Deck 11: Business Basics

Full screen (f)
exit full mode
Question
What is the analysis phase in the SDLC?

A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves gathering and analyzing business requirements, defining any constraints associated with the system, and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production so users can begin to perform actual business operations with the system
Use Space or
up arrow
down arrow
to flip the card.
Question
What is one of the most common reasons why systems development projects fail?

A) Unclear or missing business requirements
B) Lack of JAD sessions
C) Purchasing COTS
D) All of these
Question
What is the design phase in the SDLC?

A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves designing the technical architectures and models
D) Involves placing the system into production so users can begin to perform actual business operations with the system
Question
What is the implementation phase in the SDLC?

A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production and proving user documentation so users can begin to perform actual business operations with the system
Question
Which of the following is a phase in the SDLC?

A) Analysis
B) Design
C) Testing
D) All of these
Question
________ uses small teams to produce small pieces of deliverable software using sprints, or 30-day intervals, to achieve an appointed goal.

A) Rapid application development (RAD)
B) Extreme programming (XP)
C) Rational Unified Process (RUP)
D) Scrum
Question
Which of the following is a business-related consequence of successful software?

A) Increase revenues
B) Damage to brand reputation
C) Incur liabilities
D) Decrease productivity
Question
Which of the following is not a phase in the SDLC?

A) Maintenance
B) Change
C) Design
D) None of these
Question
Which of the following is not a phase in the SDLC?

A) Planning
B) Development
C) RFP
D) Testing
Question
What is a sequential, activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming
Question
_______ provides a framework for breaking down the development of software into four gates.

A) Rapid application development (RAD)
B) Extreme programming (XP)
C) Rational unified process (RUP)
D) Scrum
Question
Which activity is performed during the planning phase of SDLC?

A) Identify and select the system for development
B) Assess project feasibility
C) Develop the project plan
D) All of these
Question
What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming
Question
What is the overall process for developing information systems from planning and analysis through implementation and maintenance?

A) SDLC
B) Software life cycle
C) Application life cycle
D) All of these
Question
What is the second step in the SDLC?

A) Analysis
B) Design
C) Testing
D) Planning
Question
What is the systems development life cycle?

A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) The overall process for developing information systems from planning and analysis through implementation and maintenance
Question
____ like other agile methods, breaks a project into tiny phases, and developers cannot continue on to the next phase until the first phase is complete.

A) Rapid application development (RAD)
B) Extreme programming (XP)
C) Rational unified process (RUP)
D) Scrum
Question
Which differences does not make global data standardization quite difficult?

A) Language
B) Culture
C) Technology
D) Skin colour
Question
_______ methodology emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process.

A) Rapid application development (RAD)
B) Extreme programming (XP)
C) Rational Unified Process (RUP)
D) Scrum
Question
What is the first step in the SDLC?

A) Analysis
B) Design
C) Testing
D) Planning
Question
Which of the following is not one of the tenets in the Agile Alliance's manifesto?

A) Satisfy the customer through early and continuous delivery of valuable software
B) Do not allow changing requirements, especially late in development
C) Business people and developers must work together daily throughout the project
D) All of these
Question
What breaks a project into tiny phases, and developers cannot continue on to the next phase until the first phase is complete?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming
Question
What is a project?

A) A temporary endeavour undertaken to create a unique product or service
B) The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C) Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D) Represent key dates when a certain group of activities must be performed
Question
Which of the following is not a technique for choosing strategic projects?

A) Categorize projects
B) Perform a financial analysis
C) Focus on organizational goals
D) Develop a project plan
Question
Which of the following is a characteristic of a successful project?

A) Delivered on time
B) Delivered within budget
C) Meets the business's requirements
D) All of these
Question
Which of the following is not one of the primary principles an organization should follow for successful agile software development?

A) Slash the budget
B) Keep requirements to a minimum
C) Test and deliver infrequently
D) Assign non-IT executives to software projects
Question
Who is a project manager?

