Deck 6: Systems Development and Project Management

Full screen (f)
exit full mode
Question
Project milestones are any measurable,tangible,verifiable outcome,result or item that is produced to complete a project or part of a project.
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following is a business-related consequence of successful software?

A)Increased revenues
B)Damage to brand reputation
C)Increased liabilities
D)Increased expenses
Question
The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.
Question
What is the overall process for developing information systems from planning and analysis through implementation and maintenance?

A)Systems development life cycle
B)Project management
C)Systems management
D)Project development life cycle
Question
The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Question
Which software development methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?

A)RAD methodology
B)Agile methodology
C)Waterfall methodology
D)Extreme programming
Question
What is the implementation phase in the SDLC?

A)Involves establishing a high-level plan of the intended project and determining project goals
B)Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C)Involves describing the desired features and operations of the system
D)Involves placing the system into production so users can begin to perform actual business operations with the system
This is the definition of the implementation phase in the SDLC.
Question
What development style consists of a series of tiny projects?

A)Waterfall methodology
B)Iterative development
C)Agile methodology
D)All the answers are correct
Question
What is a business requirement?

A)The non-specific business requests the system must meet to be successful
B)The specific business requests the system must meet to be successful
C)The non-specific methodology the system must meet to be successful
D)The specific methodology the system must meet to be successful
Question
What is the analysis phase in the SDLC?

A)Involves establishing a high-level plan of the intended project and determining project goals
B)Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C)Involves describing the desired features and operations of the system
D)Involves placing the system into production so users can begin to perform actual business operations with the system
This is the definition of the analysis phase in the SDLC.
Question
What is the systems development life cycle (SDLC)?

A)Involves establishing a high-level plan of the intended project and determining project goals
B)Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C)Involves describing the desired features and operations of the system
D)The overall process for developing information systems from planning and analysis through implementation and maintenance
Question
Which of the following is an issue related to the waterfall methodology?

A)Flaws in accurately defining and articulating the business problem
B)Managing costs, resources and time constraints
C)Assumes users can specify all business requirements in advance
D)All the answers are correct
Question
What is a set of policies,procedures,standards,processes,practices,tools,techniques and tasks that people apply to technical and management challenges?

A)SDLC
B)Methodology
C)Waterfall
D)Agile
Question
Which of the following describes agile?

A)Fast and efficient
B)Small and nimble
C)Lower cost
D)All the answers are correct
Question
Which phase of the SDLC gathers business requirements?

A)Plan
B)Analysis
C)Test
D)Design
Question
What is the design phase in the SDLC?

A)Involves establishing a high-level plan of the intended project and determining project goals
B)Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C)Involves describing the desired features and operations of the system
D)Involves placing the system into production so users can begin to perform actual business operations with the system
This is the definition of the design phase in the SDLC.
Question
Which of the following represents the phases in the SDLC?

A)Plan, analysis, design, test, maintain, develop, implement
B)Analysis, plan, design, test, develop, maintain, implement
C)Plan, analysis, design, develop, test, implement, maintain
D)Analysis, plan, develop, design, test, implement, maintain
Question
Preventing liabilities is a business-related consequence of failed software.
Question
Which of the following is a business-related consequence of failing software?

A)Decrease productivity
B)Damage to brand reputation
C)Increased liabilities
D)All the answers are correct
Question
A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.
Question
What is an arrangement by which one organisation provides a service or services for another organisation that chooses not to perform them in-house?

A)In-sourcing
B)Outsourcing
C)Business process outsourcing
D)Offshore outsourcing
Question
Which of the following is a characteristic of a successful project?

A)Delivered on time
B)Delivered within budget
C)Meets the business' requirements
D)All the answers are correct
Question
Which of the following is a major reason why companies outsource?

A)Tap outside sources of expertise
B)Concentrate resources on core business
C)Reduce headcount and related expenses
D)Better manage the costs of internal processes
Question
What is the number one reason that IT projects fail?

A)Change in business goals during the project
B)Lack of support from business management
C)Inadequately gathered business requirements
D)Change in technology during the project
Question
The prototype is an essential part of the analysis phase when using which methodology?

A)Scrum
B)XP
C)RAP
D)RAD
Question
How many days is a typical sprint in the scrum methodology?

