time
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
78
If you are going to crash one particular activity to get the most effect,which one should be chosen?

A)Choose the activity where Dc/Dt is smallest
B)Choose the activity where Dc/Dt is largest
C)Choose the activity where Dc/Dt = 1
D)Choose the activity where Dc/Dt = 0
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
79
The largest value of EF and LF at the last node in the network is the

A)backward pass point of the project.
B)project completion time.
C)time-length of the critical path.
D)all of the above
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following is the first step required to utilize PERT-type network models?

A)Draw a precedence diagram.
B)Estimate the time to perform each activity.
C)Detail all of the activities.
D)Meet with suppliers.
Unlock Deck
Unlock for access to all 110 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 110 flashcards in this deck.