A) An individual who is knowledge and skilled in project activities.
B) An individual who sets up measurable and tangible goals.
C) An individual who funds the project.
D) An individual who is an expert in project planning and management.
Question
What are the primary activities performed by a project manager?

A) Choosing strategic projects
B) Setting the project scope
C) Managing resources and maintaining the project plan
D) All of these
Question
What is project scope?

A) Quantifiable criteria that must be met for the project to be considered a success
B) Products, services, or processes that are not specifically a part of the project
C) Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D) Defines the work that must be completed to deliver a product with the specified features and functions
Question
An organization must identify what it wants to do and how it is going to do it. What does the "what" part of this question focus on?

A) Justification of the project
B) Definition of the project
C) Expected results of the project
D) All of these
Question
An organization must identify what it wants to do and how it is going to do it. What does the "how" part of this question focus on?

A) Justification of the project
B) Definition of the project
C) Analysis of project risks
D) Expected results of the project
Question
What are project deliverables?

A) A temporary endeavour undertaken to create a unique product or service
B) The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C) Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D) Represent key dates when a certain group of activities must be performed
Question
Which of the following is a fundamental of the RAD methodology?

A) Focus initially on creating a prototype that looks and acts like the desired system
B) Actively involve system users in the analysis, design, and development phases
C) Accelerate collecting the business requirements through an interactive and iterative construction approach
D) All of these
Question
What specifically supports the long-term and day-to-day management and execution of the steps in a project?

A) Project management
B) Project management software
C) Scope
D) None of these
Question
What are the three primary variables in any project?

A) Time, cost, expense
B) Time, expense, requirements
C) Time, cost, scope
D) Time, cost, quality
Question
What is the success rate for a project using the waterfall methodology?

A) 1 in 10
B) 2 in 10
C) 4 in 10
D) 8 in 10
Question
What is the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project?

A) Project management
B) Project management software
C) Scope
D) None of these
Question
Which of the following is a business-related consequence of failing software?

A) Decrease productivity
B) Damage to brand reputation
C) Incur liabilities
D) All of these
Question
Which of the following does a project manager perform?

A) Defines and develops the project plan
B) Tracks the plan to ensure all key project milestones are completed on time
C) Expert in project planning and management
D) All of these
Question
What is the number one reason that IT projects fall behind schedule or fail?

A) Change in business goals during the project
B) Lack of support from business management
C) Poor planning or poor project management
D) Change in technology during the project
Question
Which of the following is the most likely reason why companies outsource?

A) Tap outside sources of expertise
B) Concentrate resources on core business
C) Reduce headcount and related expenses
D) Better manage the costs of internal processes
Question
What is a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems?

A) Insourcing
B) Outsourcing
C) Business process outsourcing
D) Offshore outsourcing
Question
What type of chart typically displays the critical path?

A) Gantt chart
B) PERT chart
C) All of these
D) None of these
Question
Which of the following is the primary reason why companies outsource?

A) Tap outside sources of expertise
B) Concentrate resources on core business
C) Reduce headcount and related expenses
D) All of these
Question
In a Gantt chart tasks are listed __________ and the project's timeframe is listed ____________.

A) vertically; horizontally
B) horizontally; vertically
C) vertically; vertically
D) horizontally; horizontally
Question
What is the critical path?

A) The path from resource to task that passes through all critical components of a project plan
B) The path between tasks to the projects finish that passes through all critical components of a project plan
C) The path from start to finish that passes through all the tasks that are critical to completing the project in the shortest amount of time
D) The path from start to finish that passes through all the tasks that are critical to completing the project in the longest amount of time
Question
What is it called when a company uses organizations from developing countries to write code and develop systems?

A) Insourcing
B) Outsourcing
C) Business process outsourcing
D) Offshore outsourcing
Question
What is the responsibility of a change control board?

A) Controlling the change requests
B) Approving the change requests
C) Rejecting the change requests
D) All of these
Question
What are project objectives?