A)2 days
B)10 days
C)30 days
D)90 days
Question
What are the three primary variables (or triple constraints) in any project?

A)Time, cost, expense
B)Time, expense, requirements
C)Time, cost, scope
D)Time, cost, quality
Question
Which methodology ends or begins each day with a stand-up meeting to monitor and control the development effort?

A)Scrum
B)XP
C)RUP
D)RAD
Question
What breaks a project into tiny phases and means that developers cannot continue on to the next phase until the first phase is complete?

A)RAD methodology
B)Agile methodology
C)Waterfall methodology
D)Extreme programming
Question
Which of the following is not one of the basic four parts of the XP methodology?

A)Planning
B)Collaboration
C)Coding
D)Testing
Question
Which of the following is not a primary form of agile methodology?

A)RAD
B)SDLC
C)RUP
D)Scrum
Question
What is the application of knowledge,skills,tools and techniques to project activities to meet project requirements?

A)Project management
B)Project management software
C)Scope
D)None of above
Question
Which methodology uses small teams to produce small pieces of deliverable software using sprints,or 30-day intervals,to achieve an appointed goal?

A)Scrum
B)XP
C)RUP
D)RAD
Question
What is a common approach using the professional expertise within an organisation to develop and maintain the organisation's information technology systems?

A)In-sourcing
B)Outsourcing
C)Business process outsourcing
D)Offshore outsourcing
Question
Which part of the XP methodology includes user stories,stand-up meetings and small releases?

A)Designing
B)Planning
C)Testing
D)Coding
Question
What methodology emphasises extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

A)RAD methodology
B)Agile methodology
C)Waterfall methodology
D)Extreme programming
This is the definition of RAD.
Question
Which of the following is a benefit an organisation can receive from outsourcing?

A)Financial savings
B)Increase technical abilities
C)Market agility
D)All the answers are correct
Question
Which of the following is a fundamental of the RAD methodology?

A)Focus initially on creating a prototype that looks and acts like the desired system
B)Actively involve system users in the analysis, design and development phases
C)Accelerate collecting the business requirements through an interactive and iterative construction approach
D)All the answers are correct
Question
Which segment of the XP methodology stresses not to add functionality until it is needed?

A)Testing
B)Coding
C)Designing
D)Planning
Question
What is it called when a company uses organisations from developing countries to write code and develop systems?

A)In-sourcing
B)Outsourcing
C)Business process outsourcing
D)Offshore outsourcing
Question
Which of the following is not a technique for choosing strategic projects?

A)Categorise projects
B)Perform a financial analysis
C)Focus on organisational goals
D)Develop a project plan
Question
What type of chart typically displays the critical path?

A)Gantt chart
B)PERT chart
C)Both Gantt and PERT are correct
D)Neither Gantt nor PERT is correct
Question
What is a project manager?

A)The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
B)Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
C)Represent key dates when a certain group of activities must be performed
D)An individual who is an expert in project planning and management
Question
Who are individuals and organisations actively involved in the project or whose interests might be affected as a result of project execution or project completion?

A)Project manager
B)Project stakeholders
C)Executive sponsor
D)All the answers are correct
Question
What are project assumptions?

A)Specific factors that can limit options
B)Factors that are considered to be true, real, or certain without proof or demonstration
C)Quantifiable criteria that must be met for the project to be considered a success
D)A document issued by the project initiator or sponsor that formally authorises the existence of a project and provides the project manager with the authority to apply organisational resources to project activities
Question
What is a project charter?

A)Specific factors that can limit options
B)Factors that are considered to be true, real, or certain without proof or demonstration
C)Quantifiable criteria that must be met for the project to be considered a success
D)A document issued by the project initiator or sponsor that formally authorises the existence of a project and provides the project manager with the authority to apply organisational resources to project activities
Question
What is a simple bar chart that depicts project tasks against a calendar?

A)Gantt chart
B)PERT chart
C)Dependency
D)All the answers are correct
Question
An organisation must identify what it wants to do and how it is going to do it.What does the 'how' part of this question focus on?

A)Justification of the project
B)Definition of the project
C)Analysis of project risks
D)Expected results of the project
Question
What is a project?