A) Quantifiable criteria that must be met for the project to be considered a success
B) Products, services, or processes that are not specifically a part of the project
C) Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D) Defines the work that must be completed to deliver a product with the specified features and functions
Question
What is the logical relationship that exists between the project tasks, or between a project task and a milestone?

A) Resource
B) Task
C) Dependency
D) Activity
Question
The many benefits associated with outsourcing include which of the following?

A) Increased quality and efficiency of a process, service, or function.
B) Reduced operating expenses.
C) Avoiding costly outlay of capital funds.
D) All are benefits associated with outsourcing.
Question
What is the most important part of the project plan?

A) Gantt chart
B) Specification
C) Communication
D) None of these
Question
What is a graphical network model that depicts a project's tasks and the relationships between those tasks?

A) Gantt chart
B) PERT chart
C) Dependency
D) All of these
Question
Which of the following is not a characteristic of a well-defined project plan?

A) Prepared by the project manager
B) Easy to read
C) Appropriate to the project's size
D) Communicated to all key participants
Question
What is a simple bar chart that depicts project tasks against a calendar?

A) Gantt chart
B) PERT chart
C) Dependency
D) All of these
Question
What do SMART criteria for successful objective creation include?

A) Specific, metrics, agreed upon, real, time valued
B) Specific, measurable, agreed upon, realistic, time framed
C) Specific, measurable, accurate, real, time valued
D) Specific, metrics, agreed upon, realistic, time framed
Question
Which of the following is a benefit an organization can receive from outsourcing?

A) Financial savings
B) Increase technical abilities
C) Market agility
D) All of these
Question
What is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house?

A) Insourcing
B) Outsourcing
C) Business process outsourcing
D) Offshore outsourcing
Question
Which of the following is not the responsibility of a change control board?

A) Controlling the change requests
B) Approving the change requests
C) Rejecting the change requests
D) Managing the projects
Question
Which of the following is the most common function outsourced?

A) IT
B) HR
C) Finance
D) Marketing/sales
Question
All of the following are challenges of outsourcing, except:

A) Contract length
B) Competitive edge
C) Confidentiality
D) Multisourcing
Question
What is the outsourcing option that includes the most remote location and indirect customer control?

A) Onshore outsourcing
B) Nearshore outsourcing
C) Offshore outsourcing
D) None of these
Question
Scrum methodology, like other agile methods, breaks a project into tiny phases, and developers cannot continue on to the next phase until the first phase is complete.
Question
What is the outsourcing option that includes the closest location and direct customer control?

A) Onshore outsourcing
B) Nearshore outsourcing
C) Offshore outsourcing
D) None of these
Question
A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.
Question
The assess project feasibility activity typically occurs during the analysis phase.
Question
Which of the following is the least likely reason why companies outsource?

A) Tap outside sources of expertise
B) Concentrate resources on core business
C) Reduce headcount and related expenses
D) Better manage the costs of internal processes
Question
Testing is the fourth phase in the SDLC.
Question
Designing the IT infrastructure typically occurs during the design phase.
Question
A topology is a set of policies, procedures, standards, processes, practices, tools, techniques, and tasks that people apply to technical and management challenges.
Question
Domestic information systems must support a diverse base of customers, users, products, languages, currencies, laws, and so on.
Question
Which of the following is/are the influential driver(s) affecting the growth of outsourcing markets?

A) Core competencies
B) Rapid growth
C) Industry changes
D) All of these
Question
Difference in language, culture, and technology platforms can make global data standardization quite difficult.
Question
The SDLC is different than the waterfall and agile methodologies not in terms of the type of work that is done, but rather who is control and does most of the design work.
Question
Iterative development consists of a series of tiny projects.
Question
Provide training for the system users typically occurs during the testing phase.
Question
A project charter is a document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.
Question
The traditional waterfall methodology is a sequential, activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Question
Managing people is one of the hardest and most critical efforts a project manager undertakes.
Question
Which of the following is an outsourcing challenge caused by contract length?

A) Difficulties in getting out of a contract
B) Problems in foreseeing future issues
C) Problems in reforming an internal IT department
D) All of these
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/146
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 11: Business Basics
1
What is the analysis phase in the SDLC?

A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves gathering and analyzing business requirements, defining any constraints associated with the system, and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production so users can begin to perform actual business operations with the system
B
2
What is one of the most common reasons why systems development projects fail?

A) Unclear or missing business requirements
B) Lack of JAD sessions
C) Purchasing COTS
D) All of these
A
3
What is the design phase in the SDLC?

A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves designing the technical architectures and models
D) Involves placing the system into production so users can begin to perform actual business operations with the system
C
4
What is the implementation phase in the SDLC?

A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production and proving user documentation so users can begin to perform actual business operations with the system
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following is a phase in the SDLC?

A) Analysis
B) Design
C) Testing
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
6
________ uses small teams to produce small pieces of deliverable software using sprints, or 30-day intervals, to achieve an appointed goal.

A) Rapid application development (RAD)
B) Extreme programming (XP)
C) Rational Unified Process (RUP)
D) Scrum
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is a business-related consequence of successful software?

A) Increase revenues
B) Damage to brand reputation
C) Incur liabilities
D) Decrease productivity
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following is not a phase in the SDLC?

A) Maintenance
B) Change
C) Design
D) None of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following is not a phase in the SDLC?

A) Planning
B) Development
C) RFP
D) Testing
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
10
What is a sequential, activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
11
_______ provides a framework for breaking down the development of software into four gates.

A) Rapid application development (RAD)
B) Extreme programming (XP)
C) Rational unified process (RUP)
D) Scrum
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
12
Which activity is performed during the planning phase of SDLC?

A) Identify and select the system for development
B) Assess project feasibility
C) Develop the project plan
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
13
What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
14
What is the overall process for developing information systems from planning and analysis through implementation and maintenance?

A) SDLC
B) Software life cycle
C) Application life cycle
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
15
What is the second step in the SDLC?

A) Analysis
B) Design
C) Testing
D) Planning
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
16
What is the systems development life cycle?

A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) The overall process for developing information systems from planning and analysis through implementation and maintenance
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
17
____ like other agile methods, breaks a project into tiny phases, and developers cannot continue on to the next phase until the first phase is complete.

A) Rapid application development (RAD)
B) Extreme programming (XP)
C) Rational unified process (RUP)
D) Scrum
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
18
Which differences does not make global data standardization quite difficult?

A) Language
B) Culture
C) Technology
D) Skin colour
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
19
_______ methodology emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process.

A) Rapid application development (RAD)
B) Extreme programming (XP)
C) Rational Unified Process (RUP)
D) Scrum
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
20
What is the first step in the SDLC?

A) Analysis
B) Design
C) Testing
D) Planning
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following is not one of the tenets in the Agile Alliance's manifesto?

A) Satisfy the customer through early and continuous delivery of valuable software
B) Do not allow changing requirements, especially late in development
C) Business people and developers must work together daily throughout the project
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
22
What breaks a project into tiny phases, and developers cannot continue on to the next phase until the first phase is complete?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
23
What is a project?

A) A temporary endeavour undertaken to create a unique product or service
B) The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C) Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D) Represent key dates when a certain group of activities must be performed
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following is not a technique for choosing strategic projects?

A) Categorize projects
B) Perform a financial analysis
C) Focus on organizational goals
D) Develop a project plan
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is a characteristic of a successful project?

A) Delivered on time
B) Delivered within budget
C) Meets the business's requirements
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following is not one of the primary principles an organization should follow for successful agile software development?

A) Slash the budget
B) Keep requirements to a minimum
C) Test and deliver infrequently
D) Assign non-IT executives to software projects
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
27
Who is a project manager?