A)A temporary activity undertaken to create a unique product, service, or result
B)The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C)Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D)Represent key dates when a certain group of activities must be performed
Question
What are project constraints?

A)Specific factors that can limit options
B)Factors that are considered to be true, real, or certain without proof or demonstration
C)Quantifiable criteria that must be met for the project to be considered a success
D)A document issued by the project initiator or sponsor that formally authorises the existence of a project and provides the project manager with the authority to apply organisational resources to project activities
Question
Who is the person or group who provides the financial resources for the project?

A)Project manager
B)Project stakeholders
C)Executive sponsor
D)All the answers are correct
Question
What is project scope?

A)Quantifiable criteria that must be met for the project to be considered a success
B)Products, services, or processes that are not specifically a part of the project
C)Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D)Defines the work that must be completed to deliver a product with the specified features and functions
Question
What is an internal department that oversees all organisational projects?

A)Project deliverables
B)Project scope
C)Project management office
D)Project milestones
Question
What is the logical relationship that exists between the project tasks,or between a project task and a milestone?

A)Resource
B)Task
C)Dependency
D)Activity
Question
What are project deliverables?

A)A temporary endeavour undertaken to create a unique product or service
B)The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C)Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D)Represent key dates when a certain group of activities must be performed
Question
What is a graphical network model that depicts a project's tasks and the relationships between those tasks?

A)Gantt chart
B)PERT chart
C)Dependency
D)All the answers are correct
Question
What are project objectives?

A)Quantifiable criteria that must be met for the project to be considered a success
B)Products, services, or processes that are not specifically a part of the project
C)Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D)Defines the work that must be completed to deliver a product with the specified features and functions
Question
Which of the following does a project manager perform?

A)Defines and develops the project plan
B)Tracks the plan to ensure all key project milestones are completed on time
C)Expert in project planning and management
D)All the answers are correct
Question
What do SMART criteria for successful objective creation include?

A)Specific, metrics, agreed upon, real, time valued
B)Specific, measurable, agreed upon, realistic, time framed
C)Specific, measurable, accurate, real, time valued
D)Specific, metrics, agreed upon, realistic, time framed
Question
An organisation must identify what it wants to do and how it is going to do it.What does the 'what' part of this question focus on?

A)Justification of the project
B)Definition of the project
C)Expected results of the project
D)All the answers are correct
Question
Describe the two primary diagrams most frequently used in project planning.
Question
The _________ phase involves placing the system into production so users can begin to perform actual business operations with the system.
Question
Explain project management and the role the triple constraints play when managing a project.
Question
Explain the three different types of outsourcing along with their benefits and challenges.
Question
Summarise the different software development methodologies.
Question
Time,cost and ___________ are the three primary variables in any project.
Question
Which of the following is a common reason why change occurs?

A)A misunderstanding of the initial scope
B)Organisational changes, such as mergers, acquisitions and partnerships, that create new business problems and opportunities
C)An omission in defining initial scope
D)All the answers are correct
Question
Identify the three primary areas a project manager must focus on managing to ensure success.
Question
Which of the following is an outsourcing challenge caused by contract length?

A)Difficulties in getting out of a contract
B)Problems in foreseeing future issues
C)Problems in re-forming an internal IT department
D)All the answers are correct
Question
What is the critical path?

A)The path from resource to task that passes through all critical components of a project plan
B)The path between tasks to the projects finish that passes through all critical components of a project plan
C)The path from start to finish that passes through all the tasks that are critical to completing the project in the shortest amount of time
D)The path from start to finish that passes through all the tasks that are critical to completing the project in the longest amount of time
Question
Describe the seven phases of the systems development life cycle.
Question
Explain the business benefits associated with successful software development.
Question
The rapid application development methodology emphasises extensive user involvement in the rapid and evolutionary construction of working __________ of a system to accelerate the systems development process.
Question
Which of the following is not a guideline for effectively dealing with change management?