A) An individual who is knowledge and skilled in project activities.
B) An individual who sets up measurable and tangible goals.
C) An individual who funds the project.
D) An individual who is an expert in project planning and management.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
28
What are the primary activities performed by a project manager?

A) Choosing strategic projects
B) Setting the project scope
C) Managing resources and maintaining the project plan
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
29
What is project scope?

A) Quantifiable criteria that must be met for the project to be considered a success
B) Products, services, or processes that are not specifically a part of the project
C) Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D) Defines the work that must be completed to deliver a product with the specified features and functions
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
30
An organization must identify what it wants to do and how it is going to do it. What does the "what" part of this question focus on?

A) Justification of the project
B) Definition of the project
C) Expected results of the project
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
31
An organization must identify what it wants to do and how it is going to do it. What does the "how" part of this question focus on?

A) Justification of the project
B) Definition of the project
C) Analysis of project risks
D) Expected results of the project
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
32
What are project deliverables?

A) A temporary endeavour undertaken to create a unique product or service
B) The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C) Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D) Represent key dates when a certain group of activities must be performed
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following is a fundamental of the RAD methodology?

A) Focus initially on creating a prototype that looks and acts like the desired system
B) Actively involve system users in the analysis, design, and development phases
C) Accelerate collecting the business requirements through an interactive and iterative construction approach
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
34
What specifically supports the long-term and day-to-day management and execution of the steps in a project?

A) Project management
B) Project management software
C) Scope
D) None of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
35
What are the three primary variables in any project?

A) Time, cost, expense
B) Time, expense, requirements
C) Time, cost, scope
D) Time, cost, quality
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
36
What is the success rate for a project using the waterfall methodology?

A) 1 in 10
B) 2 in 10
C) 4 in 10
D) 8 in 10
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
37
What is the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project?

A) Project management
B) Project management software
C) Scope
D) None of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following is a business-related consequence of failing software?

A) Decrease productivity
B) Damage to brand reputation
C) Incur liabilities
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
39
Which of the following does a project manager perform?

A) Defines and develops the project plan
B) Tracks the plan to ensure all key project milestones are completed on time
C) Expert in project planning and management
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
40
What is the number one reason that IT projects fall behind schedule or fail?

A) Change in business goals during the project
B) Lack of support from business management
C) Poor planning or poor project management
D) Change in technology during the project
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following is the most likely reason why companies outsource?

A) Tap outside sources of expertise
B) Concentrate resources on core business
C) Reduce headcount and related expenses
D) Better manage the costs of internal processes
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
42
What is a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems?

A) Insourcing
B) Outsourcing
C) Business process outsourcing
D) Offshore outsourcing
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
43
What type of chart typically displays the critical path?

A) Gantt chart
B) PERT chart
C) All of these
D) None of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following is the primary reason why companies outsource?

A) Tap outside sources of expertise
B) Concentrate resources on core business
C) Reduce headcount and related expenses
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
45
In a Gantt chart tasks are listed __________ and the project's timeframe is listed ____________.

A) vertically; horizontally
B) horizontally; vertically
C) vertically; vertically
D) horizontally; horizontally
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
46
What is the critical path?

A) The path from resource to task that passes through all critical components of a project plan
B) The path between tasks to the projects finish that passes through all critical components of a project plan
C) The path from start to finish that passes through all the tasks that are critical to completing the project in the shortest amount of time
D) The path from start to finish that passes through all the tasks that are critical to completing the project in the longest amount of time
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
47
What is it called when a company uses organizations from developing countries to write code and develop systems?

A) Insourcing
B) Outsourcing
C) Business process outsourcing
D) Offshore outsourcing
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
48
What is the responsibility of a change control board?

A) Controlling the change requests
B) Approving the change requests
C) Rejecting the change requests
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
49
What are project objectives?

A) Quantifiable criteria that must be met for the project to be considered a success
B) Products, services, or processes that are not specifically a part of the project
C) Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D) Defines the work that must be completed to deliver a product with the specified features and functions
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
50
What is the logical relationship that exists between the project tasks, or between a project task and a milestone?