A)Engage and empower stakeholders systematically and iteratively
B)Align systems with the change
C)Anticipate change
D)Stop change
Question
The R in the SMART criteria for successful objective creation stands for _________.
Question
The _________ methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirement.
Question
All of the following are challenges of outsourcing,except:

A)Contract length
B)Competitive edge
C)Confidentiality
D)Reduced frustration and expense related to hiring and retaining employees in an exceptionally tight job market
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/77
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 6: Systems Development and Project Management
1
Project milestones are any measurable,tangible,verifiable outcome,result or item that is produced to complete a project or part of a project.
False
2
Which of the following is a business-related consequence of successful software?

A)Increased revenues
B)Damage to brand reputation
C)Increased liabilities
D)Increased expenses
A
3
The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.
False
4
What is the overall process for developing information systems from planning and analysis through implementation and maintenance?

A)Systems development life cycle
B)Project management
C)Systems management
D)Project development life cycle
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
5
The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
6
Which software development methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?

A)RAD methodology
B)Agile methodology
C)Waterfall methodology
D)Extreme programming
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
7
What is the implementation phase in the SDLC?

A)Involves establishing a high-level plan of the intended project and determining project goals
B)Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C)Involves describing the desired features and operations of the system
D)Involves placing the system into production so users can begin to perform actual business operations with the system
This is the definition of the implementation phase in the SDLC.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
8
What development style consists of a series of tiny projects?

A)Waterfall methodology
B)Iterative development
C)Agile methodology
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
9
What is a business requirement?

A)The non-specific business requests the system must meet to be successful
B)The specific business requests the system must meet to be successful
C)The non-specific methodology the system must meet to be successful
D)The specific methodology the system must meet to be successful
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
10
What is the analysis phase in the SDLC?

A)Involves establishing a high-level plan of the intended project and determining project goals
B)Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C)Involves describing the desired features and operations of the system
D)Involves placing the system into production so users can begin to perform actual business operations with the system
This is the definition of the analysis phase in the SDLC.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
11
What is the systems development life cycle (SDLC)?

A)Involves establishing a high-level plan of the intended project and determining project goals
B)Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C)Involves describing the desired features and operations of the system
D)The overall process for developing information systems from planning and analysis through implementation and maintenance
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is an issue related to the waterfall methodology?

A)Flaws in accurately defining and articulating the business problem
B)Managing costs, resources and time constraints
C)Assumes users can specify all business requirements in advance
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
13
What is a set of policies,procedures,standards,processes,practices,tools,techniques and tasks that people apply to technical and management challenges?

A)SDLC
B)Methodology
C)Waterfall
D)Agile
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following describes agile?

A)Fast and efficient
B)Small and nimble
C)Lower cost
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
15
Which phase of the SDLC gathers business requirements?

A)Plan
B)Analysis
C)Test
D)Design
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
16
What is the design phase in the SDLC?

A)Involves establishing a high-level plan of the intended project and determining project goals
B)Involves analysing end-user business requirements and refining project goals into defined functions and operations of the intended system
C)Involves describing the desired features and operations of the system
D)Involves placing the system into production so users can begin to perform actual business operations with the system
This is the definition of the design phase in the SDLC.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
17
Which of the following represents the phases in the SDLC?

A)Plan, analysis, design, test, maintain, develop, implement
B)Analysis, plan, design, test, develop, maintain, implement
C)Plan, analysis, design, develop, test, implement, maintain
D)Analysis, plan, develop, design, test, implement, maintain
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
18
Preventing liabilities is a business-related consequence of failed software.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following is a business-related consequence of failing software?

A)Decrease productivity
B)Damage to brand reputation
C)Increased liabilities
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
20
A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
21
What is an arrangement by which one organisation provides a service or services for another organisation that chooses not to perform them in-house?

A)In-sourcing
B)Outsourcing
C)Business process outsourcing
D)Offshore outsourcing
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is a characteristic of a successful project?

A)Delivered on time
B)Delivered within budget
C)Meets the business' requirements
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is a major reason why companies outsource?

A)Tap outside sources of expertise
B)Concentrate resources on core business
C)Reduce headcount and related expenses
D)Better manage the costs of internal processes
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
24
What is the number one reason that IT projects fail?

A)Change in business goals during the project
B)Lack of support from business management
C)Inadequately gathered business requirements
D)Change in technology during the project
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
25
The prototype is an essential part of the analysis phase when using which methodology?