A) Resource
B) Task
C) Dependency
D) Activity
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
51
The many benefits associated with outsourcing include which of the following?

A) Increased quality and efficiency of a process, service, or function.
B) Reduced operating expenses.
C) Avoiding costly outlay of capital funds.
D) All are benefits associated with outsourcing.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
52
What is the most important part of the project plan?

A) Gantt chart
B) Specification
C) Communication
D) None of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
53
What is a graphical network model that depicts a project's tasks and the relationships between those tasks?

A) Gantt chart
B) PERT chart
C) Dependency
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following is not a characteristic of a well-defined project plan?

A) Prepared by the project manager
B) Easy to read
C) Appropriate to the project's size
D) Communicated to all key participants
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
55
What is a simple bar chart that depicts project tasks against a calendar?

A) Gantt chart
B) PERT chart
C) Dependency
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
56
What do SMART criteria for successful objective creation include?

A) Specific, metrics, agreed upon, real, time valued
B) Specific, measurable, agreed upon, realistic, time framed
C) Specific, measurable, accurate, real, time valued
D) Specific, metrics, agreed upon, realistic, time framed
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following is a benefit an organization can receive from outsourcing?

A) Financial savings
B) Increase technical abilities
C) Market agility
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
58
What is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house?

A) Insourcing
B) Outsourcing
C) Business process outsourcing
D) Offshore outsourcing
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
59
Which of the following is not the responsibility of a change control board?

A) Controlling the change requests
B) Approving the change requests
C) Rejecting the change requests
D) Managing the projects
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following is the most common function outsourced?

A) IT
B) HR
C) Finance
D) Marketing/sales
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
61
All of the following are challenges of outsourcing, except:

A) Contract length
B) Competitive edge
C) Confidentiality
D) Multisourcing
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
62
What is the outsourcing option that includes the most remote location and indirect customer control?

A) Onshore outsourcing
B) Nearshore outsourcing
C) Offshore outsourcing
D) None of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
63
Scrum methodology, like other agile methods, breaks a project into tiny phases, and developers cannot continue on to the next phase until the first phase is complete.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
64
What is the outsourcing option that includes the closest location and direct customer control?

A) Onshore outsourcing
B) Nearshore outsourcing
C) Offshore outsourcing
D) None of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
65
A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
66
The assess project feasibility activity typically occurs during the analysis phase.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
67
Which of the following is the least likely reason why companies outsource?

A) Tap outside sources of expertise
B) Concentrate resources on core business
C) Reduce headcount and related expenses
D) Better manage the costs of internal processes
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
68
Testing is the fourth phase in the SDLC.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
69
Designing the IT infrastructure typically occurs during the design phase.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
70
A topology is a set of policies, procedures, standards, processes, practices, tools, techniques, and tasks that people apply to technical and management challenges.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
71
Domestic information systems must support a diverse base of customers, users, products, languages, currencies, laws, and so on.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following is/are the influential driver(s) affecting the growth of outsourcing markets?

A) Core competencies
B) Rapid growth
C) Industry changes
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
73
Difference in language, culture, and technology platforms can make global data standardization quite difficult.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
74
The SDLC is different than the waterfall and agile methodologies not in terms of the type of work that is done, but rather who is control and does most of the design work.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
75
Iterative development consists of a series of tiny projects.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
76
Provide training for the system users typically occurs during the testing phase.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
77
A project charter is a document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
78
The traditional waterfall methodology is a sequential, activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
79
Managing people is one of the hardest and most critical efforts a project manager undertakes.
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following is an outsourcing challenge caused by contract length?

A) Difficulties in getting out of a contract
B) Problems in foreseeing future issues
C) Problems in reforming an internal IT department
D) All of these
Unlock Deck
Unlock for access to all 146 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 146 flashcards in this deck.