A)Scrum
B)XP
C)RAP
D)RAD
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
26
How many days is a typical sprint in the scrum methodology?

A)2 days
B)10 days
C)30 days
D)90 days
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
27
What are the three primary variables (or triple constraints) in any project?

A)Time, cost, expense
B)Time, expense, requirements
C)Time, cost, scope
D)Time, cost, quality
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
28
Which methodology ends or begins each day with a stand-up meeting to monitor and control the development effort?

A)Scrum
B)XP
C)RUP
D)RAD
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
29
What breaks a project into tiny phases and means that developers cannot continue on to the next phase until the first phase is complete?

A)RAD methodology
B)Agile methodology
C)Waterfall methodology
D)Extreme programming
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following is not one of the basic four parts of the XP methodology?

A)Planning
B)Collaboration
C)Coding
D)Testing
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is not a primary form of agile methodology?

A)RAD
B)SDLC
C)RUP
D)Scrum
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
32
What is the application of knowledge,skills,tools and techniques to project activities to meet project requirements?

A)Project management
B)Project management software
C)Scope
D)None of above
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
33
Which methodology uses small teams to produce small pieces of deliverable software using sprints,or 30-day intervals,to achieve an appointed goal?

A)Scrum
B)XP
C)RUP
D)RAD
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
34
What is a common approach using the professional expertise within an organisation to develop and maintain the organisation's information technology systems?

A)In-sourcing
B)Outsourcing
C)Business process outsourcing
D)Offshore outsourcing
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
35
Which part of the XP methodology includes user stories,stand-up meetings and small releases?

A)Designing
B)Planning
C)Testing
D)Coding
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
36
What methodology emphasises extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

A)RAD methodology
B)Agile methodology
C)Waterfall methodology
D)Extreme programming
This is the definition of RAD.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following is a benefit an organisation can receive from outsourcing?

A)Financial savings
B)Increase technical abilities
C)Market agility
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following is a fundamental of the RAD methodology?

A)Focus initially on creating a prototype that looks and acts like the desired system
B)Actively involve system users in the analysis, design and development phases
C)Accelerate collecting the business requirements through an interactive and iterative construction approach
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
39
Which segment of the XP methodology stresses not to add functionality until it is needed?

A)Testing
B)Coding
C)Designing
D)Planning
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
40
What is it called when a company uses organisations from developing countries to write code and develop systems?

A)In-sourcing
B)Outsourcing
C)Business process outsourcing
D)Offshore outsourcing
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
41
Which of the following is not a technique for choosing strategic projects?

A)Categorise projects
B)Perform a financial analysis
C)Focus on organisational goals
D)Develop a project plan
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
42
What type of chart typically displays the critical path?

A)Gantt chart
B)PERT chart
C)Both Gantt and PERT are correct
D)Neither Gantt nor PERT is correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
43
What is a project manager?

A)The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
B)Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
C)Represent key dates when a certain group of activities must be performed
D)An individual who is an expert in project planning and management
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
44
Who are individuals and organisations actively involved in the project or whose interests might be affected as a result of project execution or project completion?

A)Project manager
B)Project stakeholders
C)Executive sponsor
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
45
What are project assumptions?

A)Specific factors that can limit options
B)Factors that are considered to be true, real, or certain without proof or demonstration
C)Quantifiable criteria that must be met for the project to be considered a success
D)A document issued by the project initiator or sponsor that formally authorises the existence of a project and provides the project manager with the authority to apply organisational resources to project activities
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
46
What is a project charter?

A)Specific factors that can limit options
B)Factors that are considered to be true, real, or certain without proof or demonstration
C)Quantifiable criteria that must be met for the project to be considered a success
D)A document issued by the project initiator or sponsor that formally authorises the existence of a project and provides the project manager with the authority to apply organisational resources to project activities
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
47
What is a simple bar chart that depicts project tasks against a calendar?

A)Gantt chart
B)PERT chart
C)Dependency
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
48
An organisation must identify what it wants to do and how it is going to do it.What does the 'how' part of this question focus on?

A)Justification of the project
B)Definition of the project
C)Analysis of project risks
D)Expected results of the project
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
49
What is a project?

A)A temporary activity undertaken to create a unique product, service, or result
B)The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C)Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D)Represent key dates when a certain group of activities must be performed
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
50
What are project constraints?

A)Specific factors that can limit options
B)Factors that are considered to be true, real, or certain without proof or demonstration
C)Quantifiable criteria that must be met for the project to be considered a success
D)A document issued by the project initiator or sponsor that formally authorises the existence of a project and provides the project manager with the authority to apply organisational resources to project activities
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
51
Who is the person or group who provides the financial resources for the project?

A)Project manager
B)Project stakeholders
C)Executive sponsor
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
52
What is project scope?

A)Quantifiable criteria that must be met for the project to be considered a success
B)Products, services, or processes that are not specifically a part of the project
C)Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D)Defines the work that must be completed to deliver a product with the specified features and functions
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
53
What is an internal department that oversees all organisational projects?

A)Project deliverables
B)Project scope
C)Project management office
D)Project milestones
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
54
What is the logical relationship that exists between the project tasks,or between a project task and a milestone?

A)Resource
B)Task
C)Dependency
D)Activity
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
55
What are project deliverables?

A)A temporary endeavour undertaken to create a unique product or service
B)The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C)Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D)Represent key dates when a certain group of activities must be performed
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
56
What is a graphical network model that depicts a project's tasks and the relationships between those tasks?

A)Gantt chart
B)PERT chart
C)Dependency
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
57
What are project objectives?

A)Quantifiable criteria that must be met for the project to be considered a success
B)Products, services, or processes that are not specifically a part of the project
C)Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D)Defines the work that must be completed to deliver a product with the specified features and functions
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following does a project manager perform?

A)Defines and develops the project plan
B)Tracks the plan to ensure all key project milestones are completed on time
C)Expert in project planning and management
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
59
What do SMART criteria for successful objective creation include?

A)Specific, metrics, agreed upon, real, time valued
B)Specific, measurable, agreed upon, realistic, time framed
C)Specific, measurable, accurate, real, time valued
D)Specific, metrics, agreed upon, realistic, time framed
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
60
An organisation must identify what it wants to do and how it is going to do it.What does the 'what' part of this question focus on?

A)Justification of the project
B)Definition of the project
C)Expected results of the project
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
61
Describe the two primary diagrams most frequently used in project planning.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
62
The _________ phase involves placing the system into production so users can begin to perform actual business operations with the system.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
63
Explain project management and the role the triple constraints play when managing a project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
64
Explain the three different types of outsourcing along with their benefits and challenges.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
65
Summarise the different software development methodologies.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
66
Time,cost and ___________ are the three primary variables in any project.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
67
Which of the following is a common reason why change occurs?

A)A misunderstanding of the initial scope
B)Organisational changes, such as mergers, acquisitions and partnerships, that create new business problems and opportunities
C)An omission in defining initial scope
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
68
Identify the three primary areas a project manager must focus on managing to ensure success.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following is an outsourcing challenge caused by contract length?

A)Difficulties in getting out of a contract
B)Problems in foreseeing future issues
C)Problems in re-forming an internal IT department
D)All the answers are correct
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
70
What is the critical path?

A)The path from resource to task that passes through all critical components of a project plan
B)The path between tasks to the projects finish that passes through all critical components of a project plan
C)The path from start to finish that passes through all the tasks that are critical to completing the project in the shortest amount of time
D)The path from start to finish that passes through all the tasks that are critical to completing the project in the longest amount of time
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
71
Describe the seven phases of the systems development life cycle.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
72
Explain the business benefits associated with successful software development.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
73
The rapid application development methodology emphasises extensive user involvement in the rapid and evolutionary construction of working __________ of a system to accelerate the systems development process.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
74
Which of the following is not a guideline for effectively dealing with change management?

A)Engage and empower stakeholders systematically and iteratively
B)Align systems with the change
C)Anticipate change
D)Stop change
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
75
The R in the SMART criteria for successful objective creation stands for _________.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
76
The _________ methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirement.
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
77
All of the following are challenges of outsourcing,except:

A)Contract length
B)Competitive edge
C)Confidentiality
D)Reduced frustration and expense related to hiring and retaining employees in an exceptionally tight job market
Unlock Deck
Unlock for access to all 77 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 77 flashcards in this deck.